Irfan Fawzi
Analisis risiko kegagalan heat recovery steam generator (HRSG) PLTGU dengan pendekatan FMEA = The analyse of failure risk on heat recovery steam generator (HRSG) PLTGU by FMEA oncoming
2017
 UI - Skripsi Membership
Robby Muliadi
Studi analisis kinerja combined cycle dengan air breathing derivative gas turbine, heat recovery steam generator dan steam turbine sebagai mesin propulsi LNG tanker = Performance analysis of combined cycle with air breathing derivative gas turbine, heat recovery steam generator and steam turbine as LNG tanker main engine propulsion system
Universitas Indonesia, 2017
 UI - Skripsi Membership
Optimisasi effisiensi wasteheat boiler di PT Pupuk Kujang
Fakultas Teknik Universitas Indonesia, 1992
 UI - Skripsi Membership
Bondan Adinugroho
Analisa kelayakan tekno-ekonomi penggantian pembangkit listrik dan uap air eksisting di Fasilitas Gas Processing Kilang LNG Arun = Techno-economic feasibility analysis of replacement of existing power and steam generator at Arun LNG Plant Gas Processing Facility
Fakultas Teknik Universitas Indonesia, 2021
 UI - Tesis Membership
Fitria Nurina Listya Ningrum
Analisis hubungan tekanan panas dengan gangguan kesehatan pada pekerja proyek pembangunan PLTGU Muara Karang tahun 2019 = Analysis of the relationship between heat stress and heat disorders in Muara Karang PLTGU project 2019
Fakultas Kesehatan Masyarakat Universitas Indonesia, 2019
 UI - Skripsi Membership