Khrisna Yudi
Pengembangan skema kelembagaan untuk mencapai pengelolaan light rail transit yang optimal berbasis decision support system = Development of institutional framework scheme to achieve optimum LRT's management based on decision support system / Khrisna Yudi
2016
 UI - Tesis (Membership)
Fuad Adrian Iskandar
Pengembangan model pengambilan keputusan transit oriented development pada kawasan stasiun LRT Jabodebek untuk memaksimalkan ridership = Developing decision-making model on transit oriented development around LRT Jabodebek station areas to maximize ridership / Fuad Adrian Iskandar
2018
 UI - Tesis (Membership)
Lusiana Indarwati
Percepatan waktu pelaksanaan pekerjaan struktur bawah dengan metode fast track berbasis zonasi (studi kasus: Transit Oriented Development (TOD) LRT Kelapa Gading - Velodrome fase I) = Time acceleration of under structure works at Transit Oriented Development (TOD) LRT Kelapa Gading Velodrome phase I project with fast track method zonation based / Lusiana Indarwati
2019
 UI - Tesis (Membership)
Wuri Anny Yumantini
Skema pendanaan proyek light rail transit di Wilayah DKI Jakarta untuk memperoleh kelayakan finansial pada pembentukan komponen database dan modelbase sistem pendukung keputusan = Funding scheme of light rail transit project in Jakarta to obtain financial feasibility of the establishment of components database and modelbase in decision support system / Wuri Anny Yumantini
2016
 UI - Tesis (Membership)
Aswin
Case study of RAMS management for LRT DKI Jakarta at design phase = Studi kasus manajemen RAMS untuk LRT DKI Jakarta pada fase desain
2018
 UI - Skripsi (Membership)