Nanang Tri Wahyuna
Strategi Pemeliharaan Pada Sistem Boiler Pembangkit Listrik Tenaga Uap (PLTU) Berdasarkan Reliability Centered Maintenance (RCM) = Maintenance Strategy on The Boiler System Steam Power Plant Based on Reliability Centered Maintenance (RCM)
Fakultas Teknik Universitas Indonesia, 2016
 UI - Tesis (Membership)
Mohammad Dicky Amrullah
Penilaian reliability pembangkit listrik tenaga panas bumi (PLTP) 60 megawatt = Reliability assesment of 60 megawatt geothermal power plant
Fakultas Teknik Universitas Indonesia, 2016
 UI - Skripsi Membership
Butarbutar, Marathur
Perancangan model keputusan risiko maintenance berdasarkan reliability centered maintenance pada pembangkit listrik tenaga uap = Designing risk based maintenance decision model through reliability centered maintenance in steam power plant
Fakultas Teknik Universitas Indonesia, 2014
 UI - Tesis (Membership)
Arief Surachman
Optimisasi multi-objektif pembangkit listrik tenaga panas bumi (PLTP) berdasarkan analisis exergy, exergoeconomic dan exergoenvironment = Optimization of multi-objective geothermal power plant based on exergy, exergoeconomic and exergoenvironment analysis
Fakultas Teknik Universitas Indonesia, 2018
 UI - Disertasi (Membership)
Sherly
Merangking peralatan kritis di pembangkit listrik tenaga panas bumi area Kamojang unit A dengan menggunakan metode analytic hierarchy process (AHP) dan metode fuzzy borda count (FBC) = Ranking of critical equipment in geothermal power plants Kamojang unit A using analytic hierarchy process (AHP) method and fuzzy borda count (FBC) method
Fakultas Teknik Universitas Indonesia, 2017
 UI - Skripsi (Membership)