Mellynia Tri Sugiarti
Pengaruh durasi buka reject kemasan terhadap peningkatan overall equipment effectiveness (OEE) pada proses striping mesin chentai APM 320 = Effect of opening rejected packaging duration on overall equipment effectiveness (OEE) improvement in chentai APM 320 machine stripping process
Fakultas Farmasi Universitas Indonesia, 2022
 UI - Tugas Akhir
Laurentio Daniel Caesar Perdana Putra
Analisis dan Penanganan Permasalahan Mesin Autostacker pada Area Black Produk A Untuk Meningkatkan Overall Equipment Effectiveness (OEE) Mesin Pengemasan Primer = Analysis and Handling of Auto Stacker Machine Problems in the Black Area of Product A to Increase Overall Equipment Effectiveness (OEE) of Primary Packaging Machines
Fakultas Farmasi Universitas Indonesia, 2024
 UI - Tugas Akhir
Aqqilla Rinanda Arenta Putri
Praktik Kerja di PT Guardian Pharmatama (Evaluasi Penerapan Perubahan Formasi Operator Terhadap Nilai Overall Equipment Effectiveness (OEE) pada Mesin Stripping Chentai 320) = Work Practices at PT Guardian Pharmatama (Evaluation of the Implementation of Changes in Operator Formation on the Overall Equipment Effectiveness (OEE) Value on the Chentai 320 Stripping Machine)
Fakultas Farmasi Universitas Indonesia, 2023
 UI - Tugas Akhir
Susanti Oktaria
Perhitungan dan analisa nilai Overall Equipment Effectiveness (OEE) pada proses awal pengolahan kelapa sawit (studi kasus : PT. X) = Calculation and analysis of the Overall Equipment Effectiveness (OEE) in palm oil processing initial process (case study: PT. X)
Fakultas Teknik Universitas Indonesia, 2011
 UI - Skripsi Open
Panggalo, Irwandi
Pengukuran dan analisis nilai overall equipment effectivenes (OEE) sebagai dasar perbaikan sistem manufaktur pipa baja = Measurement and analysis value of overall equipment effectiveness (OEE) as improvement base of tube pipe manufacture system
Fakultas Teknik Universitas Indonesia, 2008