UI - Skripsi Membership :: Kembali

UI - Skripsi Membership :: Kembali

Pengurangan kepadatan penumpang dan perlambatan aliran penumpang akibat keberadaan area komersial pada stasiun bawah tanah mrt jakarta = Reducing passenger density and slow passenger flow due to commercial area presence in mrt jakarta subway

Reiner Agastya; (Fakultas Teknik Universitas Indonesia, 2014)

 Abstrak

ABSTRAK
Area komersial telah semakin berkembang dan berkontribusi pada pendapatan perusahaan industri transportasi masal. Pengelola industri tersebut menyewakan kios kepada para pelaku bisnis di bandar udara dan stasiun yang kemudian akan memberikan pendapatan non-tarif (non-fare box revenue). Pendapatan dari area komersial ini akan segera diimplementasikan juga oleh PT MRT Jakarta pada stasiun – stasiun yang sedang dibangun. Di sisi lain kelancaran aliran penumpang dan kenyamanan penumpang di dalam area stasiun tetap menjadi prioritas utama PT MRT Jakarta. Keberadaan area komersial pada stasiun MRT Jakarta kemudian diperkirakan akan berdampak pada peningkatan kepadatan penumpang di sekitar area komersial, sehingga aliran penumpang mengalami perlambatan. Dampak tersebut akan menyebabkan turunnya kepuasan dan kenyamanan para penumpang. Perbaikan dan renovasi area komersial pada stasiun MRT (terutama stasiun bawah tanah) akan menelan biaya yang besar jika sampai terjadi masalah tersebut. Oleh karena itu, penelitian ini mengajukan desain area komersial sebagai usaha mengurangi dampak negatif tersebut dengan pendekatan pemodelan berbasis agen. Hasil simulasi menunjukkan bahwa usaha pengurangan dampak negatif area komersial terhadap aliran penumpang yang diusulkan dapat mengurangi perlambatan pergerakan penumpang dan peningkatan kepadatan penumpang di sekitar area komersial.

ABSTRACT
Commercial area has been increasingly developing and contributing to the company's earnings of mass transportation industry. The industrial business renting stalls to businessman at airports and stations which will then give the non - fare box revenue. Revenue from the commercial area will soon be implemented also by PT MRT Jakarta at the stations being built. On the other hand the smooth flow of passengers and passenger comfort in the station area remains a top priority of PT MRT Jakarta. The existence of a commercial area on the MRT station then expected to result in increased passenger densities around commercial areas , thus slowing the flow of passengers. The impact will cause a decrease in the satisfaction and comfort of the passengers. Repair and renovation of commercial area on the MRT (subway stations especially) would cost big if the problem occurs. Therefore , this study propose the design of a commercial area as efforts to reduce the negative impact of the agent -based modeling approach. The simulation results indicate that efforts to reduce the negative impact of the commercial area of the passenger flow is proposed to reduce the deceleration movement of passengers and an increase in the density of passengers around the commercial area.

 File Digital: 1

Shelf
 S53202-Reiner Agastya.pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S53202
Entri utama-Nama orang :
Program Studi :
Subjek :
Penerbitan : [Place of publication not identified]: Fakultas Teknik Universitas Indonesia, 2014
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online source
Deskripsi Fisik : xiii, 91 pages : illustration ; 28 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S53202 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20368617
Cover