Penilaian level kematangan proyek engineering, procurement, and construction (EPC) dengan menggunakan pendekatan sustainable construction = Assessing the maturity level of engineering procurement and construction (EPC) project using sustainable construction approach

Fitri Oktavia Nugroho; Fauzia Dianawati, supervisor; Inaki Maulida Hakim, examiner; Irvanu Rahman, examiner (Fakultas Teknik Universitas Indonesia, 2016)

 Abstrak

Pelaksanaan proyek konstruksi EPC yang dikelola oleh perusahaan jasa konstruksi tidak hanya mempertimbangkan aspek teknis seperti biaya, waktu, dan ruang lingkup tetapi juga aspek manajemen proyek yang berkaitan dengan kematangan internal perusahaan dalam mengelola proyek. Seiring dengan perkembangan teori dalam bisnis konstruksi, terdapat pertimbangan aspek lainnya yaitu aspek sustainability.
Penerapan praktik sustainability dalam pelaksanaan proyek EPC menjadi tantangan bagi perusahaan mengingat aktivitas proyek dapat mempengaruhi lingkungan dalam kurun waktu jangka panjang dan menghasilkan limbah dalam jumlah besar. Oleh sebab itu, perusahaan berupaya menerapkan praktik ini pada aktivitas proyek yang berfokus pada tiga aspek yaitu aspek ekonomi, lingkungan, dan sosial. Penelitian ini bertujuan untuk memberikan rekomendasi praktik sustainability pada studi kasus proyek yang dikemukakan yaitu proyek EPC Sumpal Compression.
Hasil penelitian dengan menggunakan metode Distance to Ideal Maturity Level (DIML) dan Importance Performance Analysis (IPA) menunjukkan bahwa proyek ini sudah mencapai level kematangan ketiga dengan lima dari 20 subfaktor penilaian perlu dilakukan perbaikan agar ketercapaian level kematangan proyek meningkat jelang batas akhir kontrak pelaksanaan proyek tersebut.

The execution of EPC construction project which is managed by the construction services company is not only consider technical aspects such as cost, time, and scope but also aspects of project management related to the maturity of corporate internal in managing the project. Along with the development of theory in construction business, there is other consideration aspects in the execution of EPC construction project i.e aspects of sustainability.
The application of sustainability practices in this execution becomes a challenge for the company because the project activities can affect the environment in the long term and produce large amounts of waste. Therefore, the company strived to apply these practices into the project activities focus on three aspects, namely economic aspects, environmental, and social. This paper aims to provide recommendations on sustainability practices in case studies that addressed to EPC Sumpal Compression project.
The results of this paper using the method of Distance to Ideal Maturity Level (DIML) and Importance Performance Analysis (IPA) shows that the project has achieved the third level of project maturity with five out of the 20 indicators assessment need to improve in order to increase the achievement of project maturity level by the end of this contract.

 File Digital: 1

Shelf
 S63918-Fitri oktavia nugroho .pdf :: Unduh

LOGIN required

 Metadata

Jenis Koleksi : UI - Skripsi Membership
No. Panggil : S63918
Entri utama-Nama orang :
Entri tambahan-Nama orang :
Program Studi :
Subjek :
Penerbitan : Depok: Fakultas Teknik Universitas Indonesia, 2016
Bahasa : ind
Sumber Pengatalogan : LibUI ind rda
Tipe Konten : text
Tipe Media : unmediated ; computer
Tipe Carrier : volume ; online resource
Deskripsi Fisik : xiv, 95 pages : illustration ; 30 cm + appendix
Naskah Ringkas :
Lembaga Pemilik : Universitas Indonesia
Lokasi : Perpustakaan UI, Lantai 3
  • Ketersediaan
  • Ulasan
  • Sampul
No. Panggil No. Barkod Ketersediaan
S63918 14-18-353090134 TERSEDIA
Ulasan:
Tidak ada ulasan pada koleksi ini: 20429316
Cover