Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 8198 dokumen yang sesuai dengan query
cover
Oppenheimer, J. Robert
New York: Simon and Schuster, 1955
504 OPP o
Buku Teks SO  Universitas Indonesia Library
cover
"Plutonium (Pu) and minor actinedes (MA) recycling in standard BWR with equilibrium burnup model has been studied..."
ITJOSCI
Artikel Jurnal  Universitas Indonesia Library
cover
Arum Puni Rijanti
"Sistem kelistrikan Jawa-Bali pernah mengalami krisis sampai pertengahan tahun 2009, sumber: Kompas, Sabtu 31 Mei 2008. Pemadaman tidak bisa dihindari karena kapasitas pembangkit PLN tidak bertambah secara signifikan. Dengan pertumbuhan konsumsi listrik di atas 6 persen, cadangan daya pun terus tergerus. Rata-rata pertumbuhan pemakaian listrik pada kuartal I-2008 mencapai 6,8 persen, sementara target pertumbuhan dalam Anggaran Pendapatan dan Belanja Negara (APBN) 2008 hanya 1,9 persen. Dengan menggunakan patokan pertumbuhan itu pula, pemerintah menetapkan kuota bahan bakar minyak (BBM) untuk PLN sebanyak 9,1 kiloliter. Sementara itu, realisasi pemakaian BBM sampai April 2008 sudah mencapai 3,651 juta kiloliter atau 42,24 persen dari kuota. Cadangan daya tergerus menjadi 25 persen dari batas yang seharusnya 40 persen.
Sistem kelistrikan Jawa-Bali mengalami defisit 800-900 MW, yang mengakibatkan pemadaman bergilir di wilayah Banten, DKI Jakarta, Jawa Barat, Jawa Tengah, Jawa Timur Daerah Istimewa Yogyakarta dan Bali. Defisit disebabkan beberapa hal antara lain penurunan daya di sejumlah pembangkit PLN dan Swasta, kenaikan beban pemakaian listrik di Jawa-Bali, serta ketidaklancaran pasokan BBM ke pembangkit PLN. Hal ini terjadi karena masih dominan menggunakan pembangkit listrik berbahan bakar fosil. Cadangan bahan bakar fosil lama kelamaan akan habis kalau tidak disiasati dalam pemakaiannya. Penggunaan bahan bakar fosil ini pula yang dapat meningkatkan kadar emisi CO2 dan SO2 yang merupakan pemicu adanya pemanasan global.
Kajian ini bertujuan untuk melihat rencana optimasi pengambangan pembangkit listrik Jawa Bali dengan membandingkan pemakaian batubara dan nuklir bila dilihat dari nilai fungsi obyek, LOLP, emisi CO2 dan SO2. Diaman hasil tahun keluaran PLTN akan dipakai untuk perhitungan aliran daya bila PLTN masuk ke sistem Jawa Bali dan membandingkan rencana lokasi penempatan PLTN yaitu Banten dan Semenanjung Muria.

Electrical systems Java-Bali has experienced a crisis until the mid-2009, source: Kompas, Saturday, May 31, 2008. Extinction cannot be avoided because of PLN's generating capacity has not increased significantly. With electricity consumption growth above 6 percent, the reserves were dwindling resources. The average electricity consumption growth in the first quarter of 2008 reached 6.8 percent, while the growth target in the Budget Revenue and Expenditure (Budget) in 2008 only 1.9 percent. By using the same standards that growth, the government set a quota of oil fuel (BBM) to PLN 9.1 of kiloliters. Meanwhile, the realization of the use of fuel until April 2008 has reached 3.651 million kiloliters, or 42.24 percent of the quota. Backup power eroded to 25 percent of the limit should be 40 percent.
System of Java-Bali electricity deficit 800-900 MW, which resulted in rotating blackouts in the area of Banten, DKI Jakarta, West Java, Central Java, East Java, Yogyakarta and Bali. The deficit caused by several things including a decrease in the number of power plants and private sectors, an increase in electricity consumption load in Java-Bali, and the smooth fuel supply for power plants. This happens because it is still the dominant power plants using fossil fuel. Fossil fuel reserves will run out over time if not saving in its use. The use of these fossil fuels also can increase the levels of CO2 and SO2 emissions which are the trigger of global warming.
This study aims to look at plans floating power plant optimization Java and Bali by comparing the use of coal and nuclear when viewed from the value of object function, LOLP, CO2 and SO2 emissions. The results in output of nuclear power plants will be used to calculate the flow of power when nuclear power plants into the Java-Bali system and compare the plans of where to place nuclear plants Banten and Muria Peninsula.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
T26713
UI - Tesis Open  Universitas Indonesia Library
cover
Qiqi Asmara
"Bagi Indonesia, fenomena krisis energi yang sedang melanda saat ini setidaknya telah menyadarkan bahwa seharusnya untuk selalu mengikuti kemajuan dan perkembangan ilmu pengetahuan dan teknologi yang melaju sangat cepat. Dimana kecenderungan masyarakat dunia sekarang adalah untuk lebih banyak menggunakan ilmu pengetahuan dan teknologi dalam memperoleh energi. Salah satunya dengan pemanfaatan pengembangan nuklir sebagai bahan energi alternatif. Pokok permasalahan yang berusaha diketengahkan dalam penelitian ini adalah sebagai berikut: Bagaimanakah kebijakan PLTN di Indonesia, serta apa hambatan implementasi rencana pembangunan PLTN di Jepara, sehingga dapat dilakukan penelitian evaluasi implementasi kebijakan penyediaan PLTN sebagai energi alternatif dengan harapan dapat memperoleh informasi yang menyeluruh. Sementara tujuan dari penelitian ini adalah mengetahui implementasi kebijakan PLTN di Indonesia dan mengidentifikasi hambatan implementasi rencana pembangunan PLTN di Jepara.
Penelitian ini dilakukan dengan metode penelitian kualitatif dengan desain deskriptif, dimana data yang dipergunakan pada penulisan penelitian ini menggambarkan realitas sosial yang muncul dilapangan. Dimana data kualitatif yang diperoleh kemudian berbentuk data kuantitatif. Sehubungan dengan kebijakan pembangunan PLTN di Indonesia, maka pemerintah tidak akan dapat melaksanakan fungsinya dengan efesien dan efektif tanpa mempertimbangkan keuntungan apa saja yang dapat diperoleh apabila Indonesia memiliki Pembangkit Listrik Tenaga Nuklir. Pertanyaan seperti ini cukup wajar dikemukakan mengingat kenyataan bahwa Indonesia, walaupun telah mengoperasikan tiga reaktor nuklir sejak beberapa dekade dan memiliki fasilitas penelitian dan pengembangan nuklir sejak tahun 1980-an, masih terbatas kemampuan teknologinya, bahwa PLTN harus dibangun dengan bantuan pemasok teknologi nuklir dari luar negeri, bahwa PLTN harus dibangun dengan bantuan pemasok teknologi nuklir dari luar negeri, dan bahkan tahap awal PLTN terpaksa dioperasikan dengan bahan nuklir yang di import.

For Indonesia, the phenomenon of en energy crisis that happen nowadays at least have made us realize that we should always keep up with the technology and science?s advancement and improvement that rapidly developing, with the current trend of the world community to maximize the utilization of science and technology to get energy. One of them is the development of nuclear power as an alternative source of energy. The main problems that would like to be featured in this research are as follows: How is the policy for Nuclear Power Plant in Indonesia, and what are the challenges for the implementation of the plan to build a Nuclear Power Plant in Jepara, so a research on the evaluation of the policy implementation for Nuclear Power Plant as an Alternative Energy Source with the hope that a complete information can be gathered. As for this research aim are to understand the implementation of the policy for the Nuclear Power Plant in Indonesia and to identify the challenges for the implementation of the plan to build a Nuclear Power Plant in Jepara.
This research is done by qualitative research method using descriptive design, where the data that used in this paper describe the social reality that present in the field. Qualitative data that gathered will be in quantitative data format. In relation with the policy to build a Nuclear Power Plant in Indonesia, the government cannot perform its function efficiently and effectively without considering the benefits that will be gained if Indonesia has its own Nuclear Power Plant. Questions like this will be surfacing, considering that Indonesia, even though has operating three nuclear reactors for several decades and has the research and development facility since the 80?s still has limited technological capabilities, that the Power Plant has to be build with the assistance from foreign nuclear technology supplier, and even in the early stage the Power Plant has to be operated with imported nuclear materials."
Depok: Universitas Indonesia, 2009
T26803
UI - Tesis Open  Universitas Indonesia Library
cover
Glasstone, Samuel, 1897-1986
New Jersey: D. Van Nostrand , 1958
539.76 GLA s
Buku Teks SO  Universitas Indonesia Library
cover
Sianturi, Artha Ika Sari
"ABSTRAK
"Metode pengendalian suatu proses dengan menggunakan pengendali fuzzy selama ini telah berkembany dengan pesat Perkembangan ini disebabkan oleh kemampuan pengendali fuzzy mengatasi ketidaklinieran suatu sistem Pengendali fuzzy yang dapat mengimplernentasikan pola pikir dari seorang operator dapat menghasilkan pengendaii yang ""cerdas"". Hal mii tidak dapat dihasilkan oleh pengendali yang biasanya didesain secara matematis dan mengahaikan beberapa sifat sistem yang tidak linier agar didapatkan pengendali yang sederhana.
NaMun, dalam mendesain suatu pengendali fuzzy pun terdapat beberapa masalah seperti tidak mudahnya membentuk suatu fungsi keanggotaan input dan output pengendali, sulitnya menentukan aturan yang dipergunakan sebagal rule base. Kesulitan menentukan aturan ini karena pada dasarnya tiap ahli (expert) akan mengutarakan aturan-aturan yang berbeda.
Untuk itulah diperlukan tuning aturan atau faktor skala agar diperoleh unjuk kerja pengendali yang baik. Ketika pengendali didesain, pengendali di-tune sesuai dengan keadaan simulasi sistem. Bahkan jika pengendali telah di-tune dengan balk, faktor skala atau aturan tersebut perlu di-tune setelah instalasi pengendali.
Steam generator pada pembangkit listrik tenaga nuklir adalah sistem yang penting karena faktor keamanan pembangkit listrik dan is merupakan sistem yang menghasilkan uap bagi turbin yang akan menggerakan generator dan kemudian akan menghasilkan listrik. Karena hal-hal tersebut seseorang tidak dapat melakukan tuning secara terus menerus untuk menghindari kecelakaan atau efek lain yang tidak diinginkan karena proses tuning yang tidak tepat."

"
2000
S39651
UI - Skripsi Membership  Universitas Indonesia Library
cover
Lansdell, Norman
Middlesex: Penguin Books, 1958
539.76 LAN a
Buku Teks SO  Universitas Indonesia Library
cover
Benaya Adiguna
"Setelah Perang Dunia II berakhir, hubungan Amerika dan Uni Soviet berubah dari kawan menjadi lawan. Benturan antara dua ideologi berkembang menjadi perlombaan senjata nuklir yang melibatkan kedua negara. Ketika tahun 1969, Soviet berhasil mengimbangi kekuatan nuklir Amerika sehingga timbul upaya untuk mencegah terjadinya perang antara kedua negara. Keran perundingan pun dibuka untuk menjembatani persaingan dua superpower ini.
Tujuan dari penulisan ini adalah untuk menambah khzanah ilmu pengetahuan terutama sejarah militer dan politik internasional. Sumber-sumber yang dipakai adalah sumber buku, artikel dan arsip yang sudah dipublikasikan. Melalui penulisan ini penulis menyimpulkan bahwa perundingan ini tidak berjalan seperti yang diharapkan karena terbentur konflik kepentingan.

After World War II, relationship between United States and Soviet Union changed from friend to foe. The clash of ideology developed into nuclear arms race which is involved this two countries, In 1969, Soviet succeed to balanced United States nuclear power which developed effort to prevent war between them. Diplomacy was opened to bridged the competition between two superpower.
The purpose of this research is to add more knowledge about military history and international politics. This research use sources like books, article, and published archive. Researcher conclude that the arms control was not going in the right track because to many conflict of interest between United States and Soviet Union.
"
Depok: Fakultas Ilmu Pengetahuan Budaya Universitas Indonesia, 2012
S42612
UI - Skripsi Open  Universitas Indonesia Library
cover
Ferguson, Charles D.
New York: Oxford Univesity Press, 2011
333.792 4 FER n
Buku Teks SO  Universitas Indonesia Library
cover
Agus Sumaryanto
"ABSTRAK
Rencana pembangunan PLTN di Indonesia merupakan isu publik yang menarik untuk diperdebatkan, terutama setelah bencana tsunami yang melanda Jepang yang memicu terjadinya kecelakaan reaktor nuklir di Fukushima. Di satu sisi, PLTN merupakan solusi untuk mengatasi krisis energi listrik di Indonesia, tetapi di sisi lain faktor keselamatan dan kesiapan sumberdaya manusia pengelola PLTN menyebabkan timbulnya penolakan masyarakat. Penelitian ini bertujuan untuk mempelajari faktor-faktor yang mempengaruhi penerimaan masyarakat terhadap PLTN dan seberapa besar pengaruh dari faktor-faktor tersebut. Untuk mempelajari hal tersebut digunakan model logit dengan penerimaan terhadap PLTN sebagai variabel dependen.
Data yang digunakan dalam penelitian ini adalah data sekunder yang diambil dari dari data hasil survey yang dilakukan oleh BATAN pada tahun 2011 terhadap 255 responden yang berusia di atas 17 tahun yang tersebar di tiga wilayah, yaitu Jepara, Serang, dan Pontianak. Penelitian ini menunjukkan bahwa kepercayaan masyarakat terhadap kemampuan SDM dalam menguasai iptek nuklir dan tingkat pendidikan masyarakat berpengaruh positif pada penerimaan masyarakat terhadap PLTN. Sedangkan kepuasan masyarakat terhadap pasokan listrik dari PLN dan pekerjaan responden sebagai pedagang berpengaruh negatif pada penerimaan masyarakat terhadap PLTN. Sementara itu, pemahaman masyarakat mengenai manfaat energi nuklir dan pentingnya penggunaan energi alternatif tidak berpegaruh pada penerimaan masyarakat terhadap PLTN. Penelitian ini juga menunjukkan bahwa fenomena NIMBY bukan merupakan dasar penolakan masyarakat terhadap PLTN.

ABSTRACT
Government’s plan to construct the first nuclear power plant in Indonesia has become a debatable public issue, particularly after tsunami disaster in Japan which caused nuclear accident in Fukushima nuclear power plant. Nuclear power plant is considered as the most feasible solution for electricity crisis in Indonesia, but on the other hand its safety aspect and the availability of qualified human resources to run and manage nuclear power plant have caused many resistances. The purpose of this study is to investigate the factors affecting public acceptance on nuclear power plant and to measure how big the impact is. This study employs a logit model using public acceptance on nuclear power plant as its dependent variable, using a secondary data which is taken from survey which is conducted by BATAN in 2011 to 255 respondents which are older than 17 years old over three areas, i.e. Jepara, Serang, and Pontianak.
This study has several findings. First, public trust on human resources capability on nuclear science and technology and the education level of the respondent has a positive impact on public acceptance on nuclear power plant. Second, the satisfaction level of respondent on electricity service provided by PLN and respondent’s occupation as businessman has a negative impact on public acceptance on nuclear power plant. Third, respondent’s perception regarding the benefit of nuclear energy and the needs of alternative energy have no effect on public acceptance on nuclear power plant. Finally, NIMBY fenomena has no correlation with negative public acceptance on nuclear power plant."
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2013
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>