Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 31499 dokumen yang sesuai dengan query
cover
Hadi Soedarso
Depok: Universitas Indonesia, 1993
S28125
UI - Skripsi Membership  Universitas Indonesia Library
cover
cover
Ali Nuryanto
Depok: Universitas Indonesia, 1998
S28399
UI - Skripsi Membership  Universitas Indonesia Library
cover
Yudia
Depok: Universitas Indonesia, 1998
S28480
UI - Skripsi Membership  Universitas Indonesia Library
cover
Pringga Satria Panji
"Perkembangan wilayah Bekasi, Depok dan Tangerang memicu pembangunan infrastruktur seperti gedung perkantoran, pusat perbelanjaan, perumahan dan infrastruktur lain. Pembangunan infrastruktur tersebut rentan terhadap bahaya gempa dan perlu dilakukan upaya pencegahan bahaya gempa. Dalam penelitian ini, analisis percepatan gempa dengan metode analisis respon tanah dilakukan dalam rangka reduksi bahaya gempa. Jumlah titik peak ground acceleration (PGA) untuk wilayah Bekasi bernilai antara 0,36 g - 0,39 g. Rentang nilai PGA untuk wilayah Depok bernilai 0,22 g - 0,24 g. Sedangkan, rata-rata nilai PGA untuk wilayah Tangerang adalah 0,22 g. Keseluruhan titik tinjauan akan menghasilkan nilai PGA untuk masing-masing tempat dan nilai PGA tersebut akan di-plot ke dalam peta kontur percepatan gempa. Peta kontur percepatan gempa Bekasi, Depok dan Tangerang akan digabungkan dengan peta kontur DKI Jakarta (hasil penelitian sebelumnya).

The development in Bekasi, Depok and Tangerang triggers the development of infrastructure such as office buildings, shopping centers, housing and other infrastructure. These infrastructures are prone to seismic hazard and prevention efforts need to be done. In this study, ground response analyses were conducted within the framework of earthquake hazard reduction. Peak ground acceleration (PGA) value for Bekasi region ranged between 0.36 g - 0.39 g. Then, PGA for Depok region worth between 0.22 g - 0.24 g. Meanwhile, the average PGA value for the Tangerang region was 0.22 g. All the data points are used to produce a seismic microzonation map. This map is a combination of a contour map of Jakarta (done in previous studies)."
Depok: Fakultas Teknik Universitas Indonesia, 2011
S50692
UI - Skripsi Open  Universitas Indonesia Library
cover
Risman Harif Abidin
Depok: Fakultas Teknik Universitas Indonesia, 1998
S37149
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hutapea, Kevin Samuel Ivan Siantra
"Energi listrik merupakan salah satu faktor terpenting dalam kehidupan manusia hingga saat ini. Oleh karena itu, apabila terdapat suatu kawasan yang telah menjadi pemukiman masyarakat, maka sangat mendesak tempat tersebut untuk mendapatkan suplai energi listrik yang sesuai dengan kebutuhan. Namun, ada beberapa daerah di Indonesia yang masih belum mendapatkan pasokan listrik. Salah satu daerah yang belum mendapat pasokan listrik yang cukup adalah Kalimantan Barat. Masih ada beberapa daerah di Kalbar yang pasokan listriknya belum memenuhi kebutuhan, terutama saat terjadi beban puncak. Untuk mengatasi hal tersebut, pemerintah Indonesia melalui PLN mengadakan kesepakatan untuk mengimpor listrik dari Sarawak, Malaysia. Penulis melihat ada alternatif lain untuk memenuhi kebutuhan listrik yaitu dengan memanfaatkan energi terbarukan. Posisinya yang dilintasi garis khatulistiwa menjadikan pembangkit listrik tenaga surya sebagai salah satu solusi alternatif yang dapat ditetapkan untuk memenuhi kebutuhan listrik Kalbar. Dalam tugas akhir ini, penulis merancang konfigurasi sistem pembangkit listrik tenaga surya dan mengkaji lebih jauh aspek keekonomiannya dibandingkan dengan daya eksisting yang dipasok dari Malaysia. Analisis tekno-ekonomi akan dilakukan untuk menganalisis sistem tenaga energi terbarukan dengan sumber surya. Dengan demikian dapat dilihat dan dianalisis perbandingannya dari segi biaya keseluruhan, keandalan, kelayakan, dan efektivitas. Aspek optimasi penelitian ini adalah, net present cost (NPC), renewable penetration, dan cost of energy (COE). Tesis ini akan memberikan evaluasi kinerja keuangan dan energi dari solusi yang diusulkan menggunakan HOMER Pro. Hasil simulasi menunjukkan bahwa dengan penerapan photovoltaic dapat menekan biaya produksi energi karena separuh produksinya berasal dari energi terbarukan. Hasil penelitian ini juga menunjukkan bahwa penerapan sistem PV on-grid dapat mempercepat penyediaan listrik di Kalimantan Barat.

Electrical energy is one of the most important factors in human life until this day. Therefore, if there is an area that has become a community settlement, it is urgent for that place to get the supply of electrical energy as needed. However, there are some areas in Indonesia that still have not received electricity supply. One of the areas that has not received sufficient electricity supply is West Kalimantan. There are still several areas in West Kalimantan where the electricity supply has not met demand, especially when peak loads occur. To overcome this, the Indonesian government through PLN entered into an agreement to import electricity from Sarawak, Malaysia. Author sees there are another alternative option to meet electricity needs which is by utilizing renewable energy. Its position which is crossed by the equator makes solar power plants one of the alternative solutions that can be set to fulfill West Kalimantan's electricity needs. In this thesis, author designed a configuration of solar power plant system and investigate further about the economical aspect comparing to existing power that supplied from Malaysia. Techno-economic analysis will be conducted to analyze the renewable energy power system with solar sources. By that way, it can be seen and analyzed the comparison in terms of overall cost, reliability, feasibility, and effectiveness. The aspects of optimizing this research are, net present cost (NPC), renewable penetration, and cost of energy (COE). This thesis will provide a financial and energy performance evaluation of the proposed solution using HOMER Pro. The result of the simulation shows that by implementing photovoltaic it can reduce the cost of energy since the half of production comes from renewable energy. The result of this research also shows that implementing on-grid PV system can accelerate electricity provision in West Kalimantan."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Firdy Kusuma Nurhandy
"Pembuatan sistem monitoring dan pengukuran tegangan RMS PLN secara realtime terhadap waktu telah berhasil dilakukan. Sistem tersebut menggunakan sistem rektifikasi sehingga tegangan RMS dari listrik PLN benar-benar aman dan efektif untuk dimonitoring dan diukur secara realtime. Inti sistem menggunakan data logger berbasis microcontroller AVR ATMEGA32 yang dilengkapi dengan RTC, internal ADC, dan menggunakan display pada PC untuk menampilkan data tegangan RMS PLN. Adapun data logger menggunakan salah satu software compiler untuk lebih mengoptimalkan hasil capture monitoring tegangan RMS melalui internal ADC pada microcontroller AVR ATMEGA32, sehingga nampak tren dari monitoring tersebut sesuai interval yang diinginkan. Hasil menunjukkan bahwa tegangan RMS PLN dapat secara efektif diatur interval pengambilan data dan pengkonversian ke bentuk tegangan RMS PLN secara realtime.
Monitoring system of PLN RMS voltage at Depok area have been made which is to monitor and measure PLN RMS voltage as realtime. This system is designed with microcontroller basis which is AVR ATMEGA32 for data logger (included RTC, and internal ADC) also rectification of PLN RMS voltage for safety and effective monitoring and measurements. We used PC Delphi program for output display of the system. With one of compiler program types we have choosed at data logger (AVR ATMEGA32) we could monitoring & capture the RMS voltage as optimally. So as realtime this system could display RMS voltage and made trend depend on interval setting we have made."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia;, 2008
S29357
UI - Skripsi Open  Universitas Indonesia Library
cover
cover
Nurul Huda
"Berdasarkan analisis data satelit cuaca dan lingkungan, terlihat daerah "Heat Island" di Jakarta yang semakin melebar ke daerah sekitarnya. Kondisi ini merupakan konsekuensi logis dari meningkatnya sektor industri. Disamping adanya perubahan O2 dan O3, sejumlah ahli telah mendeteksi peningkatan konsentrasi CO2 di atmosfer . Hal ini perlu diwaspadai, termasuk juga zat yang membahayakan lingkungan, zat polutan, seperti NH3, timah (Pb), SOx, NOx dan H2S.
Transmisi radiasi matahari yang menjalar ke bumi akan mengalami hambatan yang disebabkan oleh adanya media penyerap seperti zat polutan dengan karakteristik dan panjang gelombang yang dimilikinya. Dengan memantau panjang gelombang ini dapat diperoleh informasi spektrum radiasi matahari yang dapat direkam menggunakan Fotometer Matahari.
Dengan memanfaatkan sarana dan peralatan yang ada di Laboratorium Optik Program Studi Opto-elektroteknika Universitas Indonesia serta menambahkan komponen pendukungnya, dapat dibentuk sebuah Fotometer Matahari.
Konstruksi Fotometer Matahari dibangun dengan peralatan teleskop, serat optik, monokromator, ihotomultiplier, dan komputer berikut program pemantauannya.
Dengan pertimbangan keterbatasan seluruh komponen pembentuknya, Fotometer Matahari mampu merekam pola spektrum panjang gelombang dari 400 sampai 1200 nm dengan sensitivitas tinggi pada daerah 700 sampai 900 nm dan waktu observasi 16 menit 56 detik.
Analisis data hasil pemantauan pada bulan Oktober 2000 yang diwakili dengan 8 had menunjukkan adanya pola spektrum radiasi matahari yang hampir sama. Puncakpuncak dominan terjadi pada panjang gelombang 712, 753, 785, 810 dan 887 nm dan lembah dominan terjadi pada 764 nm. Dan puncak-puncak spektrum ketiga daerah ini dapat diprediksi adanya polutan O2, O3 dan H2O.
Pemantauan secara berkala sebagai fungsi panjang gelombang bisa membantu untuk memperoleh data meteorologi yang berguna, tenrtarna informasi spesifik pada daerah panjang gelombang tertentu."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T2662
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>