Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 94100 dokumen yang sesuai dengan query
cover
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1985
S17524
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nita Yosita Hawadi
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1983
S17011
UI - Skripsi Membership  Universitas Indonesia Library
cover
Tuti Kurniati
"Rumah Sakit Islam Jakarta Pusat membuat program JPKM bagi pelayanan kesehatan karyawannya. Salah satu tujuan pengelolaan kesehatan karyawan RSIJ melalui program JPKM adalah mengendalikan biaya pelayanan kesehatan karyawan, namun terjadi peningkatan biaya kesehatan karyawan RSI Jakarta Pusat pada tahun 2001 sebesar 77,88%, sedangkan peningkatan jumlah peserta RSI Jakarta Pusat 1,69%, inflasi harga obat 12,19%, inflasi jasa pelayanan kesehatan 12,88% dan inflasi secara umum 12,55 %.
Beberapa pertanyaan penelitian muncul yaitu a) bagaimana pengendalian biaya dilaksanakan oleh bapeI JPKM PT Ruslam pada pelayanan kesehatan pegawai RSI Jakarta Pusat pada tahun 2001? dan b) komponen apa saja yang menyebabkan peningkatan biaya pelayanan kesehatan pegawai RSI Jakarta Pusat pada tahun 2001 ?
Penelitian ini menggunakan rancangan penelitian operasional dengan analisa kualitatif eksploratif untuk menganalisa aspek pengendalian biaya bapeI JPKM PT Ruslam. Tempat penelitian di bapel PT Ruslam dan RS. Islam Jakarta Pusat pada bulan Desember 2002 dan Januari 2003. Data primer diperoleh dari wawancara informan yaitu : pejabat, staf dan pelaksana yang terlibat dalam pengendalian biaya pelayanan kesehatan karyawan RS.Islam Jakarta Pusat sedangkan data sekunder diperoleh dari laporan dan dokumen yang berkaitan dengan proses pengendalian biaya pelayanan kesehatan.
Dari hasil penelitian penulis menemukan bahwa cara pembayaran kepada PPK untuk rawat jalan memakai cara fee for service dan untuk rawat inap paket, adanya peningkatan biaya obat rawat jalan sebesar 86,95 % dari keseluruhan peningkatan biaya, bapel belum mempunyai kegiatan promotif, melakukan cost sharing untuk pelayanan di luar standar dan belum melaksanakan utilisasi review untuk jaminan rawat inap.
Hal tersebut menunjukkan pengendalian biaya yang dilaksanakan bapel JPKM PT Ruslam kurang baik, sehingga dapat diambil kesimpulan peningkatan biaya kesehatan karyawan RSIJ tahun 2001 berhubungan dengan kurang baiknya pengendalian biaya bapel JPKM PT Ruslam.
Penulis memberikan saran penyamaan persepsi pentingnya pengendalian biaya kesehatan karyawan RSIJ antara bapel, RSIJ, dokter dan karyawan RSIJ, komilmen bapel, PPK peserta dan dokter untuk mengendalikan biaya pelayanan kesehatan, melakukan pembayaran PPK secara praupaya, sanksi berupa tidak diberikannya jaminan bagi peserta dan PPK yang tidak mentaati standard pelayanan, insentif bagi dokter karyawan,dokter spesialis dan peserta, melakukan program promotif, melakukan cost sharing untuk rawat jaian dan obat, bapel JPKM PT Ruslam memiliki sistem informasi manajemen.,melaksanakan kajian utilisasi dan membuat laporan pelaksanaan pengelolaan kesehatan karyawan RSIJ Pusat kepada Yayasan RSIJ,
Daftar bacaan : 29 (1966-2002)

Relationship between Cost Control of Implementing Body (Bapel) of JPKM PT RusIam with Increase of Health Cost among Workers in Islamic Hospital, Central Jakarta, 2001Islamic Hospital in Central Jakarta had developed a JPKM program for its worker's health care. One of the objectives is to control worker's health care cost. However, there was an increase in health cost of health cost among workers of the hospital in the year 2001 as many as 77.88%, while the increase of participant is of 1.69%, drugs price inflation of 12.19, health care service inflation of 12.88% and general inflation of 12.55%.
Several research questions aroused including a) how was the implementation of cost control conducted by Bapel JPKM of PT Ruslam to Islamic Hospital workers' health care in the year 2001?; and b) what component caused the increase of health service cost among Islamic Hospital workers in 2001?
The study is operational research with explorative qualitative analysis to analyze cost control of Bapel JPKM of PT Ruslam. The study was conducted in PT Ruslam and Islamic Hospital in December 2002 to January 2003. Primary data was obtained through interview with informants including high management, staff, and implementer involved in the health care cost control of Islamic Hospital while secondary data gathered through report and document related to the health care cost control.
The study found that fee for service payment method was employed for outside hospital care and for package of inside hospital care; there was an increase of drug's cost for outside hospital care of 86.95% out of total increase of cost; the Bapel had no promotion activity; implementing cost sharing for care outside the standard and not yet conducting utilization review for inside hospital insurance.
The above-mentioned findings exhibited a rather poor cost control conducted by Bapcl JPKM of PT Ruslam. Thus, it could be concluded that the increase of health cost of Islamic Hospital workers was related to poor cost control conducted by BapeI JPKM of PT Ruslam.
It is, then, suggested to adjusting to similar perception on the importance of health cost control of Islamic Hospital workers among Bapel, Islamic Hospital Management and workers as well as commitment from all to control the health care cost, implementing, the payment before hand, implementing sanctions for out of standard practices by not providing the insurance, providing incentives for physicians, specialists, and member, conducting promotion activities, implementing cost sharing for outside hospital care and drugs, establishing management information system in Bapel JPKM of PT Ruslam, conducting utilization review, and reporting the implementation of health care management of Islamic Hospital workers to Yayasan RSIJ as owner.
References: 29 (1966-2002)"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2003
T10709
UI - Tesis Membership  Universitas Indonesia Library
cover
Laode Moh. Saidin
"Pada proyek konstruksi gedung bertingkat banyak faktor yang mempengaruhi biaya Penyimpangan biaya dalam tahap pelaksanaan selalu terjadi,termasuk penyimpangan pada biaya overhead lapangan. Penyimpangan biaya yang terjadi pada akliirnya akan menyebabkan cost overrun.
Untuk menghindari terjadinya cost overrun, maka penyimpangan yang terjadi harus diperbaiki secara dini. Salah satu Cara memperbaiki penyimpangan adalah dengan melakukan tindakan koreksi yang tepat dan efektif.
Hasil analisis dan simulasi yang dilakukan menunjukan bahwa terdapat 25 variabel tindakan koreksi tunggal dan 18 variabel tindakan koreksi berganda yang mempengaruhi peningkatan kinerja biaya proyek gedung bertingkat tinggi.
Dan variabel tindakan koreksi yang paling berpengaruh terhadap peningkatan kinerja biaya dalam proses pengendalian biaya overhead adalah " penyusunan metode kerja pelaksanaan dan hubungan antar aktivitas untuk digunakan dalam pembuatan network planning".

On highrise building construction project, many factor cause cost overrun. Cost overrun include material cost,labour,equipment,overhead and subcontract. Finally, this deviation cause cost overrun.
To avoid cost overrun, the deviation should correct early. One way to correct it is by doing the effective and exact corrective action.
The result of analisys and simulation has been done show that if the effective corrective action is done so the cost performance will increase. In this research there are 25 variable of single corrective action and 18 double correctly action that influence the progress of overhead cost.
And the most influence corrective action to the progress of cost performance in overhead cost control is "Work method arrangement and relationship between activity that is used in the making of network planning"."
Depok: Fakultas Teknik Universitas Indonesia, 2003
T 8711
UI - Tesis Membership  Universitas Indonesia Library
cover
Sawitri Handayani
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1984
S17112
UI - Skripsi Membership  Universitas Indonesia Library
cover
Wishnu Jati Wikantyasa
"ABSTRAK
Dampak-dampak negatif yang terjadi pada pelaksanaan proyek konstruksi bisa menyebabkan tidak tercapainya : mutu, walau dan biaya sesuai dengan perencanaan. Oleh karena itu perlu dilakukan identifikasi penyebab terjadinya dampak negatif tersebut selanjutnya diambil tindakan koreksi. Peralatan merupakan unsur pendukung utama dalam pelaksanaan suatu proyek sehingga perlu dikendalikan supanya tidak terjadi cost overrun. Indikator penyebab terjadinya cost overrun pada manajemen peralatan dibagi menjadi 5 kategori, yaitu : biaya kepemilikan, biaya operasional, biaya pemeliharaan, biaya perbaikan dan biaya pengelolaan (overhead). Berdasarkan hasil survey, indikator biaya operasional mempunyai sumber resiko cost overrun paling banyak Dalam penelitian ini analisa yang dilakukan adalah analisa tingkat resiko yang dilanjutkan dengan analisa statistik dengan bantuan program SPSS 11.0, untuk mencari dampak signifikan kemudian dilakukan simulasi dengan program Crystall Ball, untuk mencari probabilitas terjadinya cost overrun dad dampak signifikan tersebut. Hasil penelitian ini menunjukkan bahwa pada indikator biaya kepemilikan, indikator biaya operasional dan indikator biaya pengelolaan mempunyai dampak signifikan yang sama, yaitu : meningkatnya biaya perbaikan karena kapasitas alas tidak sesuai, profit menurun karena tingginya biaya sewa, profit menurun karena lemahnya sistem administrasi dan penjamin kontrak dan penundaan pelaksanaan kegiatan konstruksi karena tingginya frekuensi perbaikan perbaikan alat. Untuk indikator biaya pemeliharaan, dampak yang signifikan adalah : arus kas mengalami perubahan karena kesalahan dalam merencanakan perkiraan anggaran biaya yang terlalu rendah untuk peralatan, rneningkatnya biaya perbaikan karena kapasitas alat tidak sesuai, dan penundaan pelaksanaan kegiatan konstruksi karena tingginya frekuensi perbaikan perbaikan alat. Sedangkan untuk indikator biaya perbaikan dampak yang signifikan adalah : arus kas mengalami perubahan karena kesalahan dalam merencanakan perkiraan anggaran biaya yang telalu rendah untuk peralatan, meningkatnya tingkat kerusakan alat karena kapasitas alat tidak sesuai, meningkatnya biaya perbaikan karena kapasitas alat tidak sesuai, dan profit menurun karena lemahnya sistem administrasi dan penjamin kontrak.

ABSTRACT
The negative effects of construction a project can make failure to achieve: quantity, time and cost, that have been planned It's necessary to identify& the reason of negative effect for determine the corrective action. Equipment is main support of construction project so they need to be controlled the indicator cost overrun of the equipment management consist of the own cost, operational cost, maintenance cost, repair cost and overhead cost. According survey result, Indicator of operation cost has the most cost overrun risk resource. This thesis use risk level analysis, statistic analysis with SPSS software, then simulation with Crystal Ball Software to find probability of cost overrun. The result indicates that the indicator of own cost, operation cost and overhead have same significant effect. That are the increasing of repair cost because equipment capacity isn't compatible, decrease of profit because highly rent cost, decrease of profit because the weakly of administration system and contract guarantor, and delay of construction project because the highly frequency repair of equipment. For the indicator of maintenance cost, the significant effects are the change of cash flow because the lower budget, increase of repair cost because equipment capacity isn't compatible, and delay of construction project because the highly frequency repair of equipment. Then the significant effect for indicator of repair cost are the change of cash flow because the lower budget, increase of equipment breakage level because equipment capacity isn't compatible, increase of equipment repair cost because equipment capacity isn't compatible, and decrease of profit because the weakly of administration system and contract guarantor."
Depok: Fakultas Teknik Universitas Indonesia, 2003
T10216
UI - Tesis Membership  Universitas Indonesia Library
cover
Tjetjep Muljana
"ABSTRAK
Industri minyak dan gas bumi yang merupakan tulang punggung pembangunan
Indonesia, dikelola oleh Pertamina bersama dengan Kontraktor Asing dalam bentuk
Kontrak Production Sharing, sesuai dengan Undang-Undang Dasar 1945, ?Undang
Undang No.44/PRP/1960 dan No.8/1971. Dalam kontrak tersebut Kontraktor Asing
membiayai semua operasi perminyakan yang akan diganti dan hasil minyak/gas yang
dihasilkan, sedang sisanya akan dibagi antara Pertamina dan Kontraktor Asing dengan
rasio yang ditentukan dalam kontrak.
Dalam melaksanakan bisnisnya, Kontraktor Asing dan Pertamina melaksanakan
pengendalian biaya melalui prosedur program kerja dan anggaran, pelaporan
keuangan dan statistik, serta pengadaan barang dan jasa. Sistem pengendalian biaya
yang digariskan oleh Pertamina bertujuan mengendalikan biaya seefisien mungkin
bagi kepentingan Pertamina sesual dengan misi yang ditetapkan dalam Undang
Undang No.8/1971. Sedangkan ?X? Petroleum Company (sebagai salah satu
kontraktor yang menjadi tempat penelitian) melaksanakan sistem pengendalian
biayanya sesuai ketentuan dan kantor pusatnya, yang kemudian dijabarkan dan
disesuaikan dengan sistem yang ditentukan Pertamina.
Dengan adanya perbedaan misi antara Pertamina dan Kontraktornya, maka
pelaksanaan sistem pengendalian biaya tidak dapat berjalan secara optimal dan tujuan
agar biaya dapat dikeluarkan secara efisien tidak sepenuhnya dapat dicapai.
Dari hasil penelitian yang dilaksanakan pada ?X? Petroleum Company, ada
beberapa hal dalam sistem pengendalian biaya yang dapat diperbaiki agar sistem ini
bekerja secara optimal baik bagi kepentingan Pertamina maupun Kontraktornya.
Kesimpulan dan saran bagi perbaikan sistem pengendalian pada Kontrak Production
Sharing adalah sebagai berikut:
1. Secara umum sistem pengendalian biaya pada Kontrak Production Sharing tidak
disesuaikan dengan perkembangan lingkungan yang kadang bergejolak
(misalnya perkembangan harga minyak). Untuk itu sebaiknya dibuat sistem yang
dapat beradaptasi dengan perubahan lingkungan dan tidak kaku.
2. Perlakuan akuntansi yang digabung dengan negosiasi bisnis dapat
mengakibatkan rancunya sistem pengendalian biaya, sebaiknya perlakuan
akuntansi tetap mengacu kepada Standard Akuntansi Keuangan sedangkan
insentif bisnis dapat diberikan dalam bentuk lain. Dengan demikian pengendalian
biaya tidak dipengaruhi oleh kepentingan pihak-pihak tertentu.
3. Saat ini Pertamina hanya menerima laporan keuangan dan Kontraktor, sehingga
Pertamina tidak mengetahui sistem alokasi biaya yang dilaksanakan
Kontraktornya dan mengakibatkan salah interpretasi. Hal ini dapat diatasi bila
Pertamina menerapkan Accounting Procedure yang terdapat dalam kontrak, yaitu
menentukan daftar perkiraan (Chart of Accounts) serta sistem alokasi biayanya
bagi seluruh Kontraktor di Indonesia.
4. Perbedaan kepentingan antara Pertamina dan Kontraktornya dalam hal-hal
tertentu dapat menghambat lancarnya operasi. Hal ini hanya dapat ditanggulangi
dengan keterbukaan antara Pertamina dan Kontraktor dalam merumuskan tujuan
perusahaan balk jangka panjang, menengah maupun pendek dalam bentuk
program kerja dan anggaran.
5. Pengukuran kinerja dengan cara benchmarking melalui laporan operasional
statistik kurang dapat dipergunakan karena kniteria maupun kiasiflkasi biayanya
belum seragam. Untuk ¡tu sebaiknya semua Kontraktor Production Sharing
dipertemukan dan bersama-sama membuat bench marking, agar dapat dihasilkan
suatu tolok ukur yang benar dan perbaikan yang menuju kearah efisiensi biaya
dapat dllaksanakan dengan Iebih akurat.
6. Persetujuan pengeluaran biaya melalui anggaran, AFE (Authorization For
Expenditure) dan penetapan lelang yang sering memerlukan waktu yang lama
membuat anggaran sebagai salah satu sistem pengendalian biaya tidak dapat
melaksanakan fungsinya dan . perencanaan sering tertunda dan mengakibatkan
membesarnya pengeluaran biaya. Hal ini hams segera ditunggulangi dengan
mengurangi waktu dan jenjang tingkat persetujuan.
7. Keppres No.16 tahun 1994 beserta semua petunjuk teknis pelaksanaan yang
bertujuan untuk mengetatkan pengeluaran biaya, ternyata dapat juga
mengakibatkan bertambah besarnya biaya yang disebabkan oleh adanya syarat
kandungan lokal yang memberikan toleransi harga yang lebih mahal dan
prosedur penunjukan pemenang lelang yang berjenjang dan makan waktu. Hal ¡ni
hams segera ditanggulangi dengan tidak sepenuhnya menerapkan Keppres no.16
tahun 1994 terhadap Kontraktor Production Sharing, atau segera menetapkan
peraturan yang bersifat debirokratisasi dan deregulasi untuk menyederhanakan
rantai persetujuan pengadaan barang dan jasa, agar biaya clapat ditekan serendah
mungkin."
1995
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nasser Taher
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1983
S17000
UI - Skripsi Membership  Universitas Indonesia Library
cover
Yudiansyah
"Kualitas pelaksanaan proyek salah satunya ditentukan oleh pengawasan dan pengendalian saat konstruksi berlangsung untuk mencapai tujuan mutu, waktu dan biaya yang sesuai dengan anggaran biaya proyek Variabel biaya proyek yang dapat dikendalikan adalah biaya tenaga kerja, biaya material, biaya peralatan, biaya subkontraklor, biaya kondisi umum dan overhead. Pada proyek konstruksi, biaya peralatan menyumbangkan biaya proyek yang nilainya mencapai 20 - 30 % dari total biaya proyek Dengan kontribusi terhadap total biaya proyek yang cukup besar tersebut, kesalahan pada manajemen peralatan dapat mengakibatkan timbulnya penyimpangan biaya proyek Untuk memperbaiki penyimpangan biaya, dilakukan identifikasi masalah-masalah terhadap manajemen peralatan dan mengambil keputusan yang tepat dalam melakukan Tindakan koreksi. Tindakan koreksi dapat dilaksanakan apabila penyimpangan yang timbul dalam pelaksanaan proyek dapat di identifikasi secara cepat, sehingga alternatif keputusan tindakan koreksi yang terbaik dapat diambil secara cepat dan tepat. Untuk mempermudah pengambilan keputusan dalam tindakan koreksi dapat dilakukan dengan banluan program komputer yang berbasis expert system. Pemilihan expert system sebagai pendekatan dalam melakukan tindakan koreksi pada manajemen peralatan dimaksudkan agar pengetahuan yang dimiliki oleh seorang ataupun beberapa ahli dapat dikumpulkan dan direkam dalam suatu alas berupa program komputer sehingga pakar dapat berbagi pengetahuan yang dimilikinya baik ilmu maupun pengalamannya kepada pengguna yang membutuhkan pengetahuan tersebut. Penerapan expert system pada bidang konstruksi merupakan salah salu terobosan dalam era teknologi informasi saat ini karena begitu banyak informasi yang tersedia namun belum dapat diolah secara optimal.

The quality of constructing a project is determined by monitoring and controlling the construction phase to achieve the intended quality, time and cost The cost's variables /hat should be controlled are labor costs, material costs, equipment costs, subcontract costs, general condition costs, and overhead. In a construction project, 20 -30% of the total project costs came from the equipment costs. With this contribution to the total project costs, a mistake or misleading from managing equipment can cause cost variances. To fix these cost variances, ident f cation towards problems from equipment management should be done and a corrective action should be taken. A corrective action can be implemented if the variance is already identified To help and support in determining a corrective action, an expert system based in a computer program can be used. Expert system can collect knowledge from experts where this knowledge are used for recommendation in decision making. Applying expert system in construction industry is one of the breakthrough in information technology era these days."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T 10408
UI - Tesis Membership  Universitas Indonesia Library
cover
Vicky Rahman Ardiansyah
"Adanya pasar bebas ditandai dengan blok perdagangan menuntut persaingan perdagangan secara bebas dimana hanya produk bermutu saja yang dapat bersaing. Salah satu cara untuk dapat bersaing dalam pasar bebas adalah dengan adanya pengakuan secara internasional terhadap barang bermutu dari suatu negara. Pengalcuan tersebut disepakati dengan adanya tanda bukti jaminan mutu berupa suatu sertifikat.
Peran sistim manajemen mutu bagi setiap perusahaan menjadi semakin penting, seiring dengan meningkatnya tuntutan masyarakat akan produk-produk berkualitas, oleh karenanya, kehadiran ISO 9000 dapat membantu manajemen perusahaan dalam menguatkan mutu kinerjanya untuk dapat meningkatkan efisiensi dan produktivitas sehingga dapat memperbaiki kinerja dan budaya perusahaan yang lebih sehat. Dan pada akhirnya, dapat memberikan jaminan mutu produk yang konsisten sesuai dengan harapan pelanggan dan memperkuat daya saing.
Penelitian ini menganalisis seberapa jauh penerapan sistim manajemen mutu ISO 9000 dapat meningkatkan kinerja biaya penyelesaian proyek apabila dibandingkan dengan perusahaan-perusahaan lain yang belum mengadopsi sistim manajemen mutu ISO 9000, khususnya dalam mengurangi rework yang terjadi pada pekerjaan struktur. Data proyek untuk analisis diambil melalui penyebaran kuesioner kepada perusahaan-perusahaan di wilayah Jabotabek, dengan lokasi proyek di Indonesia, yang bertindak sebagai kontraktor pelaksana.
Variabel-variabel dalam kuesioner penelitian nonvalue adding activities/waste tersebut diberi bobot nilai. Kemudian diperoleh populasi data yang diproses dengan melakukan analisis korelasi dan regresi berganda. Berdasarkan basil analisis data, didapatkan model regresi linier dengan 2 (dua) variabel penentu. Pertama informasi mengenai frekuensi rework yang digunakan sebagai umpan balik (feedback) untuk pengambilan tindakan pengendalian pada pekerjaan struktur. Kedua, keterbatasan atau kekurangan tenaga pengawas dalam memonitor proses pelaksanaan konstruksi.
Kemudian persamaan resgresi linier tersebut dijadikan panduan untuk membandingkan kinerja biaya penyelesaian proyek perusahaan-perusahaan kontraktor baik yang telah mengadopsi ISO 9000 maupun yang belum mengadopsi ISO 9000, dalam mengurangi rework yang terjadi pada pekerjaan struktur."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T521
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>