Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 73377 dokumen yang sesuai dengan query
cover
Nia Octaviana
"As a developing country, Indonesia is trying hard to progress towards becoming a developed nation. In the past few years, Indonesia has achieved impressive growth. In order to maintain it, Indonesia is spending a large amount of money for its physical development, for instance, the development of infrastructure projects. Consequently, project control is then needed to carry out the projects successfully. Therefore, project control plays an important role in the development of our country. Control is basically a process of trying to achieve conformity between goals and actions. It involves comparison of the performance to the plan. If significant differences take place, corrective actions should be taken. Project control is focused on three areas: time, cost, quality. Time control can be carried out by scheduling the project. Two methods used for scheduling are bar charting and networking technique. In bar charting, a project is divided into its major operations and the time to complete each operation is estimated. The operations are represented by bars arranged in the order of their early start time. Networking techniques are used on complex projects. An example of such a technique is Critical Path Method (CPM)."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1995
S18937
UI - Skripsi Membership  Universitas Indonesia Library
cover
Waldy Rahman Ziliwu
"Pelaksanaan pekerjaan dalam industri konstruksi dipengaruhi oleh berbagai faktor, diantaranya yaitu biaya, waktu dan kualitas. Keefektifan dan efisiensi dalam pelaksanaan merupakan masalah yang sering dihadapi kontraktor dalam melaksanakan suatu proyek konstruksi. Seberapa baikpun perencanaan yang telah dilakukan, pada tahap pelaksanaan selalu terjadi perubahan yang mengakibatkan keterlambatan dalam penyelesaian. Untuk menghindari atau mengurangi kemungkinan kesalahan dan rework dalam proses konstruksi maka keterlibatan kontraktor pada semua tahapan konstruksi sangat diperlukan. Keterlibatan personel konstruksi pada tahap perencanaan dan perancangan dapat memberi masukan dan pengalaman untuk dapat diimplimentasikan pada tahap pelaksanaan konstruksi. Dengan keterlibatan personel konstruksi pada semua tahapan konstruksi, kontraktor diharapkan dapat mengendalikan pelaksanaan proyek yang berhubungan dengan biaya, waktu dan kualitas tersebut.
Penelitian ini bertujuan untuk mengidentifikasi untuk mengidentifikasi faktor-faktor yang berkaitan dengan peran kontraktor dalam meningkatkan constructability terutama pada tahap pelaksanaan konstruksi serta pengaruhnya terhadap kinerja proyek.
Dalam penelitian ini, metode yang digunakan adalah metode studi kasus, dimana dilakukan peninjauan langsung terhadap suatu proyek dengan mengumpulkan data dan informasi yang mempengaruhi peningkatan constructability pada proyek konstruksi tersebut. Konsep constructability merupakan konsep yang memungkinkan keterlibatan personel konstruksi dalam semua tahapan konstruksi. Penerapan konsep ini memungkinkan peningkatan produktivitas dan kinerja proyek secara keseluruhan.

Construction process influenced by various factor, among others that are cost, quality and time. Effectiveness and efficiency in construction process are problems often faced by contractor. No matter how good the planning was, changes that resulted in delay in finishing always occur in the process phase. To avoid or lessen the possibilities of mistake and rework in the course of construction process, hence involvement of contractor are needed in every construction step. Involvement of construction personnel at planning and design phase can give experience and input to be further implemented in the process phase of the construction. With the involvement of construction personnel at all construction steps, contractor is expected to control the project execution which is related to cost, quality and time.
This research aims to identify the factors related to the role of contractor in improving constructability especially in process phase of construction and also its influence to project performance.
In this research, the method used is the case study method, where a project is directly evaluated by collecting information and data which influence the improvement of constructability in the construction project. The constructability concept is a concept that enables the involvement of construction personnel in every construction step. Application of this concept can increase the performance and productivity of a project as a whole.
"
Depok: Fakultas Teknik Universitas Indonesia, 2006
S35264
UI - Skripsi Membership  Universitas Indonesia Library
cover
Levy, Sidney M.
New York: McGraw-Hill , 2002
624.068 LEV p
Buku Teks  Universitas Indonesia Library
cover
Levy, Sydney M.
New York: McGraw-Hill , [Date of publication not identified]
624.068 4 LEV p
Buku Teks  Universitas Indonesia Library
cover
Levy, Sidney M.
New York: McGraw-Hill, 2012
624.068 LEV p
Buku Teks  Universitas Indonesia Library
cover
Clough, Richard Hudson
New York: John Wiley & Sons, c1991
658.924 CLO c
Buku Teks SO  Universitas Indonesia Library
cover
Clough, Richard Hudson
New York: John Wiley & Sons, 2000
648.924 CLO c (1)
Buku Teks  Universitas Indonesia Library
cover
Hendrickson, Chris
Englewood Cliffs, N.J.: Prentice-Hall, 1989
624.068 HEN p
Buku Teks  Universitas Indonesia Library
cover
Anderson, S.D.
New York: A Wiley-Interscience, 1981
658.404 AND p
Buku Teks  Universitas Indonesia Library
cover
Anderson, S.D.
New York: A Wiley-Interscience, 1981
658.404 AND p
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>