Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 2599 dokumen yang sesuai dengan query
cover
Riley, Terence
New York: The Museum of Modern Art, 1995
720.1 RIL i
Buku Teks SO  Universitas Indonesia Library
cover
Muller, Edward J.
Englewood Cliffs, New Jersey: Prentice-Hall, 1976
720.28 MUL a
Buku Teks SO  Universitas Indonesia Library
cover
Muller, Edward J.
New Jersey: Pearson - Prentice Hall, 2004
720.284 MUL r
Buku Teks SO  Universitas Indonesia Library
cover
Benyamin Kusumoputro
"A computerized intensity detection system has been designed
and constructed using single board TK-85 microprocessor system.
Two types of hardware architectures, Address Mapped and Memory
Mapped Input-Output systems are utilized as Input module from
light detector and Output module to X-Y recorder, respectively.
A performance test on the computer system has shown that the
system hardware and software function properly with consistent
gain -of l.36O. An educational grating- used for the overall
performance test has also indicated instrumental accuracy
consistent with design limitation. A preliminary application of
this system in light scattering experiment has exhebited
qualitative features in the angular distribution of the
scattered light intensity which are consistent with theoritical
prediction."
Jakarta: Fakultas Teknik Universitas Indonesia, 1983
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Brown, RObert Wade
New York: McGraw-Hill, 1997
624.15 BRO f
Buku Teks  Universitas Indonesia Library
cover
Brown, RObert Wade
New York: McGraw-Hill, 1992
624.15 BRO f
Buku Teks  Universitas Indonesia Library
cover
Sobel, Michael I.
Chicago : University of Chicago, 1987
535 SOB l
Buku Teks SO  Universitas Indonesia Library
cover
Naila Allika Zatialiyah Mayuza
"Sektor konstruksi merupakan salah satu sektor yang berkontribusi besar menyumbang kejadian kecelakaan kerja di Indonesia. Sebagian besar kecelakaan kerja disebabkan oleh persepsi pekerja yang belum menganggap keselamatan menjadi prioritas utama. Dalam mencegah kejadian kecelakaan diperlukan budaya keselamatan yang baik di tempat kerja. Oleh karena itu, pendekatan yang dapat dilakukan salah satunya dengan memahami persepsi pekerja akan keselamatan yang dikenal dengan iklim keselamatan. Skripsi ini bertujuan untuk memberikan gambaran iklim keselamatan melalui survei persepsi pekerja terhadap komitmen manajemen, komunikasi K3, aturan dan prosedur K3, pelatihan K3, akuntabilitas pribadi, dan lingkungan yang mendukung. Desain penelitian deskriptif dan metode proportionate stratified random sampling digunakan dalam studi ini. Penelitian ini dilakukan pada 76 pekerja yang bersedia untuk memberikan tanggapan melalui kuesioner. Hasil penelitian ini menunjukkan bahwa iklim keselamatan pada proyek konstruksi dalam kondisi baik. Persepsi pekerja pada dimensi komitmen manajemen mendapatkan penilaian terbaik dari keenam dimensi iklim keselamatan. Hal tersebut menunjukkan bahwa pekerja menaruh kepercayaan akan penerapan keselamatan dan kesehatan kerja yang telah dilakukan oleh perusahaan di tempat kerja. Apabila ditinjau berdasarkan karakteristik demografi diketahui bahwa nilai iklim keselamatan selaras dengan tingkat jabatan, pengalaman kerja, dan status pekerja. Untuk dapat meningkatkan iklim keselamatan, perusahaan perlu memperhatikan dimensi akuntabilitas pribadi untuk dapat menghilangkan perasaan khawatir pekerja akan risiko kecelakaan di tempat kerja

Construction sector is one of the significant contributors to the occurrence of occupational injuries in Indonesia. Most of the occupational injuries are the results from the workers' perception that safety isn't a top priority. To prevent accidents, a good safety culture is necessary at the workplace. As a result, an approach that can be taken is to understand workers' perceptions of safety, the so-called safety climate. This study aims to provide an overview of the safety climate through a survey of workers' perceptions of management commitment, communication, rules and procedures, training, personal accountability, and supportive environment. In this study, a descriptive research design was used as well as a proportionate stratified random sampling method. This study was conducted on 76 workers who were willing to provide responses through a questionnaire. The results of this study show that the safety climate in the construction project is in a good state. Workers' perceptions of the managerial commitment receive the best assessment of the six dimensions of the safety climate. This shows that workers have confidence in the application of safety performed by the company at the workplace. When they are examined on the basis of demographic characteristics, it's known that the value of the safety climate corresponds to the level of the job, the work experience, and the status of the workers. In order to improve the safety climate, companies should pay attention to personal accountability so that they can remove the workers' feelings of concern about the risk of occupational injuries at the workplace"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Retno Ajeng Paramitha Dhevy
"Proyek Light Rail Transit LRT merupakan solusi yang diusung oleh pemerintah dalam mengatasi permasalahan transportasi yang sangat kompleks, seperti kemacetan. Tujuan penelitian ini adalah mengidentifikasi faktor risiko dominan yang berpengaruh terhadap kinerja waktu proyek. Penelitian ini dilakukan menggunakan tools kuisioner dan dianalisis dengan qualitative risk analysis berbasis PMBOK Guide 5th Edition. Ditemukan tujuh risiko dominan yang selanjutnya ditentukan tindakan preventif dan tindakan korektif untuk mengelola risiko yang ada. Setelah dievaluasi, tindakan preventif yang paling tepat adalah dengan mitigasi risiko, sedangkan tindakan korektif yang paling tepat adalah dengan melakukan pembaharuan jadwal pelaksanaan.

The Light Rail Transit LRT Project is a solution proposed by the government to overcome the complex transportation problems, such as congestion. The purpose of this study is to identify the dominant risk factors affecting project time performance during the construction. This research was conducted using questionnaire and analyzed by qualitative risk analysis based on PMBOK Guide 5th Edition. There are seven predominant risks, which are then determined for the preventive and corrective action to manage. Once evaluated, the most appropriate preventive action is risk mitigation, meanwhile the most appropriate corrective action is to update the project construction schedule."
Depok: Fakultas Teknik Universitas Indonesia, 2017
S69052
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dewi Ashari Ciptaningrum
"Kecelakaan konstruksi terjadi karena pekerjaan konstruksi mengandung risiko dan bahaya yang tinggi. Terutama dalam pekerjaan ereksi baja di proyek-proyek pembangunan Stasiun Light Rail Transit (LRT), di mana para pekerja dihadapkan pada kondisi seperti bekerja pada ketinggian, melibatkan alat berat dan peralatan tajam, kondisi cuaca panas, dan durasi kerja yang panjang. Untuk menghindari kecelakaan pada pembangunan stasiun LRT, penilaian risiko diperlukan pada proses kerja ereksi.
Penelitian ini bertujuan untuk menentukan tingkat risiko keselamatan kerja dalam proses kerja ereksi baja di proyek pembangunan stasiun LRT oleh PT X dengan mengacu pada metode analisis risiko semi-kuantitatif AS/NZS ISO 31000: 2009 tentang Manajemen Risiko. Desain penelitian dilakukan dengan studi observasional dan pendekatan analisis deskriptif.
Dari hasil penelitian, dapat dilihat bahwa risiko tertinggi pekerjaan ereksi baja adalah jatuh, bertabrakan dengan bahan baja, komponen terjepit peralatan ereksi, dan kelelahan karena durasi kerja yang panjang. Kontrol yang disarankan termasuk menyediakan manlift untuk pekerja, menambah persediaan APD, menyediakan sistem hadiah & hukuman untuk pekerja, dan mengoptimalkan pengawasan oleh penyelia, manajer HSE, konsultan pengawas, dan kementerian perhubungan.

Construction accidents occur because construction works carry high risks and hazards. Especially in steel erection work in Light Rail Transit Station (LRT) construction projects, where workers are faced with conditions such as; work at height, involving heavy equipment and sharp equipment, hot weather conditions, and long work duration. To avoid accidents at the LRT station construction, risk assessment is needed in the erection process.
This study aims to determine the level of work safety risks in the steel erection work process in the LRT station construction project by PT X with reference to the AS / NZS ISO 31000: 2009 semi-quantitative risk analysis method on Risk Management. The research design was carried out with observational studies and descriptive analysis approaches.
From the results of the study, it can be seen that the highest risk of steel erection work is falling, colliding with steel materials, components being squeezed by erection equipment, and fatigue due to long work duration. Suggested controls include providing manlift for workers, increasing PPE inventory, providing a reward & punishment system for workers, and optimizing supervision by supervisors, HSE managers, supervisory consultants, and the ministry of transportation.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>