Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 122984 dokumen yang sesuai dengan query
cover
Dwi Ani Setyorini
"Tujuan dari penelitian ini adalah untuk mengetahui faktor dan variabel penyebab kecelakaan jatuh pada proyek konstruksi bangunan tinggi. Dari variabel tersebut selanjutnya akan didapatkan casuality / hubungan dari variabel dominan menyebabkan kecelakaan jatuh. Analisa untuk mendapatkan nilai casuality tersebut menggunakan metode Fuzzy Diagnostic Analysis.

The purpose of this study was to investigate the factors and variables cause of accidental falls in the high-rise building construction projects.Of these variables will then be obtained casualities of the dominant variables that lead to accidental falls Analysis to obtain the casualities using Fuzzy Diagnostic Analysis method."
Depok: Fakultas Teknik Universitas Indonesia, 2012
S43334
UI - Skripsi Open  Universitas Indonesia Library
cover
Setiyadi
"Dalam merealaesasikan proyek konstruksi ada beberapa kendala yang harus dilewati diantaranya adalah biaya, mutu waktu dan yang tidak kalah pentingnya ialah selamat dan sehat bagi semua yang terlibat didalamya dari saat mulai hingga selesai pelaksanaan proyek. Dewasa ini kecelakaan kerja pada industri konstruksi oleh sebagian masyarakat dinilai masih tinggi hal ini dikarenakan proyek konstruksi memiliki karakter sedemikian rupa sehingga memiliki potensi terjadinya resiko kecelakaan kerja. Kecelakaan kerja jatuh dari ketinggian merupakan jenis kecelakaan pada proyek konstruksi yang akibatnya dapat menimbulkan cacat permanen sampai kematian.
Dari penelitian yang telah dilakukan sebelumnya ada beberapa faktor dan variabel penyebab terjadinya kecelakaan tersebut antara lain : faktor manusia, peralatan, manajemen, organesasi dan lingkungan. Penelitian disini bermaksud mengetahui berapa besar tingkat resiko faktor dan variabel penyebab kecelakaan tersebut.Untuk itu maka dilakukan penelitian pada beberapa proyek konstruksi bangunan dengan responden para pelaku pelaksnaan proyek konstruksi yang sedangan dikerjakan.
Dari hasil penelitian disini diperoleh bahwa faktor dan variabel penyebab terjadinyan kecelakaan kerja jatuh dari ketinggian, dengan frekuensi "Sering" yang berarti kemungkinan dapat terjadi dan tingkat dampak "Dapat menimbulkan luka berat, sedera parah dan cacat tetap". Sedangkan tingkat resiko yang "Medium" yang berarti dapat beresiko membahayakan keselamatan umum, dan harta benda serta terganggunya kegiatan konstruksi.

In the realization of a construction project there are several obstacles that must be overcome, such as cost, quality, time, and not least is safe and healthy for everyone involved in it, from the start to finish the project. Today occupational accidents in the construction industry is still considered by most people this is due to high construction project has a character such that it has the potential risk of occupational accidents. Occupational accidents fell from a height is the type of accidents on construction projects that result can cause permanent disability to death.
Of research has been done before there are several variable factors and causes of accidents include: human factors, equipment, management, organization, and environment. The study intends to find out here how much the level of risk factors and variable causes of the accident. For those reasons, do some research on building construction projects with the perpetrators of respondent's implementation of construction projects in the works.
From the results obtained here that the variable factors and causes of occupational accidents fell from a height, with a frequency of "line" which means the possibility exists and the impact of "the impact caused serious injury, severe injury and permanent disability" while the level of risk is "medium" which means it can be at risk of endangering public safety, and property and disruption of construction activities.
"
Depok: Fakultas Teknik Universitas Indonesia, 2012
T40834
UI - Tesis Open  Universitas Indonesia Library
cover
Okta Rizka
"Dalam sebuah studi kelayakan investasi, risiko menjadi suatu hal yang sangat penting untuk diperhatikan. Risiko merupakan interpretasi dari suatu ketidakpastian keadaan dimasa mendatang. Faktor ketidakpastian tersebut dapat menjelma menjadi suatu bentuk kerugian tetapi juga bisa menjadi suatu opportunity untuk mendapatkan benefit. Untuk itu, perlu diketahui apa saja item risiko yang mungkin dapat terjadi pada sebuah proyek investasi, item mana saja yang perlu diprioritsakan dan bagaimana dampak yang dapat diakibatkan oleh tiap item risiko tersebut tehadap kelayakan proyek.
Penelitian ini bertujuan untuk mengidentifikasi setiap item risiko yang berpotensi dalam proyek USO (Universal Service Obligation) Ditjen Postel 2008. Kemudian item-item risiko yang terpilih akan dianalisa secara kuantitatif dengan mensimulasikannya secara simultan terhadap nilai keuntungan proyek.
Dari analisa hasil simulasi akan diketahui tingkat kelayakan dari proyek investasi tersebut. Untuk mengakomodir ketidakpastian dari item-item risiko tersebut, simulasi pengujian kelayakan investasi ini menggunakan metode Simulasi Monte Carlo. Selain itu, item-item risiko yang terpilih itu juga akan dianalisa secara kualitatif dengan memberikan rating pada tiap item risiko. Proses perhitungan penentuan nilai rating risiko dilakukan dengan menggunakan metode logika fuzzy untuk mendapatkan nilai rating risiko yang lebih akurat. Berdasarkan hasil analisa tersebut diharapkan dapat membantu para pengambil keputusan dalam merencanakan respon risiko yang dibutuhkan guna mengoptimalkan keuntungan yang bisa didapat.

In an investment feasibility study, risk becomes an important thing to be concerned. Risk is the interpretation of uncertainty in the fututre. The uncertainty factor can be transformmed to be a financial loss, but it also can be an opportunity to get some benefits. Therefore, it is important to recognize what kind of risks that could occur to this project, which risk item should be prioritised and how it affect the project's feasibility.
The objectives of this research are to indentify every potensial risks at USO (Universal Service Obligation) Ditjen Postel 2008 project, and then the chosen risk items will be analyzed quantitatively by simulating them simultaneously to the project's expected profit.
From the simulation result analysis will be known the feasibility level of the investment project. To accommodate the uncertainty of the risk items, this investment feasibility test simulation use the Monte Carlo Simulation method. Moreover, the chosen risk items also will be analyzed qualitatively by giving rating to each of them. That measurement rating proses is done by using fuzzy logic method to get more accurate rating value. Base on this result analysis, hopefully, it can give some assists to the decision makers in planning the risk respond needed to get the optimal benefit opportunity.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S50380
UI - Skripsi Open  Universitas Indonesia Library
cover
Rosmariani Arifuddin
"Disertasi ini membahas tingkat kerentanan proyek konstruksi terhadap kecelakaan jatuh. Tujuan penelitian adalah mengembangkan model mekanisme penyebab dan dinamika kerentanan proyek konstruksi terhadap kecelakaan jatuh serta menentukan program keselamatan kerja yang efektif untuk menurunkan kerentanan proyek.
Metodologi penelitian meliputi penyebaran kuesioner, observasi proyek, studi laporan kecelakaan kerja dan focus group discussion. Analisa fuzzy multy expert decision making dan sistem dinamis digunakan untuk mengembangkan mekanisme penyebab dan dinamika kerentanan.
Hasil menunjukkan bahwa mekanisme interaksi terdiri dari faktor manusia, peralatan, organisasi, manajemen, lingkungan, dan berubah selama pelaksanaan proyek. Sosialisasi program keselamatan kerja, inspeksi, dan pinalti sangat efektif menurunkan indeks kerentanan proyek konstruksi terhadap kecelakaan jatuh.

This dissertation discusses the index of vulnerability to fall accident in construction projects. The objectives of the research are to develop a model of causal mechanism and vulnerability dynamic of construction projects leading to fall accidents and to determine the most effective safety programme to reduce the vulnerability.
The methodology covers questionnaire survey, field observation, study of accident reports, and focus group discussion. Fuzzy multi expert decision making and system dynamic analysis were used to mode causal mechanism and vulnerability dynamic.
The research found causal interactions of human, equipment, management, organisation, environment factors, and changing of vulnerability indices of those factors across project delivery. Socialisation of safety programmes, inspection, and pinalty are the most effective programme to reduce vulnerability of construction project leading to fall accidents.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
D1861
UI - Disertasi Membership  Universitas Indonesia Library
cover
Dzikry Aulia
"Penelitian ini bertujuan untuk mendapatkan besarnya penalti biaya untuk kecelakaan kerja di proyek konstruksi dan juga bagaimana sistem penalti biaya tersebut diterapkan di Indonesia. Dalam peraturan perundang-undangan Negara Republik Indonesia, yang mencantumkan sanksi kepada perlindungan keselamatan pekerjanya hanya terdapat pada UU No. 1 tahun 1970 di pasal 15 berupa denda senilai Rp 100.000,- dan UU No. 13 tahun 2003 di pasal 86 dan 87 untuk kewajiban perlindungan pekerjanya dan sanksinya terdapat di pasal 190 hanya berupa sanksi administratif. Penelitian ini menggunakan metode analisa kualitatif dengan kuesioner wawancara mendalam yang dilakukan kepada pakarpakar K3. Sistem penalti biaya mencakup pemberian penalti berupa biaya dari pemerintah kepada perusahaan kontraktor yang dalam proyek pekerjaannya terdapat kasus kecelakaan berupa kecelakaan berat tanpa kematian dan kecelakaan berupa kematian. Besarnya penalti untuk kecelakaan berat tanpa kematian adalah Rp 100-250 Juta dan besarnya penalti untuk kecelakaan berupa kematian adalah Rp 250-500 Juta. Penerapan sistem penalti biaya merujuk kepada sistem penalti yang sudah diterapkan di negara Amerika, Inggris, Kanada, Australia, dan Singapura. Penerapan sistem penalti biaya tersebut meliputi dilaksanakannya sistem reward dan punishment, melakukan penambahan tenaga pengawas di lokasi proyek, mekanisme pelaporan kecelakaan dan klaim korban kecelakaan, dan pembentukan lembaga independen dalam pemberian penalti biaya ke pemerintah.

This study aimed to obtain the amount of penalty charges for occupational injuries in construction projects and also how the cost penalty system applied in Indonesia. In the legislation of the Republic of Indonesia, which includes sanctions against safety protection workers only found in Law. 1 in 1970 in Article 15, to a fine of Rp 100.000, - and the Law. 13 of 2003 in chapter 86 and 87 for the liability protection of workers and the sanctions contained in Article 190 only in the form of administrative sanction. This study uses qualitative analysis with questionnaires conducted in-depth interviews to experts K3. Penalty system costs include the cost of giving a penalty to the government contracting company in project work there is a serious accident accident cases with no deaths and accidents in the form of death. The amount of the penalty for severe accidents without death is USD 100-250 million and the amount of penalty to be death accident is USD 250-500 million. Application of the penalty system costs refer to the penalty system that has been implemented in the United states, Britain, Canada, Australia, and Singapore. Application of the penalty system costs include the implementation of reward and punishment system, conducted additional supervisory personnel at the project site, and accident reporting mechanisms accident victims' claims, and the establishment of independent agencies in awarding a penalty fee to the government."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S46102
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hare, Van Court
New York: Harcourt, Brace and World, 1967
620.7 HAR s
Buku Teks SO  Universitas Indonesia Library
cover
Evan Candra
"Konstruksi dapat dianggap sebagai industri dinamik, yang secara konstan selalu menghadapi ketidakpastian. Ketidakpastian ini membuat para manajemen sulit untuk menhitung biaya yang kadang berkonsekuensi berujung pada biaya yang berlebihan. Sukses dari sebuah sudut pandang manajemen dapat dilihat dari selesainya sebuah proyek dengan kemungkinan biaya terkecil, secepat mungkin, kualitas tinggi, tanpa kecelakaan, dan sebagainya. Tetapi terkadang terjadi sesuatu kecelakaan yang dapat berakibat kepada kelebihan biaya proyek. Ini dapat terjadi karena diakibatkan oleh banyak faktor seperti estimator yang tidak berpengalaman, pengetahuan kontraktor yang kurang tentang lokasi proyek, penggunaan material yang salah, penyediaan data yang salah, dan banyak lainnya. Dalam laporan ini, studi kasus yang digunakan adalah Grand Hyatt Proyek. Ini merupakan salah satu contoh proyek yang kelebihan biaya di Indonesia.

Construction can be considered as a dynamic industry, which is constantly facing uncertainties. These uncertainties and the many stakeholders in these kinds of projects, make the management of costs difficult, which consequently causes cost overruns. Success from the project management's viewpoint is when the project is completed with the lowest possible cost, as quickly as possible, with the highest quality, with no accidents, etc. But sometimes there's an accidents that cause initial cost become overruns. This can be caused by many factors such as inexperience estimators, lack of knowledge of contractor about location of the project, wrong materials usage, wrong historical cost data, and many more. In this report, the case study that used to be is Grand Hyatt Hotel project. There is one of examples of cost overruns in construction project in Indonesia."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S54174
UI - Tugas Akhir  Universitas Indonesia Library
cover
Hilda Jusuf
"Estimasi biaya merupakan kunci kesuksesan suatu proyek dari tahap konsep hingga tahap akhir. Dua komponen yang terdapat dalam estimasi biaya adalah biaya langsung dan biaya tidak langsung. Biaya langsung memegang peranan yang penting karena besarnya dominan terhadap total biaya. Efisiensi pada biaya langsung dapat berpengaruh terhadap laba kotor proyek. Dengan menggunakan data historis proyek, bobot laba kotor akan diketahui berdasarkan bobot biaya langsung yang ada. Metode yang digunakan dalam penelitian ini adalah Fuzzy Logic dan Artificial Neural Network menggunakan Matlab. Dari penelitian yang dilakukan, diketahui bahwa untuk proyek kampus, ANN memberikan hasil yang lebih akurat. Dengan menggunakan hasil ini, simulasi telah dilakukan dan diperoleh range laba kotor proyek sebesar (13,51-14,69%). Sementara itu range untuk komponen biaya langsungnya (25,93-34,13%) untuk biaya upah; (45,71-56,11%) untuk biaya bahan; (27,61-43,90%) untuk biaya subkontraktor; (5,74-14,3%) untuk biaya peralatan; dan (9,08-12,19%) untuk biaya overhead proyek. Sedangkan untuk proyek kantor, Fuzzy Logic memberikan hasil yang lebih akurat. Dengan menggunakan hasil tersebut, simulasi telah dilakukan dan diperoleh range laba kotor sebesar (13,09-16,74%). Range biaya langsungnya (23,32-31,33%) untuk biaya upah; (44,47-53,08%) untuk biaya bahan; (37,47-48,99%) untuk biaya subkontraktor; (8,21-13,52%) untuk biaya peralatan; dan (11,87-16,09%) untuk biaya overhead proyek.

Cost estimate is the key to the success of a project from concept stage until the final stage. Two components are included in cost estimate are direct cost and indirect cost. Direct cost is important because of the large dominant to the total cost. Efficiency on direct cost can effecting gross profit project. With use historical data project, weight of gross profit will be known based on existing weight of direct cost. Methods used in this research are Fuzzy Logic and Artificial Neural Network with Matlab. From the research conducted, it is known that for college project, ANN produced more accurate output. With use this result, simulation have been done and obtained range of gross profit by (13,51-14,69%). While range components of direct cost are (25,93-34,13%) for wage cost; (45,71- 56,11%) for materials cost; (27,61-43,90%) for subcontractor cost; (5,74-14,3%) for equipment cost; and (9,08-12,19%) for overhead project cost. For office project, Fuzzy Logic gives more accurate result. With use this result, simulation have been done and obtained range of gross profit by (13,09-16,74%). Range components of direct cost are (23,32-31,33%) for wage cost; (44,47-53,08%) for materials cost; (37,47-48,99%) for subcontractor cost; (8,21-13,52%) for equipment cost, and (11,87-16,09%) for overhead project cost."
Depok: Fakultas Teknik Universitas Indonesia, 2012
S44719
UI - Skripsi Membership  Universitas Indonesia Library
cover
Deo Lahara
"ABSTRAK
Pendeteksian topik topic detection adalah suatu proses yang digunakan untuk menganalisis kata-kata pada suatu koleksi data tekstual untuk menentukan topik-topik yang ada pada koleksi tersebut. Pendeteksian topik pada dokumen yang sangat besar sulit dilakukan secara manual sehingga dibutuhkan metode otomatis. Masalah pendeteksian topik secara otomatis dikenal dengan istilah topic detection and tracking TDT . Suatu metode alternatif TDT untuk masalah pendeteksian topik adalah fuzzy C-means FCM. Pada metode fuzzy C-means, umumnya pusat cluster ditentukan secara acak atau inisialisasi random. Namun, terkait dengan masalah dimensi yang tinggi pada inisialisasi random akan menyebabkan algoritma konvergen ke satu pusat. Sehingga, topik-topik yang dihasilkan antara satu dengan yang lainnya sama. Untuk itu, diperlukan metode untuk membuat inisialisasi yang dapat mengatasi masalah tersebut. Salah satu metode inisialisasi yang akan dikembangkan pada penelitian ini adalah metode Singular Value Decomposition SVD . Hasil simulasi menunjukan bahwa metode inisialisasi dapat mengatasi permasalahan fuzzy C-means pada data dimensi yang tinggi sehingga topik-topik yang dihasilkan tidak sama terhadap satu sama lain.

ABSTRAK
Topic detection is a process used to analyze words in a collection of textual data to determine the topics of the collection. Detecting topics on a very large document is hardly done manually so that automatic methods are needed. Automatic method to detect topics in textual documents is known as Topic Detection and Tracking TDT . An alternative method of TDT for topic detection problems is fuzzy C means FCM . In the FCM method, generally the cluster center is random initialization. However, related to the problem of high dimensional random initialization causes the algorithm to converge to one center, it means that all generated topics are similar. For that, a method is needed to create an initialization that resolves the problem. One of the initialization methods that will be developed in this research is Singular Value Decomposition SVD method. The simulation results show that the SVD initialization method can overcome the fuzzy C means problem in the high dimension data so that the resulting topics are not equal to each other. "
2017
S69378
UI - Skripsi Membership  Universitas Indonesia Library
cover
Jihan Aulia
"Saat ini, industri pertambangan batubara memiliki peran yang besar dalam pembangunan nasional karena batubara merupakan sumber energi potensial yang sangat menjanjikan untuk terus dikembangkan. Industri pertambangan ini memiliki karakteristik sebagai industri yang padat modal, padat teknologi, dan memiliki risiko yang tinggi. Apabila produksi batubara menurun, maka dapat mempengaruhi sektor ekonomi Indonesia yang merupakan salah satu penghasil batubara terbesar di dunia. Oleh karena itu, diperlukan manajemen risiko untuk keselamatan kerja, mengatasi berbagai masalah yang muncul, maupun penanggulangan bahaya di area tambang demi menunjang terealisasinya target produksi batubara. Penelitian ini bertujuan untuk mengidentifikasi, menganalisis risiko, dan merancang strategi mitigasi risiko pada aktivitas penambangan batubara dengan menggunakan metode FMECAFuzzy TOPSIS. Dari penelitian ini, teridentifikasi 76 risiko yang telah dilakukan penilaian risiko dengan 8 risiko kecelakaan prioritas yang potensial, serta mitigasi yang dapat dilakukan untuk menanggulangi risiko ini.

Currently, the coal mining industry has a major role in national development because coal is a potential energy source that is very promising to continue to be developed. The mining industry has the characteristics of being a capitalintensive, technology-intensive, and high-risk industry. If there is a decrease in coal production, it can affect the Indonesian economic sector which is one of the largest coal producers in the world. Therefore, risk management is needed to work safety, as well as to overcome hazards in the mining area in order to support the realization of coal production targets. This paper aims to identify, analyze risks, and design risk mitigation strategies in coal mining activities using the FMECA (Failure Modes, Effect, and Criticality Analysis) - Fuzzy TOPSIS (Technique for Order Performance by Similarity to Ideal Solution) method. From this research, obtained 76 risks that have been assessed with 8 potential risk of priority accidents, as well as mitigation strategies that can be applied to overcome these risks."
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>