Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 169038 dokumen yang sesuai dengan query
cover
Addy Kurnia Komara
Depok: Fakultas Teknik Universitas Indonesia, 2001
TA3214
UI - Tugas Akhir  Universitas Indonesia Library
cover
Addy Kurnia Komara
"Dalam jaringan Multiprotocol Label Switching (MPLS), paket data dilewatkan melalui suatu Label Switch Path (LSP) yang diatur oleh Label Distribution Protocol (LDP), dengan menggunakan informasi tabel routing yang dibentuk oleh protokol routing di network layer. Algoritma routing yang digunakan pada network layer, masih memiliki resiko terjadinya loop dalam penentuan routing. Jika dalam jaringan MPLS tidak terdapat metode penanganan loop routing, maka terdapat resiko bagi LSP untuk membentuk looping paket kontrol ataupun looping paket data. Salah satu metode yang dapat digunakan adalah metode loop prevention (pencegahan loop), yang melakukan pencegahan terjadinya loop sebelum LSP dibentuk. Salah satu metode pencegahan loop yang diusulkan adalah mekanisme dengan menggunakan colored thread yang terdapat dalam RFC. 3063.
Mekanisme pencegahan loop yang ditawarkan dalam RFC 3063 masih dapat disempumakan dalam hal prosedur pembebasan link dari loop. Untuk tujuan ini dilakukan tiga jenis modifikasi. Modifikasi I adalah dilakukannya pengiriman thread withdrawing ke upstream node ketika incoming link mendeteksi terjadinya loop dan dilakukannya pengiriman thread color baru pada rute alternatif ketika LSR (Label Switch Router) menerima thread withdrawing. Modifikasi II melengkapi modifikasi I dengan dilakukannya pengiriman thread withdrawing jika thread color datang pada stalled incoming link. Modifikasi III melengkapi modifikasi II, namun ketika LSR menerima thread withdrawing, akan diteruskan ke incoming link dengan hop count terbesar, tanpa mencari rute alternatif.
Hasil simulasi menunjukkan bahwa. jumlah message kontrol dan waktu proses modifikasi I ,II dan modifikasi III masih lebih besar dari pada tanpa modifikasi. Sedangkan tingkat keberhasilan pembebasan link dari loop modifikasi III paling besar jika dibandingkan dengan tanpa modifikasi, modifikasi I dan II. Karenanya modifikasi III merupakan pilihan terbaik yang dapat digunakan sebagai prosedur tambahan pada mekanisme colored thread untuk melakukan pembebasan link dari loop pada jaringan MPLS.

In Multi-protocol Label Switching (MPLS) network, data packets are forwarded trough Label Switch Paths (LSPs) which are set up using a Label Distribution Protocol (LDP), using information from routing table which has been build by routing protocol in network layer. Routing algorithm that was used in network layer may not be loop-free. If there is no mechanism to handle loop routing in MPLS network, there is a possibility of an LSP forming a control packet loop or data packet loop. One of the methods that can be used is loop prevention method that prevents LSP forming loops. A loop prevention mechanism using colored thread was proposed in R FC.3063.
Loop prevention mechanism that proposed in RFC.3063 can be modified in procedure to make LSPs free from loop. For this purpose, there are three kind of modification can be done in procedure when a node detecting a loop. First modification is propagating thread withdrawing to upstream node when incoming link detecting a loop and extending new thread color to a new next hop when LSR (Label Switch Router) receiving thread withdrawing. Second Modification is adding first modification in propagating thread withdrawing when thread color arrive at the stalled incoming link. Third modification is adding 2nd modification, but LSR will propagate thread withdrawing to the incoming link with maximum hop count when receiving thread withdrawing from outgoing link, without looking for alternative route.
Simulation result shows that numbers of control message and duration time for all of the modification are greater than without modification. On the other hand, successful ratio of clearing link from loop for third modification is the best for all. So, the third modification is the best choice that can be added in colored thread mechanism as a procedure for clearing link from loop in MPLS network.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T3765
UI - Tesis Membership  Universitas Indonesia Library
cover
Heru Kurniawan
"Sampai saat ini ATM switch generasi Pertama menggunakan skema Explicit Forward Congestion Indication (EFCI) untuk kontrol kongesti layanan trafik ABR. Dengan cepatnya perkembangan teknologj Switching, generasi kedua ATM switch akan Dilengkapi dengan mekanisme kontrol kongesti Explicit Rate (ER). Skema Enhanced proportional Rate Control Algorithm, (EPRCA) merupakan salah satu mekanisme kontrol kongesti ER yang telah menjadi stand didalam ATM Forum. Karena mempunyai performansi yang cukup baik dan kemudahan dalarn implementasi, maka skema EPRCA akan menjadi pilihan beberapa vendor ATM untuk kontrol kongesti layanan trafik ABR.
Pada periode transisi dari generasj pertama ke generasi kedua ATM switch, penggun skema EFCI dengan EPRCA dalam suatu jaringan ATM tidak dapat dihindarkan. Karena terdapat perbedaan dalam Operasi kerjanya, maka interoperabilitas penggunaan kedua skema kontrol kongesti tersebut akan menimbulkan permasalahan dan isi performansi yang dihasilkan.
Dalam tesis ini, akan diteliti pengaruh penggunaan barga parameter kontrol Rate Increase Factor (RIF) yang berbeda terhadap hasil performansi pada skema EFCI dan skema EPRCA, serta pada interoperabilitas skema EFCI dengan EPRCA dalam suatu jaringan ATM.
Dari hasil simulasi dapat ditunjukkan bahwa beat-down problem yang terjadi pada Iingkungan skema EFCI merupakan fungsi dan parameter kontrol RIF dan dengan RIF yang agresif tinggi dapat diperoleh performansi yang cukup baik. Sedangkan pada skema EPRCA, pengaruh penggunaan harga RIF yang berbeda tidak akan menyebabkan beat-down problem dan performansi yang dihasilkan sesuai dengan yang diharapkan.
Sedangkan hasil performansi pada interoperabilitas skema EFCI dengan EPRCA sangat dipengaruhi oleh pemeliharaan harga RIF dan lokasi penempatan skema EPRCA. Untuk harga RIF yang konservatif rendah akan terjadi peningkatan performansi sebaliknya untuk harga RIF yang agresif tinggi akan mengakibatkan penurunan Performansi. Beat-down problem yang terjadi untuk sumber yang melewati multi-hop link pada lingkungan skema EFCI dapat dihilangkan jika skema EPRCA ditempatkan Pada least critical switch.

Currently, the first generation of the ATM switches use Explicit Forward Congestin Indication (EFCI) scheme for Congestion control mechanism of the ABR services. With the advances in switching technologies, the next generation of the ATM switches will employ the Explicit Rate (ER) congestion control mechanisms. The Enhanced Proportional Rate Coritol Algorithm (EPRCA) scheme is selected as one of the ER congestion control mechanisms by the ATM Forum. Because the EPRCA scheme has good performance and low implementation complexity, the ATM switch vendors will use it for congestion control mechanism of the ABR services.
During transition period from the first to the second generation of the ATM switches, the interoperability between EFCI and EPRCA schemes in the ATM net? ork became unavoidable. Because of the differences in their basic operating incehanisilis, their interoperation may be problematic in terms of the network perfoniiance. This thesis focuses on the impact on performance of the Raie Increase Factor (RIF) parameter selection in the EFCI and EPRCA schemes, also in the ititeroperahility between EFCI and EPRCA schemes.
The simulation results show that beat-down problem in an all EFCI scheme environment is function of RIF parameter. A more aggressive RIF value leads to a hìgher performance. However, in the EPRCA scheme environment with use different value of the RIF parameter, it will not make any beat-down problem and the performance results as expected.
From the interoperability perspective, the simulations conducted show that the RIF parameter selection and location of the EPRCA scheme will drive the performance of interoperability between EFCI and EPRCA schemes. With conservative RIF value will leads to performance improvement. On the other hand, with aggressive RIF value will leads to performance degradation. Beat-down problem of a multi-hop link in the EFCI scheme environment might be omitted if the EPRCA scheme is located at ihe Least critical switch.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T3766
UI - Tesis Membership  Universitas Indonesia Library
cover
Harry Sudibyo S.
"ABSTRAK
Paper ini menyajikan cara-cara perutean sinyal power, sinyal ground dan sinyal logic dalam channel-channel pada suatu chip VLSI yaitu 2 dual-port register cells. Penanganan masalah perutean ini dilakukan oleh sebuah channel router tertentu. Mula-mula akan dijelaskan dampak dari sinyal power dan ground pada perutean sinyal logic. Kemudian diberikan suatu prosedur untuk jalur power yang ampuh untuk mengurangi kesalahan yang terjadi dalam perutean secara manual. Setelah semua teori pendukung dan metode penyelesaian masalah yang mungkin telah disampaikan, baru kemudian diaplikasikan kedalam suatu rangkaian yaitu 2 dual-port register cell. Melalui pengaplikasian ini kita dapat melihat bagaimana teknik perutean yang dibahas sebelumnya diterapkan dalam sebuah masalah yang real."
Fakultas Teknik Universitas Indonesia, 1997
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Femy Sanana Sanvia
"Perubahan bentuk jaringan distribusi radial menjadi bentuk jaringan spindle pada GI Ciawi Bogor bertujuan untuk meningkatkan keandalan sistem tenaga listrik dengan adanya penyulang express yang dapat berfungsi sebagai suplai cadangan. Untuk menunjang sistem yang handal maka diperlukan adanya sistem proteksi yang baik. Pada sistem proteksi jaringan distribusi spindle digunakan rele arus lebih sebagai pengaman dari gangguan hubung singkat. Tahapan awal dalam menentukan setting rele arus lebih adalah dengan melakukan studi aliran daya untuk menentukan arus beban maksimum (nominal) yang melalui rele. Selanjutnya dilakukan perhitungan arus gangguan hubung singkat untuk menentukan setting arus pada rele.
Skripsi ini akan membahas mengenai koordinasi proteksi rele arus lebih pada perencanaan jaringan distribusi spindle GI Ciawi Trafo 1 Bogor. Berdasarkan hasil simulasi didapatkan bahwa koordinasi antar rele telah bekerja sesuai urutan dengan waktu kerja antar rele berkisar 0,1-0,2 detik.

Changes in the radial distribution network form into the spindle network form at GI Ciawi Bogor aims to increase the reliability of power system with the express feeder which could serve as backup supply. To support the reliability of power system then it is necessary to have a good protection system. The protection system of spindle distribution network uses the overcurrent relay to protect from nuisance overcurrent. The first step of determining overcurrent relay setting is perform power flow studies to determine the maximum load current (nominal) passing through the relay. Further step is perform the short circuit fault current calculations to determine the current setting of the relay.
This thesis will discuss about coordination of overcurrent relay in the planning of spindle distribution network in GI Ciawi Transformers 1 Bogor. The result of simulations is the coordination between the relay has been working sequentially with the work time of relay range is 0,1-0,2 seconds.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S52579
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rahmadi Mulyohartono
Depok: Fakultas Teknik Universitas Indonesia, 1996
TA3223
UI - Tugas Akhir  Universitas Indonesia Library
cover
Wahidin Wahab
Depok: Fakultas Teknik Universitas Indonesia, 1998
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Sianturi, Rumondang R.
Depok: Fakultas Teknik Universitas Indonesia, 2001
TA3221
UI - Tugas Akhir  Universitas Indonesia Library
cover
Van Valkenburg, Mac Elwyn
Jakarta: Erlangga, 1988
621.319 2 VAL n
Buku Teks  Universitas Indonesia Library
cover
Ryska Mayasari
"Keandalan sistem tenaga listrik sangat penting mengingat tingginya permintaan kontinuitas penyaluran dari sumber energi listrik ke beban. Semakin tinggi tingkat keandalan maka akan semakin baik juga sistem tersebut. Banyak faktor yang mempengaruhi keandalan suatu sistem, salah satunya adalah proteksi dari sistem tersebut. Kecepatan pelayanan dan pengusutan gangguan sangat berpengaruh terhadap kinerja dan keandalan jaringan.Sistem catu daya tanpa putus diciptakan untuk menjaga kontinuitas penyaluran daya di mana tidak diizinkan terjadinya pemadaman suplai energi listrik ke beban.
Sistem ini banyak diterapkan di beberapa tempat oleh konsumen-konsumen tertentu, salah satunya PT.Telekomunikasi Indonesia yang terhubung pada Penyulang Serambi. Sistem proteksi dan manuver yang baik dengan optimasi penambahan kerja rele pada setiap gardu distribusi akan dapat meningkatkan keandalan jaringan dari terjadinya pemadaman akibat hubung singkat yang ditunjukkan oleh semakin singkatnya waktu pengidentifikasian gangguan.

Reliability of the electric power systemis very important which had a high demand for continuity electric distribution from the electrical source to the load. The higher level, the better reliability ofthe system will get. Many factors affect the reliability of a system, one of which is the protection system. No-break system designed to maintain continuity of the distribution of power in which the cuts are not allowed to supply electrical energy to the load.
No-break system was widely applied in some places by certain consumer sone of which is PT. Telekomunikasi Indonesia which connected to the Serambi Feeder. Protection system and good maneuverability with optimization additional relay which work on every distribution substation will be able to increase the network reliability due to a short circuit which is shown by the brevity of interference time identifying.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S46274
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>