Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 55446 dokumen yang sesuai dengan query
cover
cover
cover
Koichi Murata
"The purpose of this paper is to describe a proposed support system of Kaizen activity which contributes to improve related performance indicators in a production department. Background research consisted of the following three parts. First, a Decision Support System (DSS) provided an illustration for the proposed system; its three elements of interest include Kaizen case-base, Model-base and User-interface. The first element accumulates useful cases for developing new cases. The second element accumulates models to utilize the case-base effectively, including the Kaizen strategic model, Kaizen objective model, Kaizen data analysis model, and model building blocks and subroutines. The third element links Kaizen case-base, Model-base and Kaizen engineers. The linkages are realized by four procedures: installation of proposed support system, construction of Kaizen case-base, evaluation of the case-base, and development of new cases. The second portion of our research was a discussion of Kaizen case-base from three viewpoints: its utilization purpose, its information structure, and data types accumulated in it. Thirdly, investigation of the three primary model types mentioned above was performed and the proposed model-base was constructed. Proposed system was designed to maintain and improve Key Performance Indicators (KPIs) in a manufacturing system through discussions with Kaizen experts whose factory collaborated in this research."
Depok: Faculty of Engineering, Universitas Indonesia, 2011
UI-IJTECH 2:3 (2011)
Artikel Jurnal  Universitas Indonesia Library
cover
Faisal Akbar
"Penelitian ini menggabungkan value stream mapping dengan aspek biaya. Value stream mapping menyediakan blueprint untuk implementasi konsep lean manufacturing dengan menggambarkan aliran informasi dan material pada value stream. Integrasi aspek biaya dalam value stream untuk memperkenalkan cost line yang dapat membantu memudahkan dalam pengambilan keputusan. Redesign VSM ini membantu memfokuskan area perbaikan. Perhitungan takt time berfungsi sebagai pembanding bagi kecepatan produksi. Target cost berfungsi sebagai pembanding bagi biaya produksi.
Hasil penelitian memperlihatkan bahwa dengan implementasi cost integrated VSM dapat membawa penurunan pada hal-hal berikut: Lead time produksi turun sebanyak 59,8%, Total Cycle time turun sebanyak 19,75%, Total value added cost turun sebanyak 2,6%, Total non value added cost turun sebanyak 53,4%, Jarak transportasi turun sebanyak 19,34%. Hal ini membuktikan dengan mengadopsi cost integrated VSM pada industri otomotif dapat membuat perbaikan yang cukup signifikan.
This paper integrate value stream map with the cost aspect. A value stream map provides a blueprint for implementing lean manufacturing concepts by illustrating information and materials flow in a value stream. The objective of the present work is to integrate the various cost aspects. The idea is to introduce a cost line, which enhances the clarity in decision making. The redesign map proves to be effective in highlighting the improvement area. Taft time calculation is carried out to set the pace of production. Target cost is set as a benchmark for product cost.
The result of the study indicates that implementing cost integrated VSM led to reduction in the following areas: Production lead time by 59.8 %, Total Cycle time by 19.75 %, Total value added cost by 2.6 %, Total non value added cost by 53.4%, Travel distance by 19.34 %. It found that adopting cost integrated value stream in automotive industry can make significant improvement.
"
Depok: Fakultas Teknik Universitas Indonesia, 2011
S1491
UI - Skripsi Open  Universitas Indonesia Library
cover
M. Misbahul Muzakki
"Pencapaian produktivitas perusahaan PT. XYZ kurang optimal disebabkan terdapat berbagai hambatan, salah satu hambatan yang sering terjadi di area produksi yaitu waste. Sehingga untuk mengurangi waste tersebut diperkenalkanlah metode Value Stream Mapping yang merupakan salah satu metode lean manufacturing. Keunggulan VSM yaitu dapat mengvisualisasikan aliran proses value added, necessary but non value added dan non value added. Serta dilakukan improvement pada beberapa workstation agar sistem produksi menjadi lebih baik, selanjutnya dilakukan simulasi pada current VSM dan propose VSM.
Output dari penelitian ini adalah identifikasi waste dimana waste terbesar pada perusahaan ini adalah waiting, penurunan lead time material menjadi lebih cepat 19%, penurunan aktivitas transportasi sebesar 11%, pengurangan inventory sebanyak 16% dan peningkatan throughput produksi sebesar 24%.

Productivity gains of PT. XYZ is less optimal because there are many obstacles, one of the obstacles that often occur in the production area is waste. Reducing this waste can use Value Stream Mapping Method, which is one of the methods of lean manufacturing. Advantage that it can be visualization process flow of value added, necessary but non value added and non-value added. Besides that doing some improvement on multiple workstations to be a better system of production system, then performed simulations based on current VSM and Propose VSM.
Output of this research; to identify the biggest waste where this the biggest waste of company is waiting, decrease lead time material to be faster 19%, reduction of transport activity by 11%, reduction in inventory by 16% and increase production throughput by 24%.
"
Depok: Fakultas Teknik Universitas Indonesia, 2012
S43770
UI - Skripsi Open  Universitas Indonesia Library
cover
Lathifuddin Firas Nurseto
"Produksi kendaraan pada industri otomotif Indonesia dalam delapan tahun terakhir cenderung mengalami peningkatan. Hal ini mendorong seluruh industri otomotif untuk meningkatkan performa sistem manufakturnya agar dapat bersaing dengan kompetitor lain. PT Ganding Toolsindo merupakan perusahaan otomotif yang berperan sebagai pemasok sub assembly part pada tingkat tier 2.
Sebagai perusahaan dengan tipe tata letak mesin process layout, penyesuaian tata letak mesin dengan keluarga produk yang ada menjadi penting. Tata letak mesin pada kondisi saat ini yang belum disesuaikan dengan keluarga produk menimbulkan pemborosan transportasi material handling dan aliran material yang tidak efisien sehingga berefek pada meningkatnya lead time mayoritas produk dan mengakibatkan keterlambatan pengiriman atau tidak terpenuhinya target produksi.
Penelitian ini dirancang untuk melakukan perancangan lean production system berbasis konsep cell manufacturing menggunakan Modified Single Linkage Clustering dengan parameter performa yang terdiri atas jarak dan durasi material handling, lead time, serta total waktu produksi. Hasil penelitian menunjukkan bahwa total jarak dan durasi materal handling berkurang sebanyak 60 , rata-rata lead time seluruh jenis produk berkurang sebesar 55 , dan total waktu produksi berkurang sebanyak 4.

Vehicle production in Indonesian automotive industry tend to increase in the last 8 years. This encourages the entire automotive industry to improve the performance of its manufacturing systems in order to compete with existing competitors. PT Ganding Toolsindo is an automotive company at second tier level that supply sub assembly part.
As a company that using process layout type, adjustment of machine layout with the existing product family becomes important. Existing machine layout in this company that has not been adjusted with the product family cause waste of material handling transportation and inefficient material flow resulting in increased lead time in the majority of products and resulting in delays in delivery or unfulfilled production targets.
This research is designed to do the design of lean production system based on cell manufacturing concept using Modified Single Linkage Clustering by using performance parameter consisting of distance and duration of material handling, lead time, and total time of production. Result of the research showed that total distance and duration of material handling decrease in the amount of 60 , lead time average of all product decrease in amount of 55 , and total time of production decrease in amount of 4 compared to the initial machine layout.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S67208
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ilham Filardhi Anugrawan
"Semakin ketatnya persaingan industri otomotif, merupakan suatu tantangan untuk tiap perusahaan meningkatkan daya saing nya. Daya saing tersebut dapat ditingkatkan dengan meningkatkan efisiensi produksi. Dalam penelitian kali ini, konsep Lean Manufacturing menggunakan Value Stream Mapping (VSM) diimplementasikan pada salah satu UKM Komponen Otomotif di Indonesia sehingga dapat meningkatkan efisiensi produksi dengan mengurangi pemborosan dan meningkatkan kapasitas produksinya. Penggunaan Value Stream Mapping bertujuan untuk mendapatkan gambaran secara menyeluruh sehingga dapat mengidentifikasi pemborosan yang ada pada lini produksi. Kemudian seperangkat solusi akan dicari untuk mengatasi pemborosan tersebut dan berujung pada peningkatan daya saing perusahaan. Penerapan pada UKM Komponen Otomotif ini menjadi motivasi untuk terus memperbaiki kondisi industri otomotif Indonesia, tidak hanya pada rantai pasok teratas, tetapi juga industri-industri dibawahnya.

Increasing competition in the automotive industry, is a challenge for each company to improve its competitiveness. The competitiveness can be improved by increasing the efficiency of production. In this study, the concept of Lean Manufacturing using Value Stream Mapping (VSM) is implemented in one of Automotive Components SMEs in Indonesia so as to improve production efficiency by reducing wastage and increase its production capacity. Use of Value Stream Mapping aims to obtain an overall picture so as to identify existing waste in the production line. Then a set of solutions will be sought to resolve the waste and lead to increase competitiveness of companies. This implementation at the Automotive Components SME is a motivation to continue to improve the performance of Indonesia's automotive industry, not only from the top of the supply chain, but also industries underneath it."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S63879
UI - Skripsi Membership  Universitas Indonesia Library
cover
Tambunan, Pretty Angelina
"Industri stamping memiliki proses produksi yang tidak efektif dan efisien seperti inventory WIP, transportasi yang tidak perlu serta kelebihan produksi. Tantangan di masa kini adalah untuk mengubah industri stamping dari produksi masal yang tradisional menjadi sistem produksi yang lebih efektif untuk meningkatkan produktivitas, kinerja keseluruhan, dan kapasitas utilisasi untuk mencapai permintaan yang tinggi.
Tujuan utama dari skripsi ini adalah untuk mendesain proses produksi pada industri stamping yang berdasarkan pada konsep lean manufacturing. Penghilangan waste atau non value added activities adalah salah satu kunci untuk meningkatkan produktivitas perusahaan. Untuk mengobservasi dan mengetahui peningkatan performanya, digunakan pendekatan value stream mapping. Dengan begitu, dapat diketahui berapa banyak waktu untuk value added dan non value added activity yang dapat dihilangkan.
Hasil penelitian ini mengajukan suatu usulan peta proses produksi pada industri stamping yang mengacu pada filosofi lean production system. Setelah rancangan lean production system ini diimplementasikan, perusahaan akan mendapatkan beberapa manfaat, seperti berkurangnya production lead time, total cycle time, serta jarak transportasi.

The stamping industry is having ineffective and inefficient process such as inventory, unnecessary transportation and excess production. The challenge today is to transform the stamping industry from traditional mass production became more effective production systems to improve productivity, overall performance, and capacity utilization to reach high demand.
This thesis implements lean manufacturing to address these challenges. The elimination of waste or non value added activities is one of the keys to improving the productivity of the company. To observe and determine its performance improvement, the approach of value stream mapping is used. That way, it can be seen how much time to value added and non value added activity that can be eliminated.
The result of this research is present a proposed value stream mapping of production process that refer to lean production system philosophy. After a lean production system design is implemented, the company will get some benefits, such as reduced of production lead time, cycle time, as well as the flexibility to change the composition of the mixture and the total of travel distance.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S69191
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ismail Kurnia
"Lean System adalah system produksi yang berfokus pada identifikasi secara sistematis dan penghapusan waste (pemborosan) dari suatu proses dan melibatkan perubahan, meningkatkan proses, produktivitas dan memberikan produk bermutu kepada produsen dan konsumen dengan biaya terendah.
Proses produksi yang tidak efektif dan efisien menghasilkan pemborosan yang dibebankan sebagai biaya produksi. Oleh karena itu melalui penelitian ini, aktual proses produksi dipetakan ke dalam sebuah peta "VSM" (Value Stream Mapping) sehingga terlihat semua aktivitas yang menambah nilai dan yang tidak menambah nilai pada produk setelah itu menetukan area mana yang akan kita analisa dengan menggunakan 7 tools dan Failure Modes and Effect Analysis (FMEA) untuk melakukan perbaikan dalam penelitian ini di area produksi stamping di line small press. Untuk memecahkan permasalahan di dalam tempat kerja memerlukan perhatian manajemen. baik untuk pemecahan masalah langsung dan untuk mendukung's peran manajer dalam berkomunikasi, pembinaan dan pengajaran pemecahan masalah untuk pekerja (member) produksi.
Jishukens terus mengembangkan keterampilan interpersonal's manajemen sehingga mereka memahami cara yang tepat untuk melatih dan mendukung kaizen. fungsi organisasi Jishuken adalah untuk berkomunikasi, mempertahankan dan memperkuat nilai-nilai perusahaan, keyakinan dan perilaku (dikenal sebagai Toyota Way).

Lean Production System is a system that focuses on systematic identification and elimination of waste from a process, involving a change; improve processes, productivity and providing quality products to the and consumers with the lowest cost.
The production process that is not effectively and efficiently produces waste will be charged as cost of production. Therefore, through this research, the actual production process mapped into a map of "VSM" (Value Stream Mapping) so it looks all activities that add value and which do not add value to the product after it determines which areas we will analyze with 7 tools & Failure Modes and Effect Analysis (FMEA) to make improvements in this research in the area of production in line small stamping presses. To solve the problems in the workplace require management attention. Good for solving immediate problems and to support the manager's role in communication, coaching and teaching problem solving to employee (member) production.
Jishukens continue to develop interpersonal skills management so that they understand the proper way to train and support kaizen. Jishuken organization function is to communicate, maintain and strengthen the company's values, beliefs and behaviors (known as the Toyota Way).
"
Depok: Fakultas Teknik Universitas Indonesia, 2011
T29785
UI - Tesis Open  Universitas Indonesia Library
cover
Anggie Rosa
"Penelitian ini bertujuan untuk mengidentifikasi dan mengeliminasi berbagai pemborosan yang terjadi pada proses produksi tahu isi milik UKM TAISI, dengan menggunakan salah satu lean tool yaitu value stream mapping (VSM) demi tercapainya prinsip lean manufacturing. Untuk dapat memahami dan menggambarkan proses bisnis dan kegiatan produksi tahu isi, diperlukan observasi dan wawancara dengan beragam operator produksi dan nonproduksi. Penelitian ini menggunakan pendekatan VSM untuk merancang solusi produksi yang dapat mengeliminasi berbagai pemborosan. Hasil dari penelitian ini adalah telah diidentifikasi enam pemborosan utama yaitu menunggu, produk tidak sesuai spesifikasi, produksi berlebih, transportasi tidak efisien, pergerakan (motion) yang tidak perlu, dan proses yang tidak perlu. Solusi yang dihasilkan antara lain menjaga konsistensi kualitas dan datangnya bahan baku, automasi alat produksi, pemesanan bahan baku maksimal 2% melebihi permintaan harian, menggunakan conveyor/troli, penerapan paletisasi, penerapan aktivitas quality control di proses pembelahan, dan penerapan kanban system antara proses pembelahan dan pengisian. Pada future state map, solusi tersebut ditargetkan mengurangi total cycle time dari 30,74 menit menjadi 10,47 menit, total nonvalue added cycle time dari 2,92 menit menjadi 0,8 menit, dan penghematan biaya pemesanan bahan baku hingga 60%. Penelitian ini juga memberikan saran dan implementasi berbagai solusi improvement yang dijelaskan pada action plan dengan membaginya kedalam tiga kelompok aktivitas yaitu supplier loop, processing loop, dan pacemaker loop.

This study is purposed to identify and eliminate wastes in filled tofu production of UKM TAISI, by using one of lean tools called value stream mapping, to achieve lean manufacturing. To understand and map the process correctly, observations and interview techniques with workers from various types of work were done. This study using VSM approach is to propose solution regards on production process to eliminate wastes. Major findings resulted from the study are six wastes being identified which are waiting, defect, overproduction, inefficient transportation, unnecessary motion, and overprocessing. The proposed solutions are maintaining the consistency of raw material?s quality and arrival, automating production equipment by using automatic machine, ordering raw material maximum 2% more than demand on daily basis, using conveyor/trolley, installing palletization system, proceeding quality control on cutting process, and adopting kanban system between cutting and filling process. In future state map, those improvements are targeted to achieve reduction on total cycle time from 30,74 minutes to 10,47 minutes, total nonvalue added cycle time from 2,92 minutes to 0,8 minutes, and reduction on raw material ordering cost by 60%. This study also suggests implementation showed in annual action plan by dividing improvements plan into three loop of activities which are supplier loop, processing loop, and pacemaker loop."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2016
S63011
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>