Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 104331 dokumen yang sesuai dengan query
cover
"One of the consequences of regional autonomy is that many regional governments are anthusiastic to improve their transportaion infrastructures, such as constructing simple suspension bridges. Direktorat Jenderal Bina Marga Depertemen Pekerjaan Umum has published standards and compiled information of suspension bridges in various areas in Indonesia. The bridge-span is generally between 20 to80 m, some are 120 m, and about 1.7 m in width of deck. Based on the standards, some regional governments want to have the simple suspension bridge, but need larger span. Kabupaten Sragen is one of the regional governments planning to construct the suspension bridge connecting Kliwonan to Butuh. However, it is important to notice that such a type of bridge is light, thin, limited in width and in length, sensitive to bending, torsion and vibrations, which are due to the asymetric life-load and wind loads.
The objective of this study is to identify the influence of the deck-width augmentation to the behaviour of 40 m to 130 m span suspension bridge by reviewing the natural frequency of structure (bending and torsion behavior) caused by asymmetric life-loads and dynamic wind loads.
Greater length of the bridge-span results in lower natural bending frequency (fb). For a bridge with more than 90 m span length, fb is significantly low (less than 0.6 Hz). Augmenting the deck-width from 1.5 m to 1.7 m and 1.9 increases the frequency ratio (torsional frequency/fb).
Greater length of the bridge-span will also result in larger vertical and horizontal bending. However, horizontal bending declines when the bridge deck is widened. As for a bridge with more than 100 m in span and 1.5 m in width, the bending value exceeds the allowable limit. The declining percentage of the horizontal bending value due to the 0.2m width augmentation ranges between 1 to 10%. Greater span result in gretaer angle of rotation. On the other hand, wider deck shows lessening angle of rotation. It is shown that augmenting the bridge width from 1.5 m to 1.7 m and 1.5 m to 1.9 m decrease the angle of rotation to 10% and 20%, respectively. The maximum torsion response due to dynamic wind load increases in conjunction to the bridge-span augmentation. However, augmenting the bridge deck from 1.7 m to 1.9 m reduces the maximum torsion response from 1.5% to 13.4%.
For simple suspension bridge, it is suggested to limit the span length to 100 m, and deck-width augmentation from 1.5 m to 1.9 m at maximum. Greater span requires steel stiffening reinforcement on the bridge deck."
MTUGM 30:4 (2008)
Artikel Jurnal  Universitas Indonesia Library
cover
Bambang Supriyadi
Yogyakarta: FT - Universitas Muhammadiyah , 2000
624.2 BAM j
Buku Teks  Universitas Indonesia Library
cover
Isma Kania Muthmainah Sutisna
"Pembangunan proyek Jembatan, di Kabupaten Buatan, Pekanbaru, Riau bertujuan untuk mendukung pendistribusian produksi PT. Pertamina Riau. Namun, pada kenyataannya, lokasi proyek yang kurang memadai menjadi kendala dalam pengiriman alat-alat berat serta pengadaan peralatan kerja yang membuat waktu pekerjaan semakin lama. Oleh karena itu, untuk mencapai tujuan proyek dari segi waktu maka dilakukan percepatan waktu pelaksanaan dengan menggunakan metode cost slope dan Time Cost Trade Off (TCTO) yang diharapkan proyek jembatan ini dapat selesai lebih cepat dengan memperhitungkan biaya yang paling efektif. Alternatif percepatan waktu yang dilakukan adalah dengan menambah jam kerja (lembur) dan jumlah pekerja. Berdasarkan hasil perhitungan dua alternatif maka dipilihlah alternatif penambahan jam kerja (lembur) dengan percepatan waktu yang paling optimal dan pengurangan durasi proyek sebesar 8 hari dari biaya total Rp2.505.912.167,19.

Highway Bridge’s construction project at Buatan, Pekanbaru, Riau aims to support distribution of production from PT. Pertamina Pekanbaru, Riau. Whereas,in fact, the site of project inadequate become an obstacle on deliver and provide heavy equipments so that spending activities much longer. Therefore, to achieve the project goals must accelerate execution of time with cost slope and Time Cost Trade Off (TCTO) method, then hopefully, Highway bridge’s project could achieve faster by taking account of the cost effective. To apply time acceleration alternative by adding time of work (overtime) and number of employees. According to two alternatives of calculation, so that the best option has been selected the time of work (overtime) which had optimal time acceleration and reduced project duration 8 days of the total cost project is Rp2,505,912,167.19."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S47738
UI - Skripsi Membership  Universitas Indonesia Library
cover
Iman Subarkah
Bandung: Idea Dharma, 1979
624.2 IMA j
Buku Teks  Universitas Indonesia Library
cover
Eko Ariwandono
Jakarta: FT - Universitas Indonesia, 1991
624.2 EKO j (1)
Buku Teks  Universitas Indonesia Library
cover
Deta Raisa
"Kereta api di kota kota besar di Sumatera merupakan salah satu sarana transportasi darat yang mendukung kegiatan ekonomi di wilayah tersebut Keberadaan sungai yang memutus jalur kereta api menyebabkan diperlukannya pembangunan jembatan jalan kereta api Untuk mendapatkan nilai proyek jembatan yang ekonomis perlu dilakukan studi mengenai tipe jembatan yang memiliki desain paling efisien Dalam studi ini beberapa tipe jembatan rangka baja dengan pembebanan kereta api dimodelkan dengan perangkat lunak berbasis elemen hingga untuk mengetahui besarnya gaya gaya dalam aksial lendutan serta berat jembatan Beberapa variasi permodelan juga dilakukan untuk mengetahui parameter parameter tersebut Variasi yang dimaksud antara lain permodelan sebagai rangka atau portal keberadaan batang tegak mutu batang tepi atas bawah dan diagonal akibat beban suhu serta konfigurasi batang batang diagonal Hasil penelitian ini menunjukan bahwa rangka tipe Warren adalah tipe rangka batang yang paling efisien untuk desain jembatan kereta api.

Train is one of the transportation vehicles which support the economy of big cities in Sumatera Bridge construction is needed to cross the river and connects the railway Tha aims of this study is to find efficient railway bridge design In this study several types of statically determinated truss bridge are modelled with a finite element software in order to know their parameters i e axial internal forces displacements and weight of the bridges Some variations are applied in the model to analyze those parameters The variations applied are truss or frame modelization existence of vertical members quality of diagonal top and bottom chord different temperature gradient and different configuration of diagonal member Based on the result it shows that Warren type truss gives the most efficient configuration for raiway bridge design."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S46812
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dimas Adi Prasetyo
"Berdasarkan cara pengerjaannya, proyek dapat diklasifikasikan menjadi 2 tipe, yaitu proyek padat alat dan proyek padat karya. Kedua tipe proyek ini mempunyai efek dan kriteria yang berbeda. Dengan mengetahui lebih lanjut mengenai tipe-tipe proyek ini, proyek yang dilaksanakan dapat lebih dioptimalkan dan diefisiensikan sasaran metode pengerjaannya yang lebih baik. Contohnya, proyek padat alat dapat membantu dalam penyerapan tenaga kerja dan memakmurkan warga di sekitar proyek. Namun, waktu pengerjaan proyek padat karya akan memakan waktu yang lebih lama dari pada proyek padat alat dan akan memberikan efek kepada biaya pengerjaan proyek.
Lewat skripsi ini, penulis ingin mengetahui benefit ratio antara pengerjaan proyek padat alat dan padat karya. Hasil yang dicapai akan mengidentifikasi cara pengerjaan yang bisa memberikan lebih banyak benefit kepada semua pemangku kepentingan dalam proyek ini. Metode analisis yang dipakai menggunakan benefit ratio dan variabel perhitungannya adalah perbedaan biaya, perbedaan waktu pengerjaan, dan mean dari hasil kuesioner untuk mendukung keabsahan pernyataan awal.

Based on the work methods, a project can be classified in two different types, which are heavy equipment method and labor-intensive method. Both of these types of projects have different effects and criterion. By knowing more about these types of project, the project can be optimized more efficiently. Labor-intensive project can help people to get employed and prospering people around the project area. However, time frame of the project will be longer than heavy equipment method that can affect the cost of the project. Through this thesis, the author is trying to find the benefit ratio between heavy equipment method and labor-intensive method.
The result will indicate the urgency of those projects in remote areas, which is the way that the project is done that has the most benefit for all stakeholders. Method of analysis is uses benefit ratio theory and the calculation variables are included cost differences, time differences, and mean of the questionnaires result to support the initial statement. Result from this thesis is that the benefit ratio of price and time for the local citizens is higher when using labor-intensive method rather than heavy equipment method.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
S61591
UI - Skripsi Membership  Universitas Indonesia Library
cover
Yudhistira Achmad
"Kebanyakan perencana struktur bangunan cenderung memodelkan struktur atas dengan menganggap pondasi sebagai sistem yang sangat kaku sehingga pada umumnya menghasilkan respon struktur yang lebih konservatif, sementara perencana pondasi memodelkan pondasi tanpa mempertimbangkan pengaruh dari struktur atas. Kenyataannya, struktur atas dan struktur bawah saling berinteraksi tergantung pada kekakuan dari kedua sistem struktur ini.
Penelitian ini membahas tentang pengaruh jenis perletakan struktur bangunan yaitu perletakan jepit, sendi, dan fleksibel terhadap karakteristik dinamik struktur, respon seismik struktur serta berat tulangan yagn diperlukan oleh komponen utama struktur dengan bantuan software ETABS 9.7. Sistem struktur atas menggunakan sistem ganda yang merupakan kombinasi sistem dinding geser dan sistem struktur portal.
Hasil penelitian menunjukkan bahwa dinding geser pada tingkat-tingkat bawah bangunan dengan perletakan jepit atau sendi menghasilkan gaya geser dan berat tulangan yang lebih besar (overdesign) dibandingkan terhadap bangunan dengan perletakan fleksibel, sebaliknya struktur portal pada tingkat-tingkat bawah bangunan akan menghasilkan gaya geser dan berat tulangan yang lebih kecil (underdesign).

In modeling the upper structure, most of the building structure engineers tend to assume the foundationas a very rigid systemthat produces more conservative structural responses while in modeling the foundation, the foundation modeled without considering the effect of the upper structure. In fact, upper and lower structures are interacting depend on the stiffness of both the upper and lower structures system.
This research discusses the influence of the type of building structures supports namely fixed support, hinged support and flexible support to the dynamic characteristics of the structure, the seismic response of the structure and the weight of the reinforcement needed by the main structure`s components using ETABS 9.7.The upper structure use a dual system which is a combination of shearwall system and the frame system.
The results show that the shearwall at the lower levels of fixed support building or hinged support buildingprovide larger shear force and heavier reinforcement (overdesign)compared to the flexible support building. Otherwise, the frame structuresat lower levels of the building providesmaller shear force and lighter reinforcement (underdesign).
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
S56115
UI - Skripsi Membership  Universitas Indonesia Library
cover
Agoes Yudha Hartono
"ABSTRAK
Incinerator medis RSUPN dr. Cipto Mangunkusumo
adalah incinerator tipe Pirolisis, di mana pambakaran
dilakukan dengan 2 ( dua ) tahap terhadap gas buangan
yang dihasilkan.
Reaktor yang dijadikan obyek penelitian adalah
incinerator medis yang berskala lapangan dengan bahan
bakar solar . Masukan limhah adalah limbah medis dalam
fase padat.Saat ini komposisi limbah medis ini terdiri
dari sisa jaringan tubuh manusia, pembalut hingga
jarum plastik dan pada masa mendatang diutamakan untuk
sisa jaringan manusia.
Tujuan dari penelitian ini adalah untuk
mempelajari kinerja incinerator medis, dengan cara
pengamatan di lapangan, di laboratorium terhadap
parameter masukan kadar air dan kadar karbon, serta
parameter keluaran bahan bakar tambahan dan konsentra-
si gas buang karbon monooksida.
Dari hasil penelitian diperoleh persamaan
regresi yang selanjutnya dapat dipergunakan untuk
membuat intrapolasi dan ekstrapolasi untuk mengetahui
persamaan yang menghubungkan antar berbagai parameter
masukan maupun parameter keluaran. Juga diperoleh
nilai koefisien Pearson yang menunjukkan hubungan
antar pameter. Penulis berusaha menyajikan sebaran da
ri data dan melakukan pengujian terhadap beberapa
hipotesa awal.
Analisa statistikal dilakukan terhadap data Lab
dan Lapangan. Hasil analisa dari faktor-faktor yang
mempengaruhi kinerja Incinerator Medis ini memperlihat
bahwa Kadar Air memiliki hubungan yang erat dengan
Pemakaian Solar, demikian juga Kadar Karbon memiliki
relasi erat dengan Pemakaian Solar.
Analisa regresi yang ailakukan terhadap hubungan
antar berbagai parameter memperlihatkan bahwa
persamaan regressi yang terbentuk adalah persamaan
logaritmis dan eksponensial.
Untuk mencari nilai yang minimum dari suatu
parameter keluaran tidak bisa dengan memakai
diffrensiasi. Cara yang dipakai adalah dengan
memasukkan kondisi batas minimum. dari parameter
masukan yang nilainya memungkinkan.

"
1996
S34592
UI - Skripsi Membership  Universitas Indonesia Library
cover
Atikha Nurhayati
"Adapun perencanaan tapak pada perumahan mencakup tata guna lahan, konsep perencanaan, prinsip pembagian kavling, dan perencanaan jalan. Dalam penelitian ini mengambil studi kasus Perumahan X di Bekasi yang akan dianalisa berdasarkan konsep pihak pengembang yaitu keleluasaan dan kelegaan. Hasil analisis deskriptif frekuensi menunjukkan bahwa konsep kelegaan yang diwujudkan oleh pihak pengembang adalah dalam bentuk penyediaan ruang terbuka beserta penghijauan dan fasilitas umum. Sedangkan konsep keleluasaan yang diwujudkan oleh pihak pengembang adalah dalam bentuk lebar jalan yang besar supaya keluar masuk di perumahan menjadi lancar. Efektifitas tapak perumahan dapat diukur dari peningkatan penjualan properti rata – rata per bulan dimana penjualan properti dari tahap I ke Tahap III mengalami kenaikan yang signifikan.

As for the residential site planning includes land use, planning concept, the principle ofdivision of lots, and street plans. In this research takes a case study in Bekasi Residential X will be analyzed based on the concept of developer freedom and relief The results of descriptive analysis of frequencies showed that the concept of relief that is realized by the developer is in the form of provision of open space and greenery and public facilities. While the concept of freedom embodied by the developer is in the form of a largewidth of the street and out of the housing in order to become fluent. Effectiveness can be measured tread of residential property sales increase in the average - average per month in which the sale of the property from Phase I to Phase III has increased significantly."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S57608
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>