Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 134830 dokumen yang sesuai dengan query
cover
Dewa Putu Ekam Perdana
"Dalam merancang suatu sistem pembangkit listrik di suatu wilayah, banyak faktor yang perlu dipertimbangkan, antara lain jenis pembangkit yang cocok digunakan di daerah tersebut dan biaya yang harus dikeluarkan. HOMER adalah perangkat lunak yang dapat digunakan untuk membantu optimasi dalam hal biaya ekonomi. Dari hasil simulasi didapatkan bahwa konfigurasi PLTH yang paling ekonomis adalah kombinasi yang terdiri atas PLTD berkapasitas 30 kW, PLTS berkapasitas 80 kW, battery storage dengan jumlah 280 buah (70 string @ 4 baterai), dan dengan converter berkapasitas 40 kW. PLTH ini memiliki nilai NPC sebesar $ 2.574.142 atau sekitar Rp 33,5 miliar dan nilai COE sebesar $ 0,497 atau Rp 6.461,00 per kWh.

When designing power plant system in one area, there are some factors to be considered, such as the most suitable type of power plant for that area and the cost for that power plant. HOMER is a software for optimization in economic cost. From the result of the simulation, the most economical hybrid power plant is the one that consist of 30 kW diesel power plant, 80 kW solar power plant, 280 battery storage (70 strings @ 4 battery), and 40 kW converter. This hybrid power plant has a NPC at $ 2.574.142 or about Rp 33,5 billion dan COE at $ 0,497 or Rp 6.461,00 per kWh."
Depok: Fakultas Teknik Universitas Indonesia, 2015
S60795
UI - Skripsi Membership  Universitas Indonesia Library
cover
Wike Handini
"Dari hasil simulasi diperoleh bahwa jaringan distribusi PLTH di Bengkunat memiliki panjang total 32.055 m, transformator yang dibutuhkan 8 buah dengan energi maksimum yang dipasok tiap transformator adalah 45,1 kWh per hari. Dibandingkan dengan PLTD 2 x 100 kW ($ 505.493), nilai NPC PLTH lebih tinggi ($ 555.956) demikian pula COE-nya ($ 0,770 per kWh) lebih tinggi dari COE PLTD ($ 0,739 per kWh). PLTH menghemat BBM 128.061 liter per tahun. PLTH layak untuk diterapkan di daerah dengan potensi angin dan radiasi matahari yang memadai seperti di Bengkunat Lampung Barat.
Perangkat lunak ViPOR hanya memasukkan data biaya transformator penurun tegangan di distribusi dengan satu kapasitas saja, sehingga jika ada konfigurasi beban yang membutuhkan kapasitas transformator berbeda, simulasi tidak dapat dilakukan. Optimasi dilakukan hanya berdasarkan biaya NPC, tidak dari segi jatuh tegangan pada jaringan, karena perangkat lunak ViPOR tidak memiliki keluaran berupa jatuh tegangan, rugi daya dan aliran daya pada jaringan.

From the ViPOR software simulation results, it has been found that the length of the distribution network of a hybrid power plant at Bengkunat is 32.055 m, it requires eight transformers each with an maximum energy requirement of 45.1 kWh per day. Compared to a 2 x 100 kW diesel power plant (NPC = $ 505.493), the NPC value of the hybrid power plant is higher ($ 555,956), also its COE ($ 0.770 per kWh) is higher than the diesel power plant ($ 0,739 per kWh). The hybrid power plant will save 128,061 liters of fuel per year. The hybrid power plant is feasible to be applied in areas with enough wind and sun radiation resources such as at Bengkunat West Lampung.
The ViPOR software has several shortcomings such as : only step down transformers can be used for simulation, and only with one capacity. For a load configuration that requires a different transformer capacity, the simulation can not be done. The optimization based on the NPC value, not based on the voltage drop at the network, because this software doesn?t have outputs of the voltage drop, power loss and power flow."
Depok: Fakultas Teknik Universitas Indonesia, 2010
T27523
UI - Tesis Open  Universitas Indonesia Library
cover
Wike Handini
"Dari hasil simulasi diperoleh bahwa jaringan distribusi PLTH di Bengkunat memiliki panjang total 32.055 m, transformator yang dibutuhkan 8 buah dengan energi maksimum yang dipasok tiap transformator adalah 45,1 kWh per hari. Dibandingkan dengan PLTD 2 x 100 kW ($ 505.493), nilai NPC PLTH lebih tinggi ($ 555.956) demikian pula COE-nya ($ 0,770 per kWh) lebih tinggi dari COE PLTD ($ 0,739 per kWh). PLTH menghemat BBM 128.061 liter per tahun. PLTH layak untuk diterapkan di daerah dengan potensi angin dan radiasi matahari yang memadai seperti di Bengkunat Lampung Barat. Perangkat lunak ViPOR hanya memasukkan data biaya transformator penurun tegangan di distribusi dengan satu kapasitas saja, sehingga jika ada konfigurasi beban yang membutuhkan kapasitas transformator berbeda, simulasi tidak dapat dilakukan. Optimasi dilakukan hanya berdasarkan biaya NPC, tidak dari segi jatuh tegangan pada jaringan, karena perangkat lunak ViPOR tidak memiliki keluaran berupa jatuh tegangan, rugi daya dan aliran daya pada jaringan.

From the ViPOR software simulation results, it has been found that the length of the distribution network of a hybrid power plant at Bengkunat is 32.055 m, it requires eight transformers each with an maximum energy requirement of 45.1 kWh per day. Compared to a 2 x 100 kW diesel power plant (NPC = $ 505.493), the NPC value of the hybrid power plant is higher ($ 555,956), also its COE ($ 0.770 per kWh) is higher than the diesel power plant ($ 0,739 per kWh). The hybrid power plant will save 128,061 liters of fuel per year. The hybrid power plant is feasible to be applied in areas with enough wind and sun radiation resources such as at Bengkunat West Lampung. The ViPOR software has several shortcomings such as : only step down transformers can be used for simulation, and only with one capacity. For a load configuration that requires a different transformer capacity, the simulation can not be done. The optimization based on the NPC value, not based on the voltage drop at the network, because this software doesn't have outputs of the voltage drop, power loss and power flow."
Depok: Fakultas Teknik Universitas Indonesia, 2010
T40877
UI - Tesis Open  Universitas Indonesia Library
cover
Mochamad Mardi Marta Dinata
"ABSTRAK
Luasnya wilayah, keadaan geografis dan tidak meratanya infrastruktur di menjadi
penyebab tingginya biaya operasional menara telekomunikasi, terutama untuk
energi. Teknologi hybrid energy system (HES) panel surya merupakan salah satu
alternatif sumber energi yang bisa digunakan oleh operator untuk menurunkan
biaya listrik pada site-site mereka yang berada pada area rural. Tesis ini bertujuan
untuk membangun model perhitungan untuk HES dengan panel surya sebagai
sumber energi utama pada site-site telekomunikasi di rural area agar mencapai cost
effective operation, meningkatkan reliability dan efisiensi, yang pada akhirnya
dapat menurunkan harga listrik/kWh (COE). Melihat kondisi industri saat ini,
efisiensi menjadi hal yang sangat penting bagi bagi operator telekomunikasi di
Indonesia. Pada penelitian tesis ini, terbukti bahwa HES dapat memberikan
efisiensi pengeluaran operasional sehingga berpengaruh pada penurunan harga
listrik/kWh sampai 67%.

ABSTRACT
The vast area, various geographical conditions and the uneven infrastructure
development in Indonesia are several reasons why the operational cost of
telecommunications sites are very high, especially the cost of electricity. Solar cell
hybrid energy system (HES) technology is one of the alternative energy resources
that can be used by operators to reduce their cost of electricity (COE) for sites in
rural areas. This thesis aims to establish the most effective HES calculation model
for rural sites to achieve operational costs efficiency, improve reliability and
efficiency and reduce COE. In telecommunication industry nowadays, efficiency
has become important factor for operators. The result show that HES can improve
the efficiency of operation expenditure in which COE can be reduced up to 67%."
2016
T45667
UI - Tesis Membership  Universitas Indonesia Library
cover
Adinda Prawitasari
"Indonesia merupakan negara kepulauan yang harus dapat mengoptimalkan sumber daya energi sehingga tercapai kemandirian dan ketahanan energi untuk pemerataan dan percepatan pembangunan perekonomian daerah yang jauh dari pusat kota atau disebut daerah 3T (Terdepan, Terpencil, Tertinggal). Peningkatan keandalan listrik untuk daerah 3T di Indonesia yang lebih ekonomis dapat dilakukan dengan optimasi sistem manajemen energi terbarukan dengan energi fosil yang sudah digunakan sebelumnya. Oleh karena itu dilakukan optimasi kedua sumber energi tersebut dengan tiga rancangan optimasi yaitu (1) PV-Baterai; (2) PV-Baterai-Generator Diesel 24 jam; (3) PV-Baterai-Generator Diesel 12 jam;. Sumber energi dari rancangan optimasi yang dilakukan tanpa terhubung ke jaringan utama dikarenakan daerah 3T yang tidak dapat akses dari jaringan utama. Simulasi menggunakan profil beban harian pada 7 daerah di Indonesia dengan hasil rancangan optimasi 1 memerlukan kapasitas PV dan baterai yang lebih besar dibandingkan rancangan optimasi lain dimana besar kapasitas PV juga mempengaruhi besar kapasitas baterai tetapi jka dalam sistem terdapat generator diesel hal tersebut tidak terpengaruhi dikarenakan adanya sumber energi lainnya. Jika dilihat dari pembiayaan seluruh sistem pada ketiga rancangan optimasi, sistem pembangkit hibrida untuk daerah 3T yang paling optimal adalah skema Optimasi 2, dimana pemanfaatan energi terbarukan diatas 90% dari seluruh sistem juga total biaya bersih saat ini pada sistem dan biaya pokok produksinya yaitu NPC dan COE yang paling rendah. Sistem pembangkit hibrida dapat meningkatkan keandalan sistem untuk menyediakan akses listrik 24 jam yang akan meningkatkan kualitas hidup masyarakat di daerah 3T

Indonesia is an archipelagic country that must be able to optimize energy resources so that energy independence and security for equitable distribution and acceleration of regional economic development that are far from the city center or called 3T areas (Front, Remote, Disadvantaged). The use of electricity for 3T areas in Indonesia which is more economical can be done by optimizing the renewable energy management system with pre-existing fossil energy. Therefore, the optimization of the two energy sources was carried out with three optimization designs, namely (1) PV-Battery; (2) PV-Battery-Diesel Generator 24 hours; (3) PV-Battery-Diesel Generator 12 hours;. The energy source of the optimization design is carried out without being connected to the main network because the 3T area cannot access from the main network. The simulation of the use of loads in 7 regions in Indonesia with the results of daily design optimization 1 requires a larger PV and battery capacity than other optimization designs where the large PV capacity also affects the battery capacity but if in the system there is a diesel generator it is not affected because of the source other energy. When viewed from the financing of the entire system in the three optimization designs, the most optimal hybrid power generation system for the 3T area is the Optimization 2 scheme, where the use of renewable energy is above 90% of the entire system as well as the current total net cost of the system and its basic production costs, namely NPC and lowest COE. The hybrid generation system can improve the system to provide 24-hour electricity access which will improve the quality of life of the people in the 3T area."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Munthe, Jeriko Hasian
"Indonesia merupakan salah satu negara kepulauan terbesar di dunia, sehingga memiliki tantangan yang signifikan dalam menyediakan energi berkelanjutan, terutama di wilayah 3T (terdepan, terluar, tertinggal) yang masih bergantung pada Pembangkit Listrik Tenaga Diesel (PLTD). Ketergantungan ini meningkatkan emisi karbon, yang bertentangan dengan target Net Zero Emission (NZE) pada tahun 2060. Salah satu solusi potensial adalah penerapan sistem Pembangkit Listrik Tenaga Hibrid (PLT-Hibrid), yang mengintegrasikan Pembangkit Listrik Tenaga Surya (PLTS) dan Battery Energy Storage System (BESS). Sistem PLT-Hibrid dirancang untuk mengurangi penggunaan diesel dengan memanfaatkan energi terbarukan secara optimal. Penelitian ini bertujuan untuk mengoptimalkan kapasitas PLTS dan BESS dalam meningkatkan penetrasi energi terbarukan serta mengefisiensikan Biaya Pokok Penyediaan (BPP) PLTD dengan prioritas BPP PLTS dan BESS dengan nilai yang tak jauh berbeda. Program optimasi berbasis MATLAB dikembangkan sebagai alternatif perangkat lunak HOMER untuk membantu menentukan kapasitas PLTS dan BESS yang optimal sesuai target keekonomian, nilai Renewable Energy Fraction (REF) yang optimal, serta keekonomian seluruh sistem. Penelitian dilakukan dengan 6 lokasi berbeda di Indonesia. Program yang dikembangkan tervalidasi memiliki tingkat akurasi tinggi dengan error validasi 0.02%-0.35%, sehingga program dapat diimplementasikan ke optimalisasi. Hasil penelitian menunjukkan bahwa REF optimal bervariasi antara 44.931% hingga 85.671%, dengan BPP hibrid mencapai rentang 0.296 USD/kWh hingga 0.426 USD/kWh. Penelitian ini membuktikan bahwa sistem PLT-Hibrid tidak hanya menekan biaya energi tetapi juga mendukung transisi energi bersih yang berkelanjutan, khususnya di wilayah terpencil Indonesia.

Indonesia is one of the largest archipelagic countries in the world, facing significant challenges in providing sustainable energy, particularly in 3T (frontier, outermost, and underdeveloped) regions that still rely heavily on Diesel Power Plants (PLTD). This dependency increases carbon emissions, which contradict Indonesia's target of achieving Net Zero Emissions (NZE) by 2060. One potential solution is the implementation of a Hybrid Power Plant (PLT-Hybrid) system, which integrates Solar Power Plants (PLTS) and Battery Energy Storage Systems (BESS). The PLT-Hybrid system is designed to reduce diesel consumption by optimizing the use of renewable energy. This research aims to optimize PLTS and BESS capacities to enhance renewable energy penetration and reduce the Cost of Electricity Production (BPP) of PLTD, prioritizing PLTS and BESS BPP values that are economically competitive. A MATLAB-based optimization program was developed as an alternative to HOMER software to determine the optimal PLTS and BESS capacities, the optimal Renewable Energy Fraction (REF), and the overall system's economic performance. The study was conducted across six different locations in Indonesia. The developed program was validated to have a high accuracy level with a validation error of 0.02%-0.35%, ensuring its feasibility for optimization applications. The results showed that the optimal REF ranged from 44.931% to 85.671%, with hybrid BPP values between 0.296 USD/kWh and 0.426 USD/kWh. This research demonstrates that the PLT-Hybrid system not only reduces energy costs but also supports the transition to sustainable clean energy, particularly in remote regions of Indonesia. "
Depok: Fakultas Teknik Universitas Indonesia, 2025
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sidiq Almubarak
"Energi listrik merupakan salah satu faktor penting untuk mengembangakan potensi yang terdapat pada suatu daerah tak terkecuali potensi yang ada pada Pulau Binongko. Pembangkit Listrik Tenaga Surya akan di integrasikan dengan sistem PLTD milik PLN yang berada di Pulau Binongko dan disimulasikan dengan perangkat lunak HOMER. Penelitian dilakukan untuk menentukan sistem yang paling optimal dengan melihat Net Present Cost (NPC) dan Cost of Energy (CoE) dengan cara membandingkan dua strategi pengontrolan yaitu Load Following (LF) dan Cycle Charging (CC). Hasil dari simulasi ini menunjukkan bahwa di pulau Binongko sistem yang paling optimal adalah Load Following (LF) dengan nilai NPC dan CoE sistem sebesar $10.403.580 dan $0.143, dimana jika dibandingkan dengan strategi pengontrolan CC nilai dari NPC dan CoE nya cenderung lebih besar dibanding LF. Adapun kapasitas PLTS di Pulau Binongko mencapai 2.362 kW serta mampu memproduksi energi listrik sebanyak 4.045.095 kWh dalam satu tahun. Modal yang dibutuhkan untuk membangun sistem PLTS tersebut yaitu Rp 51.557.015.755,414. Pada PLTS, sistem pembangkitan elektriknya memerlukan biaya investasi yang sangat besar di awal. Jumlah modul PV yang dibutuhkan sistem yaitu sebanyak 7.870 modul PV dengan modul PV yang digunakan jenis kristalin dengan daya 300 Wp dan tegangan 36.2 V, serta lahan yang dibutuhkan untuk modul PV ini yaitu seluas 1.5271 Ha.

Electrical energy is one of the important factors to develop the potential that exists in an area, including the potential that exists on Binongko Island. The Solar Power Plant will be integrated with PLN's PLTD system on Binongko Island and simulated with HOMER software. The study was conducted to determine the most optimal system by looking at the Net Present Cost (NPC) and Cost of Energy (CoE) by comparing two control strategies, namely Load Following (LF) and Cycle Charging (CC). The results of this simulation show that on Binongko Island the most optimal system is Load Following (LF) with system NPC and CoE values of $10,403,580 and $0.143, when compared to the CC control strategy, the values of NPC and CoE tend to be greater than LF. The PLTS capacity on Binongko Island reaches 2,362 kW and is capable of producing 4,045,095 kWh of electrical energy in one year. The capital needed to build the PLTS system is Rp. 51,557,015,755,414. In PLTS, the electricity generation system requires a very large initial investment cost. The number of PV modules required by the system is 7,870 PV modules with crystalline PV modules used with a power of 300 Wp and a voltage of 36.2 V, and the land required for this PV module is 1,5271 Ha."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rhaditia Kurnia Asyuri
"Indonesia merupakan negara dengan iklim tropis dan memiliki puluhan ribu pulau. Salah satu tantangannya adalah negara kepulauan umumnya memiliki sumber daya lokal yang terbatas dan biaya impor energi yang tinggi. Teknologi energi terbarukan di sebagian besar pulau seringkali tidak beroperasi dan tidak berlanjut karena banyaknya masalah yang terlibat, salah satunya adalah ketidakjelasan pengelolaan dan aset dari pembangkit listrik. Penelitian ini bertujuan untuk menjelaskan faktor-faktor apa saja yang mempengaruhi keberlanjutan energi terbarukan dalam memasok listrik kepada masyarakat dalam jangka panjang dan akan memaparkan keterkaitan antara kesejahteraan masyarakat dengan hadirnya teknologi energi terbarukan. Metode yang digunakan adalah wawancara mendalam dan kuesioner dengan skala likert. Penelitian dilakukan di dua pulau, yakni pulau Mecan dan pulau Sabira. Data yang diperoleh disimulasikan dalam bentuk System Dynamics, salah satu langkah dari systems thinking, dengan menggunakan alat bantu Powersim. Hasil penelitian menunjukkan bahwa PLTS mampu dikelola sepenuhnya oleh masyarakat sampai dengan keberlanjutan biaya Operation & Maintenance dari pembangkit, meskipun biaya replacement cost dari powerplant tetap dibutuhkan bantuan dari pemerintah dan kementerian. Sedangkan hasil di pulau Sabira, meskipun pembangkit listrik masih beroperasi, insentif dan subsidi pemerintah menjadi ketergantungan yang kuat bagi masyarakat agar ketersediaan listrik selalu terjaga.

Indonesia is a country with a tropical climate and has tens of thousands of islands. One of the challenges is that archipelagic countries generally have limited local resources and high energy import costs. Renewable energy technologies in most islands are often not running and are unsustainable due to the many problems involved, one of which is the lack of information on management and generating assets. This research aims to explain what factors affect the sustainability of renewable energy in supplying electricity to the community in the long term and will present the interrelation between the local people’s welfare and the presence of renewable energy technology. The method used is an in-depth interview and questionnaire with a Likert scale. The research was conducted on two islands, namely Mecan Island and Sabira Island. The data obtained is simulated in the form of System Dynamics, one of the methods of systems thinking, by using the Powersim software tools. The results show that the Solar Power Plant can be fully managed by the local community and is also related to the Operation & Maintenance costs of the power plant, although the replacement cost of the power plant still requires assistance from the government and the ministry. While the results on Sabira Island, although the power plant is still operating, government incentives and subsidies become a heavy dependence for the people, so that the availability of electricity access is always maintained."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Luluk Anjar Rahmawati
"Penelitian ini bertujuan untuk memberikan informasi dan metodologi yang berfungsi untuk menurunkan biaya listrik pada sektor industri yang sebelumnya menggunakan fosil sebagai bahan bakar listrik berganti dengan memanfaatkan energi terbarukan dengan menggunakan aplikasi Homer. Penelitian ini menggunakan fotovoltaik yang dipasang pada atap sebuah industri di Bekasi, Indonesia, sebagai manajemen waktu beban puncak industri. Supaya didapatkan harga terendah dengan sistem terbaik maka digunakan beberapa skenario yang menggunakan perbandingan guna memperoleh hasil yang paling sesuai dan berguna bagi industri ini. Skenario pertama diimplementasikan hanya dengan jaringan listrik PLN tanpa fotovoltaik, atau PV. Skenario kedua menerapkan PV yang dipasang dan bekerja pada saat WBP (waktu beban puncak) industri dengan BESS (Battery Energy Storage System), dan selebihnya dilakukan oleh jaringan listrik PLN dengan PV pada waktu beban puncak industri. Yang ketiga adalah skenario dengan PV dan koneksi jaringan listrik PLN dengan belanja modal (harga material) yang rendah, namun sesuai dengan kebutuhan. Dengan ketiga jenis skenario di atas maka digunakan perbandingan LCOE, NPV dan IRR sebagai acuan dari ketiga skenario dan diperoleh skenario ketiga yang memenuhi industri ini. Hal ini dibuktikan dengan hasil secara ekonomi yaitu, terdapat penurunan tarif harian menjadi sebesar $0,0817/kWh, IRR 7,6%, NPV $15,5M dan payback period 10 tahun

This research aims to provide information and methodology that functions to reduce electricity costs in the industrial sector which previously used fossil fuel as electricity fuel by using renewable energy using the Homer application. This research uses photovoltaics installed on the roof of an industry in Bekasi, Indonesia, as time management for industrial peak loads. So that obtain the lowest price with the best system, several scenarios are used that use comparisons to obtain the most appropriate and useful results for this industry. The first scenario is implemented only with the PLN power grid without photovoltaics, or PV. The second scenario applies PV installed and working during industrial WBP (peak load times) with BESS (Battery Energy Storage System), and the rest is carried out by the PLN electricity network with PV at industrial peak load times. The third is a scenario with PV and PLN electricity grid connection with low capital expenditure (material prices) but in compliance with needs. With the three types of scenarios above, a comparison of LCOE, NPV and IRR is used as a reference for the three scenarios and a third scenario is obtained that meets this industry. This is proven by economic results, namely, there is a decrease in daily tariffs to $0,0817/kWh, IRR 7,6%, NPV $15,5M and pay back period 10 years."
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Rhafi Mahatvayodha Soedjono
"Seiring dengan peningkatan signifikan kebutuhan energi listrik dan komitmen Indonesia menuju target Net Zero Emissions (NZE) pada tahun 2060, diperlukan inovasi pada sistem kelistrikan di tingkat pengguna akhir. Penelitian ini bertujuan untuk menganalisis kelayakan teknis dan efisiensi penerapan sistem rumah hibrid AC/DC sebagai solusi potensial. Arsitektur rumah hibrid yang mengintegrasikan jaringan listrik AC konvensional dengan bus DC lokal dari Pembangkit Listrik Tenaga Surya (PLTS) dan sistem penyimpanan baterai dimodelkan dan disimulasikan menggunakan perangkat lunak Simulink. Analisis dilakukan terhadap berbagai golongan tarif pelanggan PLN, mulai dari 450 VA hingga 6600 VA, dengan lima skenario perbandingan beban AC/DC yang berbeda. Hasil simulasi menunjukkan bahwa arsitektur hibrid secara teknis layak dan mampu meningkatkan efisiensi energi dengan mengurangi rugi-rugi daya akibat konversi berulang. Efisiensi sistem tertinggi secara umum dicapai pada golongan tarif 900 VA dengan rata-rata 90,24%, dan pada konfigurasi perbandingan beban 75% AC – 25% DC dengan rata-rata 86,81%. Penelitian ini menyimpulkan bahwa rumah hibrid AC/DC merupakan solusi yang relevan dan selaras dengan arah kebijakan energi nasional, terutama pasca-pemberlakuan Permen ESDM No. 2 Tahun 2024 yang mendorong optimalisasi konsumsi mandiri.

Along with the significant increase in electricity demand and Indonesia's commitment to the Net Zero Emissions (NZE) target by 2060, innovation in the electrical system at the end-user level is necessary. This research aims to analyze the technical feasibility and efficiency of implementing an AC/DC hybrid house system as a potential solution. The hybrid house architecture, which integrates the conventional AC grid with a local DC bus powered by a Solar Photovoltaic (PV) system and battery storage, was modeled and simulated using Simulink software. The analysis was conducted across various PLN customer tariff groups, from 450 VA to 6600 VA, under five different AC/DC load ratio scenarios. The simulation results indicate that the hybrid architecture is technically feasible and capable of improving energy efficiency by reducing power losses from repeated conversions. The highest system efficiency was generally achieved in the 900 VA tariff group, with an average of 90.24%, and in the 75% AC – 25% DC load ratio configuration, with an average of 86.81%. This study concludes that the AC/DC hybrid house is a relevant solution aligned with national energy policy, particularly following the enactment of Minister of Energy and Mineral Resources Regulation No. 2 of 2024, which encourages the optimization of self-consumption."
Depok: Fakultas Teknik Universitas Indonesia, 2025
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>