Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 179209 dokumen yang sesuai dengan query
cover
Patricia Prima Kirana
"ABSTRAK
Laporan magang ini membahas mengenai siklus pembelian Material di suatuperusahaan konstruksi dengan menggunakan salah satu fasilitas kredit non-tunai dariBank. Secara lebih rinci, laporan ini membahas mengenai prosedur pengadaan materialdi PT HKA, dan pembayaran material tersebut menggunakan fasilitas kredit non-tunaiyaitu Surat Kredit Berdokumen Dalam Negeri. Prosedur pengadaan material ini akandiuji kesesuaiannya dengan peraturan dari Menteri BUMN. Surat Kredit Berdokumendalam Negeri yang digunakan oleh PT HKA dibagi menjadi dua jenis yaitu SuratKredit Berdokumen Dalam Negeri Reguler dan Kontrak Payung. Di dalam laporanmagang ini akan dijelaskan tahapan masing-masing jenis SKBDN tersebut sehinggadapat diketahui perbedaan antar jenisnya dan bagaimana manfaatnya terhadap PTHKA. Secara keseluruhan, siklus pembelian barang yang mencakup pengadaan barangdan pembayaran menggunakan fasilitas SKBDN telah berjalan dengan baik dan tidakada kendala yang material.

ABSTRACT
This report explains about the procurement cycle of material in a constructioncompany using one of the non cash loan facility provided by commercial Bank. Inmore detail, this report explains about procurement cycle of material, and the paymentusing non cash loan facility, domestic letter of credit. The compliance of procurementcycle in PT HKA towards State Minister for State Owned Enterprises decree checkedin this report. Domestic letter of credit used by PT HKA classified into two type, whichis reguler domestic letter of credit and framework contract domestic letter of credit.The differences such as the function, and the stages between reguler domestic letter ofcredit and framework contract domestic letter of credit will be explained in this report.Overall, the procurement cycle of material including purchasing of material andpayment of material using domestic letter of credit facility can be categorized as goodand there are no material problem happened.
"
2017
TA-Pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Fitri Oktavia Nugroho
"Pelaksanaan proyek konstruksi EPC yang dikelola oleh perusahaan jasa konstruksi tidak hanya mempertimbangkan aspek teknis seperti biaya, waktu, dan ruang lingkup tetapi juga aspek manajemen proyek yang berkaitan dengan kematangan internal perusahaan dalam mengelola proyek. Seiring dengan perkembangan teori dalam bisnis konstruksi, terdapat pertimbangan aspek lainnya yaitu aspek sustainability.
Penerapan praktik sustainability dalam pelaksanaan proyek EPC menjadi tantangan bagi perusahaan mengingat aktivitas proyek dapat mempengaruhi lingkungan dalam kurun waktu jangka panjang dan menghasilkan limbah dalam jumlah besar. Oleh sebab itu, perusahaan berupaya menerapkan praktik ini pada aktivitas proyek yang berfokus pada tiga aspek yaitu aspek ekonomi, lingkungan, dan sosial. Penelitian ini bertujuan untuk memberikan rekomendasi praktik sustainability pada studi kasus proyek yang dikemukakan yaitu proyek EPC Sumpal Compression.
Hasil penelitian dengan menggunakan metode Distance to Ideal Maturity Level (DIML) dan Importance Performance Analysis (IPA) menunjukkan bahwa proyek ini sudah mencapai level kematangan ketiga dengan lima dari 20 subfaktor penilaian perlu dilakukan perbaikan agar ketercapaian level kematangan proyek meningkat jelang batas akhir kontrak pelaksanaan proyek tersebut.

The execution of EPC construction project which is managed by the construction services company is not only consider technical aspects such as cost, time, and scope but also aspects of project management related to the maturity of corporate internal in managing the project. Along with the development of theory in construction business, there is other consideration aspects in the execution of EPC construction project i.e aspects of sustainability.
The application of sustainability practices in this execution becomes a challenge for the company because the project activities can affect the environment in the long term and produce large amounts of waste. Therefore, the company strived to apply these practices into the project activities focus on three aspects, namely economic aspects, environmental, and social. This paper aims to provide recommendations on sustainability practices in case studies that addressed to EPC Sumpal Compression project.
The results of this paper using the method of Distance to Ideal Maturity Level (DIML) and Importance Performance Analysis (IPA) shows that the project has achieved the third level of project maturity with five out of the 20 indicators assessment need to improve in order to increase the achievement of project maturity level by the end of this contract.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
S63918
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Nizam Khadid
"Pada era globalisasi seperti saat ini, perkembangan konstruksi semakin pesat. Sehingga mendorong para pelaku konstruksi mempertimbangkan aspek-aspek yang mempengaruhi konstruksi seperti manajemen proyek. Manajemen proyek yang baik mencerminkan keadaan internal yang baik dari suatu perusahaan konstruksi . Selain itu, perkembangan konstruksi saat ini juga berakibat pada dampak terhadap lingkungan yang ditimbulkan dari aktivitas proyek. Sehingga saat ini penerapan praktik sustainability dalam perusahaan konstruksi menjadi sebuah tanggung jawab bagi setiap perusahaan konstruksi. Penelitian ini dilakukan untuk mengukur level kematangan dari proyek dengan pendekatan Sustainable Construction pada proyek konstruksi pembangunan Gedung Training Center Camp Al-Azhar dengan tujuan memberikan rekomendasi praktik sustainability dengan harapan dapat meningkatkan level performa proyek. Metode yang digunakan dalam penelitian ini adalah Distance to Ideal Maturity Level (DIML) untuk mengetahui level kematangan berbasis sustainable construction proyek dan Importance Performance Analysis (IPA) untuk mengidentifikasi variabel-variabel berdasarkan tingkat performa dan juga tingkat kepentingan. Hasil dari penelitian ini menunjukan tingkat kematangan pada proyek pembangunan Gedung Training Center Camp Al-Azhar yang Dilakukan PT. Berkah Gemilang berada di level 4 (Sustainable). Dan dari 20 faktor terdapat 3 faktor yang memiliki tingkat kepentingan tinggi dengan performa yang rendah.

In current globalization era, the development of construction is growing rapidly. Thus encouraging construction actors to consider the aspects of influence construction such as project management. Good project management reflected the good internal condition of a construction company. In addition, the current development of construction has also an impact on the environment caused by project activities. So the implementation of sustainability practices in construction companies to be a responsibility for every construction company. This research was conducted to measure the level maturity of a project with the Sustainable Construction approach in the Al-Azhar Training Center Camp Building construction project with the aim of providing recommendations on sustainability practices in the hope of increasing the level of project performance. The method used in this study are Distance to Ideal Maturity Level (DIML) to determine the level of maturity based on sustainable construction projects and Importance Performance Analysis (IPA) to identify variables based on performance levels and the level of importance. The results of this study indicate the level of maturity in the Al-Azhar Training Center Camp Building construction project conducted by PT. Berkah Gemilang is at level 4 (Sustainable). And from 20 factors, there are 3 factors that have a high level of importance with low performance."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Zakir
"Manajemen Proyek konstruksi yang dilaksanakan oleh Divisi Konstruksi meliputi pembangunan Pembangkit, Transmisi dan Gardu Induk. Pada Divisi Konstruksi Jawa Bagian Timur, Madura dan Bali bidang konstruksi jaringan memelakukan fungsi pembinaan, pengawasan dan pengendalian kontrak konstruksi transmisi dan gardu induk. Industri konstruksi di Indonesia tidak luput dari dampak pandemi Covid-19 di Indonesia termasuk proyek jaringan ketenagalistrikan PT PLN (Persero). Pandemi Covid-19 menyebabkan timbulnya kebijakan dari pemerintah dalam hal ini Gubernur, Bupati dan walikota untuk mencegah penyebaran covid-19 melalui Pembatasan Sosial Berskala Besar (PSBB).  Meskipun sektor konstruksi merupakan tempat kerja/kantor yang masuk dalam kategori yang dikecualikan namun PSBB memberikan dampak terhadap pembatasan interaksi kegiatan kerja pada proyek konstruksi di PT PLN (Persero). Hal tersebut akan menyebabkan terganggunya waktu penyelesaian pekerjaan karena sumber daya proyek (man, material, machines) yang dibatasi. Pemberlakuan PSBB sebagai akibat dampak pandemi Covid-19 menyebabkan terganggunya penyelesaian pekerjaan Konstruksi Proyek Jaringan Ketenagalistrikan PT PLN (Persero) dan  menyimpan potensi permasalahan dari sisi kontrak konstruksi yaitu berupa pengajuan klaim dari penyedia jasa berupa delay waktu pekerjaan, dan tambahan biaya. Mekanisme penanganan kontrak akibat dampak pandemi Covid-19 merujuk kepada ketentuan kontrak dan peraturan pengadaan barang dan jasa PT PLN (Persero). Penyelesaian klaim atas perubahan jadwal pelaksanaan pekerjaan dapat diberikan perpanjangan waktu pelaksanaan dengan melihat penyebab keterlambatan yaitu keterlambatan yang disebabkan oleh penyedia jasa dan keadaan yang terjadi diluar kehendak para pihak (keadaan kahar). Keterlambatan dari sisi pengguna jasa jika adanya larang perjalanan/pembatasan supervisi konstruksi sehubungan dengan peraturan internal PT PLN (Persero) dan  Keterlambatan disebabkan keadaan kahar diberlakukan pada kondisi PSBB sebagai akibat dampak pandemi Covid-19. Pengajuan klaim tambahan biaya sehubungan dampak pandemi Covid-19 menurut pengadaan barang dan jasa PT PLN (Persero) diselesikan secara ketentuan kontrak melalui negosiasi musyawarah mufakat, namun jika mempertimbangkan ketentuan FIDIC atas dampak Covid-19 sebagai keadaan kahar maka hanya dapat diberikan kompensasi perpanjangan waktu tanpa kompensasi. Potensi sengketa kontrak dapat muncul apabila kedua bela pihak tidak sepakat terhadap tambahan biaya yang ditimbulkan sehingga sesuai kontrak diselesaikan melalui jalur arbitrase.

Construction Project Management carried out by the Construction Division includes the construction of Power Plants, Transmission and Substation. In the East Java, Madura and Bali Construction Division, the network construction sector carries out the functions of guidance, supervision and control of transmission and substation construction contracts. The construction industry in Indonesia has not escaped the impact of the Covid-19 pandemic in Indonesia, including the Electrical Power Transmission Line Project of PT PLN (Persero). The Covid-19 pandemic led to the emergence of policies from the government in this case the Governor, Regent and mayor to prevent the spread of Covid-19 through Large-Scale Social Restrictions (PSBB). Although the construction sector is a workplace/office that is included in the exempt category, PSBB has an impact on limiting the interaction of work activities on construction projects at PT PLN (Persero). This will disrupt the completion time of work because of limited project resources (man, material, machines). The implementation of the PSBB as a result of the impact of the Covid-19 pandemic caused disruption in the completion the Electrical Power Transmission Line Project of PT PLN (Persero) and saved potential problems from the construction contract side, namely in the form of submitting claims from service providers in the form of work time delays and additional costs. The contract handling mechanism due to the impact of the Covid-19 pandemic refers to the contract provisions and regulations for the procurement of goods and services of PT PLN (Persero). Settlement of claims for changes to the schedule of work implementation can be given an extension of the implementation time by looking at the causes of delays, namely delays caused by service providers and conditions that occur outside the will of the parties (force majeure). Delays from the service user side if there is a travel ban/construction supervision restrictions in connection with the internal regulations of PT PLN (Persero) and the delay is due to force majeure imposed on PSBB conditions as a result of the impact of the Covid-19 pandemic. Submission of additional cost claims in connection with the impact of the Covid-19 pandemic according to the procurement of goods and services of PT PLN (Persero) is completed under contract terms through negotiation of consensus, but if you consider the FIDIC provisions for the impact of Covid-19 as a force majeure, compensation for extended time can only be given compensation. The potential for contract disputes can arise if the two parties do not agree on the additional costs incurred so that according to the contract it is resolved through arbitration. "
Depok: Fakultas Teknik Universitas Indonesia, 2021
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Medi Triyantono
"Tingginya waste dan rendahnya value-addedpada industri konstruksi yang telah terjadi selama ini memberikan indikasi bahwa dibutuhkan solusi baruyang tepat untuk menjawab permasalahan tersebut. Seiring dengan terjadinya peningkatan waktu dalam penyelesaian proyek yang terjadi pada PT XYZ dan mengakibatkan kegagalan proyek dalam mencapai target yang telah ditentukan, maka diperlukan adanya tindakan penyelesaian permasalahan yang efektif. Penelitian dilakukan untuk mengidentifikasi dan menganalisis faktor-faktor dominan penyebab pemborosan waktu pada rangkaian proses Engineering-Procurement-Construction (EPC) di PT XYZ. Identifikasi faktor-faktor dilakukan melalui studi literatur terkait konsep lean construction dan struktur Lean Project Delivery System (LPDS) yang dilanjutkan dengan analisis statistik (dengan alat bantu Software SPSS 22), analisis deskriptif, pemetaan matriks, dan Analytical Hierarchy Process (AHP) menggunakan software Super Decisionsuntuk menentukan pembobotan kriteria. Pengelolaan faktor-faktor dominan diperoleh melalui wawancara dengan narasumber untuk mengetahui penyebab utama, tindakan perbaikan dan tindakan pencegahan untuk setiap faktor dominan sesuai dengan urutan prioritas. Penelitian ini menghasilkan urutan prioritas 5 faktor dominan yang muncul di setiap fase LPDS, dan dilengkapi dengan tindakan-tindakan pengelolaannya, baik dalam hal komunikasi internal, kontrol kualitas, standar prosedur, proses survei di lapangan, maupun komunikasi dan keterbukaan informasi dengan pihak pemilik proyek.

High waste and low value-added in the construction industry gives an indication that the new solutions are required to address these issues. Along with the increase of time to complete the projects in the PT XYZ that lead to failure in achieving the set targets, it is necessary to haveeffective solution of the issue. This study is conducted to identify and analyze the dominant factors that cause waste of time on a series of processes of Engineering-Procurement-Construction (EPC) in PT XYZ. Identification of factors is done through the study of literature related to the concept of lean construction and structure of Lean System Delivery Project (LPDS), followed by statistical analysis (SPSS 22 software), descriptive analysis, matrix mapping, and the Analytical Hierarchy Process (AHP) using the Super Decisions software to determine weighting of criteria. The solutions to manage dominant factors is obtained through interviews to find out the main cause, corrective action and preventive action for each of the dominant factors in order of priority. This research resulted in the order of priorityof the 5 dominant factor that appears in every phase of LPDS, complete with management actions, both in terms of internal communication, quality control, standard of procedures, the process of the survey in the field, as well as communication and disclosure of information by the project owner."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2015
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Levy, Sidney M.
New York: McGraw-Hill, 2012
658.404 LEV p
Buku Teks SO  Universitas Indonesia Library
cover
Nunu Nuramanu
"Pelaksanaan proyek konstruksi yang terdiri atas pekerjaan Engineering, Procurement, Construction dan Manajemen Proyek, dilaksanakan dengan melibatkan banyak pihak dan menggunakan berbagai sumber daya serta menghadapi berbagai masalah ketidakpastian dan risiko, yang bila terjadi akan memberikan dampak terhadap kinerja proyek, terutama terhadap kinerja waktu. Proyek pembangunan untuk fasilitas lepas pantai merupakan suatu proyek yang sangat sensitif terhadap waktu, dimana semua faktor risiko harus termitigasi dengan baik untuk menghindari keterlambatan penyelesaian, bahkan mencari potensi percepatan dengan mengusahakan semaksimal mungkin. Penentuan faktor risiko dominan baik negatif yang berimpak pada keterlambatan, maupun faktor positif yang berimpak pada percepatan, merupakan suatu tantangan yang signifikan, terutama dalam konteks penelitian ini, proyek dilakukan pada fasilitas yang masih berproduksi aktif di lokasi lepas pantai yang cukup jauh (90-150 km) dari daratan (shore base), kedalaman laut (80-100 meter) dan tinggi gelombang di Laut Cina Selatan. Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor risiko dominan yang mempengaruhi kinerja waktu proyek pembangunan migas lepas pantai di Indonesia, dari sisi owner. Proses di dalam manajemen risiko proyek yaitu mengidentifikasi faktor-faktor risiko, analisis risiko, evaluasi risiko, dan tindakan mengelola risiko, dikembangkan dalam penelitian ini dalam rangka upaya mencapai tujuan. Identifikasi faktorfaktor risiko (hipotesis) disusun dari literatur-literatur relevan, yang kemudian dipilah melalui validasi pakar. Selanjutnya faktor-faktor risiko terpilah ini diteliti melalui pengambilan data secara survei-kuesioner dengan responden para manajer proyek, dan tim inti yang memiliki pengalaman dalam proyek EPC migas lepas pantai. Responden-responden ini dianalisis kehomogenannya untuk mendapatkan pembacaan yang valid melalui tes 2 Sampel Bebas (Mann-Whitney U) dan K-Sampel Bebas (Kruskal-Wallis H) dengan program SPSS. Pada awal proses analisis data, dilakukan uji validitas dan reliabilitas dengan SPSS untuk memastikan apakah data yang diambil valid dan dapat dipercaya. Selanjutnya data diolah dengan standar AS/NZ 4360 untuk mendapatkan prioritas faktor risiko. Kemudian dilakukan evaluasi tes korelasi nonparametris Kendall-Tau untuk mengetahui hubungan antara variabel risiko dan dampaknya terhadap kinerja waktu. Di tahap akhir, dilakukan validasi pakar kembali terkait tindakan mengelola risiko, yaitu tindakan preventif dan korektif bila faktor-faktor dominan ini terjadi di masa depan.

The process of construction projects which handles Engineering, Procurement, Construction and Project Management are being held by a lot of personnel and departments, where complex problems, uncertainty, risks are mostly occur, and if happened will impact to work performance specially to timeline. Construction projects for offshore facilities are very vulnerable in matter of time, where every risk must be well mitigated to prevent delay, even targeting acceleration opportunities in maximum effort is a must. Defining dominant risk factors, both negative that effecting project delay and positive that giving acceleration is very challenging, specially based on the context of this research, where the construction is held in live facility located on offshore (90-150 km from shore base), with sea depth of 80-100 metres and the high wave of South China sea. The objective of this research is to point out dominant risk factors which effecting time performance of oil and gas offshore construction projects in Indonesia, from owner side. Steps in risk management project which are identifying risk factors, risk analysis, risk evaluation and risk response planning are developed in this research to gain the objective. Identification of risk factors (hypothesis) are arrayed from relevant literatures, and then are sorted by expert validation. Next, these will be examined through collecting data by survey-questionnaire of project manager and project core team respondents who are well experienced in offshore oil and gas EPC projects. The homogeneity of respondents needs to be checked to get valid reading through 2 Free Samples (Mann-Whitney U) and KFree Samples (Kruskal-Wallis H) tests with SPSS program. In the first step of data analysis, validity and reliability tests are conducted to guarantee that the data are valid and trusted. Then, they will be analyzed by AS/NZ 4360 standard to gain risk factors priority. Next, the data are evaluated by Kendall-Tau nonparametric correlation test for determining relation between risks and their effect to time performance. In the end, continued to another expert validation related to risks management, to identify preventive and corrective actions for assurance in future."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Yunan Hanun
Depok: UI Publishing, 2019
658.404 YUN m
Buku Teks  Universitas Indonesia Library
cover
Batara
"Dalam proses pelelangan, tahap penawaran merupakan tahap yang sangat penting. Melalui tahap ini maka pihak penawar atau kontraktor harus saling bersaing dan beradu strategi untuk mendapatkan suatu proyek. Penawaran yang diajukan haruslah optimum artinya cukup tinggi untuk mendapatkan keuntungan dan cukup rendah untuk memenangkan tender proyek. Strategi penawaran berperan dalam membuat keputusan yang kompetitif, dimana di dunia konstruksi tekanan kompetisi untuk mendapatkan sebuah proyek lebih tinggi dibandingkan dengan bidang lain. Dalam strategi penawaran, umumnya terdapat 3 kategori utama, yaitu: 1. Model berdasarkan teori probabilitas untuk memaksimalkan keuntungan; 2. Model berdasarkan decision support systems untuk menghitung berbagai aspek dalam keputusan penawaran; 3. Model terbaru berdasarkan artificial inteligence techniques untuk mempertimbangkan problem pengambilan keputusan yang tidak terstruktur. Salah satu komponen penawaran adalah biaya. Analisa komponen biaya mengkategorikan biaya sebagai biaya modal tetap dan biaya modal kerja. Biaya modal tetap terdiri dari biaya langsung dan biaya tidak langsung. Tiap kontraktor memiliki prosentase perbandingan yang berbeda antara biaya langsung dengan biaya tidak langsung. Hal ini disebabkan oleh perbedaan strategi penawaran tiap kontraktor. Perbedaan inilah yang akan disimulasikan dengan simulasi Monte Carlo untuk mengetahui penawaran yang paling optimum untuk suatu proyek yang dalam hal ini merupakan proyek dalam pelelangan yang diikuti oleh PT. A. Proses analisa strategi penawaran dilakukan dengan menggunakan analisa statistik, yaitu analisa regresi, dan diteruskan dengan simulasi Monte Carlo untuk analisa probabilitas mark up optimum dan peluang untuk memenangkan lelang. Kemudian akan dilakukan analisa profitabilitas dengan menggunakan bidding model, untuk mendapatkan profit maksimal dari mark up yang digunakan. Dari hasil analisa didapatkan mark up optimum PT. A untuk bisa memenangkan persaingan dalam pelelangan berkisar 9,58% - 11,65%. Sedangkan peluangnya untuk bisa memenangkan lelang berkisar 51,06% - 89,62%. Dan profit maksimal yang bisa didapatkan adalah sebesar 0,175% - 0,25% dari total estimasi biaya."
Depok: Fakultas Teknik Universitas Indonesia, 2003
S35173
UI - Skripsi Membership  Universitas Indonesia Library
cover
Edi Nugroho
Depok: Program Pascasarjana Universitas Indonesia, 2001
658.404 EDI d
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>