Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 12491 dokumen yang sesuai dengan query
cover
"This book presents a complete review of the unique instruments and the communication technologies utilized in downhole drilling environments. These instruments and communication technologies play a critical role in drilling hydrocarbon wells safely, accurately and efficiently into a target reservoir zone by acquiring information about the surrounding geological formations as well as providing directional measurements of the wellbore. Research into instruments and communication technologies for hydrocarbon drilling has not been explored by researchers to the same extent as other fields, such as biomedical, automotive and aerospace applications. Therefore, the book serves as an opportunity for researchers to truly understand how instruments and communication technologies can be used in a downhole environment and to provide fertile ground for research and development in this area. A look ahead, discussing other technologies such as micro-electromechanical-systems (MEMS) and fourth industrial revolution technologies such as automation, the industrial internet of things (IIoT), artificial intelligence, and robotics that can potentially be used in the oil/gas industry are also presented, as well as requirements still need to be met in order to deploy them in the field."
Switzerland: Springer Nature, 2019
e20509054
eBooks  Universitas Indonesia Library
cover
Dhilaryazti
"Kecelakaan kerja menyebabkan terhentinya proses bekerja. Kondisi tidak aman di tempat kerja, atau praktik yang tidak aman dari sesama karyawan, dapat mengganggu orang dan merusak kinerja mereka. Salah satu upaya perusahaan dalam mencegah terjadinya kecelakaan adalah dengan melakukan safety inspection. Skripsi ini membahas tentang evaluasi pelaksanaan safety safety inspection di area kerja drilling oleh PT. Surveyor Indonesia – Drilling & Completion Safety Compliance Audit pada tahun 2012. Penelitian ini merupakan penelitian semi kuantitatif. Untuk melakukan evaluasi, digunakan International Safety Rating System edisi ke-enam tahun 1996, yaitu elemen ketiga mengenai safety inspection. Kerangka konsep penelitian ini diambil dari variabel-variabel yang ada pada ISRS. Secara keseluruhan hasil penilaian safety inspection di PT. Surveyor Indonesia – DCSCA adalah 100 %, bahwa semua sasaran, target, serta pelaksanaan safety inspection sudah sesuai dengan elemen-elemen yang ada dalam International Safety Rating System.

Workplace injury causes the cessation of the work process. Unsafe conditions in the workplace, or unsafe actions from the workers, could disturb and damage the work performance. One of the company’s efforts to prevent accidents in to do a safety inspection program.This thesis discusses the evaluation of the safety inspection in area of work drilling by PT. Surveyor Indonesia- Drilling & Completion Safety Compliance Audit in 2012. This research is a semi-quantitative. To perform the evaluation, use the International Safety Rating System (ISRS) the sixth edition 1996, the third element of the safety inspection. Conceptual framework were taken from the variables that exist in the ISRS. Overall, of safety inspection at PT. Surveyor Indonesia - DCSCA is 100%, that all goals, targets, and implementation of safety inspection is in accordance with the elements that exist in the International Safety Rating System."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2013
S45285
UI - Skripsi Membership  Universitas Indonesia Library
cover
Deni Saputra
"Daerah prospek panas bumi Gunung Arjuno dan Gunung Welirang berada pada jalur vulkanik yang dikenal dengan jalur ring of fire, yaitu rentetan gunung api, baik yang aktif, maupun gunung api yang tidak aktif. Gunung tersebut berasosiasi dengan pembentukan sistem panas bumi yang ditandai dengan kemunculan manifestasi yang terdiri dari mata air panas Padusan, Coban dan Cangar serta adanya fumarol yang terdapat di komplek Gunung Welirang. Dari hasil perhitungan geothermometer daerah prospek panas bumi Gunung Arjuno dan Gunung Welirang memiliki temperatur 250o C dan masuk dalam kategori high temperature (>225 oC). Untuk mengetahui batas, kedalaman, dan geometri dari reservoir yang ada, dilakukan pengukuran dengan metode Magnetotellurik (MT), Time Domain Electromagnetic (TDEM) dan gaya berat.
Dari hasil pengukuran tersebut, dilakukan pemodelan pada 138 data MT, 103 data TDEM dan 253 data gaya berat. Selanjutnya hasil pemodelan dianalisa dengan menggunakan penampang 1 dimensi, 2 dimensi dan visualisasi 3 dimensi. Karakteristik reservoir berada pada kisaran 10-30 Ohm-m dengan nilai densitas rata-rata 2.2 gr/cc dan menghasilkan prospek panas Gunung Arjuno dan Gunung Welirang sekitar 40 km2 dengan potensi yang dapat dikembangkan untuk pembangkit tenaga listrik sebesar 140 MWe, rekomendasi penentuan titik bor eksplorasi berada di 2 km baratlaut dari komplek Gunung Welirang.

The geothermal prospect areas Mount Arjuno and Mount Welirang is on track which is known as volcanic ring of fire, which is a series of volcanoes, both active and inactive volcanoes. The mountain is associated with the formation of geothermal systems that are characterized by the appearance of manifestations consisting of Padusan, Coban and Cangar hot springs and their fumaroles located in Mount Welirang complex. From the calculation geothermometer, the geothermal prospect areas Mount Arjuno and Welirang has a temperature of 250°C and in the category of high temperature (190 oC-236 oC). To determine the boundary, the depth, and the geometry of the existing reservoir, measured by the method of magnetotelluric (MT), Time Domain Electromagnetic (TDEM) and gravity.
From the results of these measurements, modeling performed on the 138 MT data, 103 TDEM data and 253 gravity data. Furthermore, the modeling results were analyzed using 1 dimensional cross-section, 2 dimensional and 3 dimensional visualization. The position of the reservoir is in the range of 10-30 Ohm-m with an average density value 2.2 g/CC3 to generate hot prospects Mt.Arjuno and Mount Welirang approximately 40 km2. with potential developed for power plants of 140 MWe, recommendations exploration drill point determination located at 3km north-west of the mountain complex Mount Welirang.
"
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2014
T43401
UI - Tesis Membership  Universitas Indonesia Library
cover
Naldo Badriansyah
"Proses pemboran migas dalam pelaksanaannya memiliki proses kontrak perjanjian kerja yang akan mempengaruhi kegiatan dari jasa pemboran menjadi pendapatan organisasi. Dalam tulisan ini, penulis melakukan penelitian tentang proses bisnis yang terjadi pada organisasi jasa pengeboran di lini pendapatan, seperti pembuatan dokumen penagihan untuk pekerjaan yang dilakukan. Kami memvalidasi kesetaraan kriteria informasi dengan ahli dalam administrasi jasa pengeboran dengan kriteria informasi dalam administrasi publik. Dijelaskan juga proses bisnis yang terjadi dan perbandingan durasi proses pada standar jasa pemboran dengan proses realisasi juga untuk mengidentifikasi masalah dan menentukan kemungkinan pengembangan proses bisnis dengan BPR. Penelitian ini menghasilkan alternatif proses bisnis yang memiliki perubahan pada area proses bisnis yang berbeda-beda, diantaranya perubahan proses bisnis internal perusahaan, proses bisnis eksternal perusahaan atau proses bisnis pada klien, dan penggabungan antara proses bisnis internal dengan eksternal. Dari alternatif-alternatif tersebut didapatkan proses bisnis To-Be yang lebih efisien yang dihasilkan dari perbandingan alternatif-alternatif tersebut dengan manajemen risiko dan Analytical Hierarchy Process - Technique for Order Preference by similiarity to ideal solution.

The oil and gas drilling process in its implementation has a contractual agreement process that will affect the activities of drilling services into organizational income. In this paper, the author conducts research on the business processes that occur in drilling services in the revenue line, such as making billing documents for the work done. We validated the question of information criteria with experts in drilling services administration with information criteria in public administration. It also explained the business processes that occurred and the comparison of the duration of the standard drilling service process with the realization process as well as to identify problems and determine the possibility of developing business processes with BPR. This research produces alternative business processes that have changes in different business processes, including changes to the company's internal business processes, the company's external business processes or business processes to clients, and the merger between internal and external business processes. From these alternatives, a more efficient To-Be business process was obtained resulting from the comparison of these alternatives with risk management and Analytical Hierarchy Process - Technique for Order Preference by similarity to ideal solution"
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Huc, A. Y. (Alain Yves)
Paris: Technip, 2013
665.5 HUC g
Buku Teks SO  Universitas Indonesia Library
cover
Prasetyo Bayu Murty
"Proyek pengeboran eksplorasi minyak dan gas bumi merupakan proyek berisiko yang sebagian besar pekerjaannya dilaksanakan oleh kontraktor vendor . Risiko atas proyek yang dikerjakan oleh kontraktor umumnya dikelola dengan suatu kontrak. Penelitian ini dilakukan karena terdapat potensi membengkaknya biaya proyek yang dikarenakan lemahnya pengelolaan kontrak. Penelitian ini bertujuan untuk mengembangkan kerangka kerja manajemen kontrak untuk mengendalikan biaya proyek pengeboran eksplorasi. Pengembangan kerangka kerja tersebut dilakukan dengan menerapkan proses manajemen risiko. Dari pengumpulan data dan analisis yang dilakukan dalam penelitian ini dihasilkan 276 items checklist untuk meminimalkan probabilitas terjadinya 67 risiko yang berkaitan dengan 172 aktivitas manajemen kontrak. Di samping itu, untuk memitigasi dampak dari suatu risiko dalam penelitian ini juga disusun 8 klausula kontrak yang berkaitan dengan risiko yaitu hak dan kewajiban, tata cara pembayaran, sanksi dan denda, mediasi/pra litigasi, penyelesaian sengketa, ganti kerugian, asuransi, dan pembagian tugas.

Oil and gas exploration drilling project is a risky project which most of its works is executed by a contractor vendor . Risks of a project carried out by vendors should be managed by a contract. This research was initiated because there is possibility for increased project costs due to a weak contract management. This study aims to develop a contract management framework to control cost of drilling project. Such framework is developed by conducting risk management process. From data collection and analysis conducted in this research, 276 checklist items were produced to minimize the probability of 67 risks that related to 172 contract management activities. In addition, to mitigate the impact of the risks, this research proposed 8 risk related contract clauses, including rights and obligations, payment procedures, sanctions and penalties, mediation pre litigation, dispute resolution, compensation, insurance, and matrix of duties. "
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48727
UI - Tesis Membership  Universitas Indonesia Library
cover
Archer, J. S.
London: Graham & Trotman, 1986
665.5 ARC p
Buku Teks SO  Universitas Indonesia Library
cover
Muskat, Morris
Boston: IHRDC, 1981
622.338 MUS p
Buku Teks SO  Universitas Indonesia Library
cover
Stella Lydia Maria
"The distribution of subsidized fuel in Indonesia is still out of lane. It is manifested in the existence of groups which were targeted as subsidized fuel recipients but have not received the subsidy. This condition could be seen as what happened in Papua and Maluku. Those regions always receive the lowest quantity of subsidized fuel. The discrepantion between subsidized fuel volume in Papua and Maluku region towards another regions in Indonesia, like Java, Bali, and Sumatera island, is highly significant. The uneven distribution of subsidized fuel is problem that should be resolved, but not by distributing fuel evenly or in the same amount, but by funnelling to suit the needs in each respective regions. This research is confined to the region of Papua and Maluku. The purpose of this study is to obtain the estimation of subsidized fuel volume in Papua and Maluku region for 2015. The premium and solar volume are calculated based on the amount of vehicles used subsidized fuel data, Gross National Product data, and the number of residents data from 2010 until 2014. The amount of vehicles represents the number of subsidized fuel users. The way to estimate the subsidized volume in 2015 is through extended LEAP approach. Premium volume is calculated based on the amount of cars, motorcycles, and GNP datas. The solar volume is calculated based on the amount of cars, bus, trucks, boats, and GNP datas. The result of this study is expected to be used as a benchmark in the distribution of subsidized fuel, so that the Papua and Maluku region will receive the fuel subsidy no less nor excess the needs.

Distribusi BBM bersubsidi di Indonesia sampai saat ini masih belum merata Banyak kelompok yang menjadi sasaran penerima subsidi BBM tetapi belum dapat menikmatinya Seperti yang terjadi di wilayah Papua dan Maluku yang selalu menerima BBM bersubsidi dengan kuantitas paling kecil Diskrepansi antara volum BBM bersubsidi di wilayah Papua dan Maluku dengan wilayah lainnya di Indonesia seperti Pulau Jawa Bali dan Sumatera pun cukup signifikan Ketidakmerataan distribusi BBM bersubsidi merupakan permasalahan yang harus diatasi namun bukan dengan mendistribusikan BBM bersubsi secara merata atau dalam jumlah yang sama untuk seluruh wilayah melainkan dengan menyalurkan sesuai dengan kebutuhan di suatu wilayah dimana pada penelitian ini dikhususkan untuk wilayah Papua dan Maluku Tujuan dari penelitian ini adalah untuk memperoleh perkiraan besar volum BBM bersubsidi di wilayah Papua dan Maluku pada tahun 2015 Pada penelitian ini dilakukan perhitungan volum premium dan solar berdasarkan data jumlah kendaraan yang menggunakan BBM bersubsidi PDRB mulai tahun 2010 hingga 2014 sehingga dapat diperkirakan volum BBM bersubsidi pada tahun 2015 melalui pendekatan extended LEAP Volum premium dihitung berdasarkan data jumlah mobil dan motor serta PDRB tani dan jasa Volum solar dihitung berdasarkan data jumlah mobil bus truk dan perahu serta PDRB tani dan jasa Hasil dari penelitian ini diharapkan dapat digunakan sebagai patokan dalam pendistribusian BBM bersubsidi sehingga wilayah Papua dan Maluku menerima subsidi BBM tidak kurang dari kebutuhannya namun juga tidak berlebih."
Depok: Universitas Indonesia, 2014
S59251
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ryan Dharmasaputro Vilda
"ABSTRAK
Dalam dunia pengeboran, terdapat istilah sumur cluster yang dimana dalam satu
sumur terdapat beberapa titik pengeboran yang mempunyai posisi sejajar satu
sama lain dengan jarak antara 10 m hingga 20 m. Dalam sumur cluster, proses rig
up dan rig down menjadi tidak efisien karena membutuhkan waktu yang lebih
lama sehingga biaya operasi menjadi lebih besar. Sehingga dalam hal ini,
pendorong rig sliding menjadi salah satu alat yang dianggap jauh lebih efektif
dalam memangkas waktu dibandingkan dengan metode konvensional yaitu
dengan rig up dan rig down. Dalam hal ini komponen gripper adalah salah satu
komponen yang terdapat di pendorong sliding rig yang berperan sebagai
penahan dalam mekanismenya. Penulisan ini bertujuan untuk merancang
komponen gripper dengan menggunakan material yang terdapat di produsen lokal
sehingga komponen dapat dibuat secara mandiri oleh negara Indonesia.

ABSTRACT
In term of Drilling world. There is cluster well which have multi point of
drilling hole in parallel position respect with each other. The distance of this
cluster section have about 10m until 20 m for each other hole. In Cluster Well,
the rig up and rig down process became inefficiently process because this process
require more time so the drilling operation cost become ekspensive. In this case,
the Sliding Drilling Rig Mover become more efective to cut off the time than the
convesional method which using rig up and rig down. In this Mover, therer is
component which called Gripper. This Component have role as Holder to hold the
action force from hydraulic which to push the substructure. This study aimed to
design Gripper components using materials which can be found at local
produsen so with the result that, the components can be independent produced by
Indonesia"
2014
S54077
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>