Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 9576 dokumen yang sesuai dengan query
cover
Suzuki, Kazuhito
"This book explores the differences in cultural attributes and management factors to enable managers working for Japanese contractors to reduce misunderstandings and misinterpretations when communicating with project team members from different cultural backgrounds. It focuses on Japanese contractors operating in Singapore, since the Singapore construction industry has, for many years, been one of the largest overseas construction markets for the top-5 Japanese contractors.
Using Hofstedes national cultural framework for the cultural studies in construction project management, it reveals various real-world management practices and discusses national cultural differences relating to managers working for Japanese contractors in Singapore as well as the communication weaknesses of current management practices and styles. The results presented provide useful lessons for Japanese contractors operating in Singapore, as well as other parts of the world, to bridge cultural and communication gaps."
Singapore: Springer Nature, 2019
e20509138
eBooks  Universitas Indonesia Library
cover
Poetera Ramadhan Agoes
"Pembangunan Infrastruktur di Indonesia, baik yang diinisiasi oleh pemerintah maupun pihak swasta dalam beberapa tahun terakhir mengalami pertumbuhan yang pesat. Tercatat, sampai dengan tahun 2023 terdapat total 201 proyek infrastruktur, terdiri dari sektor transportasi, sektor kawasan, sektor sumber daya air, sektor perumahan dan sektor energi yang masuk ke dalam proyek strategis nasional dan saat ini sudah terealisasi total 156 proyek. Namun, tingginya pertumbuhan pembangunan infrastruktur di Indonesia juga diikuti dengan meningkatnya kasus kegagalan konstruksi. Dalam periode tahun 2017-2022, telah terjadi peristiwa kegagalan konstruksi pada proyek infrastruktur yang melibatkan penyedia jasa konstruksi Badan Usaha Milik Negara (BUMN) dengan kualfikasi usaha perusahaan besar. Merujuk kepada peraturan Lembaga Pengembangan Jasa Konstruksi Nomor 12 Tahun 2009, perusahaan dengan kualifikasi besar harus memiliki sertifikat ISO 9001:2000 untuk sistem manajemen mutu. Badan Usaha Milik Negara (BUMN) dengan kualifikasi besar harus menerapkan pengendalian proyek yang baik berdasarkan sistem manajemen mutu ISO 9001:2000 mulai dari tahap perencanaan sampai dengan tahap pembangunan. Komunikasi yang merupakan satu dari tiga indikator strategi pengembangan budaya mutu, sistem kepemimpinan dan tingkat kematangan, turut andil dalam terjadinya kegagalan konstruksi. Dalam dunia konstruksi yang kompleks dan melibatkan beberapa individu atau kelompok, komunikasi yang mencakup pertukaran informasi yang efektif dan pemahaman terhadap informasi yang diterima berperan besar dalam kesuksesan proyek dan memenimalisir kegagalan konstruksi. Informasi harus didistribusikan kepada pihak yang tepat, secara akurat dan konsisten sehingga Distribusi Informasi yang merupakan satu dari lima parameter kontrol yang mempengaruhi sistem komunikasi. Tujuan dari penelitian ini adalah menentuan indikator-indikator dalam sistem komunikasi proyek konstruksi yang berpengaruh terhadap keberhasilan perusahaan jasa konstruksi bumn nasional dalam menurunkan tingkat kegagalan konstruksi dan menghasilkan strategi peningkatan distribusi informasi dalam sistem komunikasi proyek konstruksi yang perlu diterapkan pada perusahaan jasa konstruksi bumn nasional untuk menurunkan tingkat kegagalan konstruksi. Metode penelitian yang digunakan adalah validasi pakar, wawancara dan studi literatur. Hasil penelitian ini didapatkan  11 variabel dan 37 Indikator distribusi informasi yang berpengaruh dalam menurunkan kegagalan konstruksi.

Infrastructure development in Indonesia, both initiated by the government and the private sector, has experienced rapid growth in recent years. It is recorded that up to 2023 there will be a total of 201 infrastructure projects, consisting of the transportation sector, the regional sector, the water resources sector, the housing sector, and the energy sector, which are included in national strategic projects, and currently a total of 156 projects have been realized. However, the high growth in infrastructure development in Indonesia has also been accompanied by an increase in construction failures. In the period 2017–2022, there have been construction failures in infrastructure projects involving state-owned construction service providers (BUMN) with large company business qualifications. Referring to the Construction Services Development Institute regulation Number 12 of 2009, companies with large qualifications must have an ISO 9001:2000 certificate for a quality management system. State-Owned Enterprises (BUMN) with large qualifications must implement good project control based on the ISO 9001:2000 quality management system from the planning stage to the construction stage. Communication, which is one of the three indicators of a quality culture development strategy, leadership system, and level of maturity, has contributed to construction failures. In a complex world of construction involving several individuals or groups, communication that includes effective exchange of information and understanding of the information received plays a major role in project success and minimizes construction failures. Information must be distributed to the right parties accurately and consistently, so information distribution is one of the five control parameters that affect the communication system. The purpose of this study is to determine the indicators in the construction project communication system that influence the success of national state-owned construction service companies in reducing construction failure rates and produce strategies for increasing information distribution in construction project communication systems that need to be applied to national-owned construction service companies to reduce construction failure rates. The research methods used are expert validation, interviews, and literature studies. The results of this study obtained 11 variables and 37 indicators of information distribution that had an effect on reducing construction failures."
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Raseesha Nauratul Gustia
"Meningkatnya jumlah proyek konstruksi, mengingat ada kebijakan pemerintah untuk meningkatkan perkembangan ekonomi Indonesia dengan mempercepat proyek pembangunan infrastruktur, mempengaruhi fenomena-fenomena yang terjadi dalam kegagalan konstruksi di Indonesia dalam 3 tahun belakang. Terdapat 14 kecelakaan konstruksi kelas besar di Indonesia pada tahun 2017-2019. Hal tersebut mengidentifikasikan bahwa meningkatnya fenomena kegagalan konstruksi di Indonesia setelah diterapkannya Proyek Strategis Nasional. Perusahaan Jasa Konstruksi Asing yang juga bertanggung jawab atas beberapa proyek dari Proyek Strategis Nasional ini berpengaruh sangat signifikan terhadap fenomena-fenomena yang ada di bisnis konstruksi di Indonesia. Terdapat beberapa hal yang mempengaruhi budaya mutu dari Perusahaan Jasa Konstruksi Asing termasuk tigkat maturitas dari perusahaan konstruksi sendiri. Tujuan dari penelitian ini adalah mengidentifikasi tingkat maturitas dari budaya mutu Perusahaan Jasa Konstruksi Asing dan untuk merancang strategi meningkatkan tingkat maturitas budaya mutu pada Bada Usaha Jasa Konstruksi Asing untuk menghindari fenomena-fenomena kegagalan konstruksi. Penelitian ini menggunakan metodologi penelitian studi literatur dan survei yang dilakukan dengan menyebarkan kuisioner kepada responden di kontraktor asing di Indonesia. Hasil dari penelitian ini adalah 24 strategi yang disarankan untuk diimplementasikan oleh kontrator asing untuk menurunkan tingkat kegagalan konstruksi.

The increasing number of construction projects in Indonesia, given the government's policy to improve the development of the Indonesian economy by accelerating infrastructure development projects, has influenced the phenomena that have occurred in construction failures in Indonesia in the past 3 years. There were 14 large-scale construction accidents in Indonesia recorded by Kompas in 2017-2019. This identified that the phenomenon of increasing construction failure in Indonesia after the implementation of the National Strategic Project. The existence of a foreign construction company which is also responsible for several projects of the National Strategic Project has a very significant effect on the phenomena that exist in the construction business in Indonesia. There are several things that affect the quality culture of foreign construction companies including the level of maturity of the construction companies themselves. The purpose of this study is to identify the level of maturity of the quality culture of foreign construction service companies in Indonesia and to design strategies to improve the level of quality culture maturity in foreign construction service companies to avoid the phenomena of construction failure. This study uses a literature study and a survey conducted by distributing questionnaires to respondents in foreign contractors in Indonesia as research methodology. The results of this study are 24 strategies that are suggested to be implemented by foreign contractors to reduce construction failure rates."
Jakarta: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Adi Irfan Zidni
"

Dalam penyelenggaraan proyek konstruksi, pelelangan merupakan salah satu tahapan yang sangat penting, hal ini dikarenakan kesuksesan pada tahap ini merupakan awal dimulainya pelaksanaan proyek konstruksi. Pelaksanaan lelang jasa konstruksi pada Dinas Pekerjaan Umum Kabupaten Brebes mengacu pada Keputusan Presiden Republik Indonesia Nomor 80 Tahun 2003 yang diatur secara teknis dalam Peraturan Daerah Kabupaten Brebes Nomor 7 Tahun 2007 tentang Pedoman Pengelolaan Barang Milik Daerah. Namun, fenomena yang terjadi adalah penyelenggaraan lelang jasa konstruksi dipengaruhi oleh adanya dugaan keterlibatan Asosiasi Jasa Pelaksana Konstruksi. Dalam hal ini, Asosiasi Jasa Pelaksana Konstruksi mengatur pelelangan dengan cara menciptakan persaingan semu di antara penawar.

Penelitian ini bertujuan untuk mengetahui penyebab keterlibatan, bentuk keterlibatan, pengaruh keterlibatan, tingkat keterlibatan, dan tingkat keberhasilan penyedia jasa konstruksi memenangkan lelang jasa konstruksi pada Dinas Pekerjaan Umum Kabupaten Brebes.

Metode penelitian yang digunakan adalah metode survei, di mana proses pengumpulan data penelitian dilakukan melalui penyebaran kuisioner dan wawancara langsung dengan responden dan prosedur yang digunakan untuk menganalisis data penelitian adalah analisis statistik deskriptif dengan metode distribusi frekuensi dan metode analisis statistik lainnya yang meliputi uji validitas dan reliabilitas dengan Corrected Item Total Correlation Test dan analisis komparatif dengan Kruskal Wallis Test.

Dari hasil penelitian ini diketahui bahwa Asosiasi Jasa Pelaksana Konstruksi sangat terlibat dalam proses lelang jasa konstruksi pada Dinas Pekerjaan Umum Kabupaten Brebes dan dengan adanya keterlibatan tersebut menjadikan tingkat keberhasilan penyedia jasa konstruksi untuk memenangkan lelang jasa konstruksi sangat besar.


In construction project, tender becomes important because it represent early starting construction project. Tender in Department of Public Work Brebes Region is executed based on Presidential Decree Number 80/2003 and technically arranged by Brebes Region Government Law Number 7/2007 about Local Property Asset Management Guidance. Phenomenon that happened in environment in Department of Public Work Brebes Region is the existence of anticipation that management of construction tender very influenced by existence of Contractor Associates involvement. Contractor Associates link importance all it?s member to get opportunity in following tender with limited emulation.

This study had a purpose to know cause of involvement, form involvement, influence of involvement, mount involvement, and level efficacy of contractor to win construction tender in Department of Public Work Brebes Region.

The study method that writer used are case study that gathering respondent in form of survey and interview with related parties and data from that survey will be analyzed with descriptive statistical analysis by using frequency distribution method and statistic analyzed other which is validity and reliability analysis with Corrected Total Item Correlation Test and comparability analysis with Kruskal Wallis Test.

From this study the writer find out the Contractor Associates very involved in tender process at Department of Public Work Brebes Region and with existence of the involvement make level efficacy of contractor to win construction tender in Department of Public Work Brebes Region very big.

"
2008
S50562
UI - Skripsi Open  Universitas Indonesia Library
cover
Chatarina Riris
"Komunikasi antar stakeholder di lingkungan Dinas Bina Marga mempengaruhi mutu jalan layang non tol pada tahap perencanaan, pembangunan dan pemeliharaan. Tujuan dari penelitian ini adalah mengidentifikasi stakeholder yang berpengaruh pada mutu juga mengidentifikasi faktor risiko pada alur komunikasi di tahap perencanaan dan pembangunan kontrak rancang bangun serta tahap pemeliharaan, serta mengembangkan alur komunikasi antar stakeholder tersebut. Strategi penelitian yang digunakan adalah survey dan studi kasus. Dari faktor risiko yang ada dan dampak yang ditimbulkan, akan diketahui hubungan di tiap tahapan dan dianalisis menggunakan Structural Equation Modeling. Hasil dari penelitian ini didapat alur komunikasi antar stakeholder yang telah berbasis risiko.

Communication among stakeholders within the Highways Departement affects the quality of elevated highways in the planning, development and maintenance stages. The purpose of this research is to identify the stakeholders that influence the quality as well as to identify the risk factors in the communication flow at the each stage, and to develop communication flow between the stakeholders. The research strategy used is survey and case study. From the existing risk factors and impacts, we will know the relationships at each stage and analyzed using Structural Equation Modeling. The result of this research is the communication flow between stakeholders that have been risk based"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48112
UI - Tesis Membership  Universitas Indonesia Library
cover
Fauzi Jundullah
"ABSTRAK
Tulisan ini membahas mengenai upaya adaptasi dan komunikasi antar budaya antara panitia lokal dan asing di lingkungan panitia festival Ennichisai Little Tokyo Blok M 2016. Penelitian ini menggunakan teknik kualitatif dengan pendekatan etnografi, dengan menggunakan konsep adaptasi antarbudaya dan komunikasi antarbudaya. Hasil dari penelitian ini menunjukkan bahwa adaptasi dan komunikasi antar kelompok panitia berjalan tanpa adanya hambatan besar, terlebih memicu konflik terbuka, dimana masing-masing anggota kelompok mampu mengakomodasi sikap dari masing-masing pihak yang berhubungan dengan mereka selama persiapan dan pelaksanaan acara.

ABSTRACT
This study is researching about adaptation and communication attempts between local staffs and Japanese staffs at Ennichisai Little Tokyo Blok M 2016 Festival. This research is using qualitative methods with ethnographical approach, using cross cultural adaptation and cross cultural communication. The result of this research shows that adaptations and communication between those groups going well without any open conflict. They can accomodate their attitude and characters each other during the event. "
2016
S66444
UI - Skripsi Membership  Universitas Indonesia Library
cover
Syamsul Adnan Alwie
"Perselisihan konstruksi (construction dispute) adalah sengketa atau perselisihan yang terjadi sehubungan dengan pelaksanaan suatu usaha jasa konstruksi antara pihak yang tersebut dalam kontrak konstruksi. Perselisihan dapat raja terjadi dalam pelaksanaan suatu proyek dan berdampak negatif terhadap sasaran proyek. Perlu dilakukan identifikasi karakteristik proyek sebelum proyek dimulai, agar tim proyek dapat mengetahui lebih dini untuk rnembuat perubahan-perubahan supaya perselisihan dapat dicegah atau diminimalkan. Penelitian ini mengidentifikasi variabel-variabel proyek yang berpotensi menimbulkan perselisihan konstruksi.
Tulisan ini menjelaskan kriteria-kriteria proyek yang dievaluasi, teknik analisa data dan kesimpulan dari analisis yang dilakukan. Tiga kriteria proyek yang dipertimbangkan dalam tulisan ini, yaitu kriteria manusia, proses dan proyek.
Hasil penelitian didasarkan analisa statistik dari data frekuensi dan keparahan (severtity) perselisihan konstruksi pada 20 sampel proyek konstruksi dengan metode survei kuesioner. Suatu model logistic regression yang dibuat dan kumpulan data merupakan suatu indikator potensial perselisihan konstruksi, dapat digunakan untuk memprediksi kecenderungan proyek untuk mengalami perselisihan konstruksi. Faktor-faktor manusia, proses dan proyek berperan dalam memprediksi kemungkinan terjadinya perselisihan konstruksi. Kesimpulan mendasar dari penelitian ini mengungkapakan bahwa faktor manusia berperan dalam menimbulkan atau menghindari terjadinya perselisihan konstruksi."
Depok: Fakultas Psikologi Universitas Indonesia, 2004
T14991
UI - Tesis Membership  Universitas Indonesia Library
cover
Deti Margayanti
"ABSTRAK
Estimasi biaya konstruksi baik itu owner estimate yang dilakukan oleh pihak pemilik proyek maupun contractor estimate yang dilakukan oleh pihak kontraktor pada saat tahap penawaran suatu proyek (bid estimate) seringkali kurang memperhitungkan besarnya prosentase biaya kontingensi yang berguna untuk melingkupi atau mengantisipasi hal-hal tak terduga termasuk faktor inflasi. Hal ini mengakibatkan membengkaknya biaya yang dikeluarkan oleh pihak kontraktor selaku pelaksana pekerjaan proyek konstruksi. Sehingga pada akhirnya pihak kontraktor akan mengajukan beberapa paket pekerjaan tambahan yang disusulkan pada scat pelaksanaan pekerjaan proyek konstruksi untuk menghindari kerugian. Bagi pihak pemilik proyek kondisi seperti ini akan menyebabkan semakin membengkaknya pengeluaran biaya yang dialokasikan untuk pelaksanaan pekerjaan proyek konstruksi sementara anggaran biaya hanya berdasarkan pada nilai owner estimate. Apabila hal ini terns menerus berlangsung akan berdampak pada tidak tersedianya anggaran biaya yang cukup untuk menyelesaikan pekerjaan proyek konstruksi yang membuat pelaksanaan pekerjaan proyek konstruksi menjadi terhambat atau bahkan menjadi terhenti. Oleh karena itu diperlukan suatu analisa yang dapat menghasilkan suatu forecasting range estimate termasuk didalamnya perhitungan biaya kontingensi agar dapat diketahui batas minimum dan batas maksimum perhitungan biaya konstruksi untuk item-item pekerjaan dalam suatu proyek. Berkaitan dengan hal tersebut maka dalam penulisan tesis ini akan dilakukan suatu analisa untuk mengetahui seberapa besar biaya kontingensi diperhitungkan dalam suatu estimasi biaya konstruksi pada tahap penawaran. Analisa dilakukan terhadap data-data estimasi biaya konstruksi dui owner esimate dan contractor estimate pada tahap penawaran suatu proyek. Dalam hal ini dilakukan studi kasus pada data-data estimasi biaya konstruksi dari owner estimate dan contractor estimate untuk proyek-proyek pembangunan gedung perkantoran milik PT. (PERSERO) Bank Negara Indonesia Tbk. Selama untuk kurun waktu tahun 2000-2005 dengan lokasi di pulau Jawa, Indonesia. Pengolahan data dilakukan dengan bantuan software SPSS, Crystal Ball, dan Project Risk Analysis. Diharapkan dengan basil analisis terhadap data-data tersebut dapat ditentukan suatu forecasting range estimate yang telah pula memperhitungkan besamya biaya kontingensi untuk dapat mengantisipasi segala
"
2007
T17310
UI - Tesis Membership  Universitas Indonesia Library
cover
Dian Subandini
"Tujuan penulisan adalah menganalisis aktivitas pengendalian internal PT. X terhadap proyek KSO. Penelitian merupakan studi kasus dengan metode penelitian berupa wawancara dan observasi serta studi kepustakaan. Karakteristik proyek KSO adalah bekerjasama dengan mitra mengerjakan suatu proyek, pencatatan akuntansi dengan metode ekuitas, dan memiliki NPWP tersendiri sehingga aktivitas pengendalian berbeda dengan proyek non KSO.
Penelitian menyimpulkan aktivitas pengendalian internal PT. X untuk proyek KSO sudah cukup memadai, dengan terpenuhinya tiga prinsip aktivitas pengendalian COSO. Beberapa perbaikan perlu dilakukan sehingga risiko dapat dimitigasi sampai level yang dapat diterima, sistem informasi memiliki general control yang baik, kebijakan dan prosedur dapat dilaksanakan dengan baik.

The purpose of writing is to analyze the activity of internal control of PT. X on KSO project. Research is a case study with research methods in the form of interviews and observation and literature study. The characteristics of the KSO project are to work with partners on a project, accounting records using the equity method, and have a separate NPWP so that control activities are different from non-KSO projects.
The study concludes that PT. X's internal control activities for the KSO project are sufficient, with the fulfillment of three principles of COSO control activities. Some improvements need to be made so that risks can be mitigated to acceptable levels, information systems have good general control, policies and procedures can be well implemented.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2017
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ibrahim
"Kolaborasi antar stakeholder dalam siklus hidup proyek sangat penting untuk meningkatkan kinerja proyek konstruksi rancang bangun. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor yang mempengaruhi keberhasilan kolaborasi tim proyek konstruksi rancang bangun sehingga didapatkan pengaruh dari model kolaborasi terhadap kinerja kolaborasi dengan faktor rentang batas geografis, profesional, stakeholder, dan budaya etnis dalam proyek kontstruksi rancang bangun di Indonesia. Penelitian ini menggunakan analisa faktor dan hubungan variabel dengan metode Structural Equation Modeling SEM . Hasil dari penelitian didapatkan rentang batas geografis dan budaya etnis berpengaruh secara signifikan pada kinerja kolaborasi.

Collaboration between stakeholders in the project life cycle is critical to improving design and build construction project performance. The purpose of this research is to identify the critical success factors of collaboration of design and build construction project team so that can be understand the influence of collaboration model to collaboration performance with the geographic, professional, stakeholder, and ethnic cultural boundary spanners in design and build construction project in Indonesia. This research uses factor analysis and variable relation with Structural Equation Modeling SEM method. The results of the research obtained geographical and ethnical boundaries significantly influence the collaboration performance."
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48743
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>