Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 194534 dokumen yang sesuai dengan query
cover
Christiantono Tedjo
"Dalam mencapai tujuan proyek yang efektif, efisien, serta aman diperlukan perencanaan metode konstruksi yang matang. Metode konstruksi pada proyek bisa berbeda-beda tergantung deskripsi dan desain dari proyek tersebut. Perencanaan metode konstruksi pada umumnya tidak sebentar, melibatkan banyak pihak, serta perlu pertimbangan dari segi biaya, sumber daya, dan safety. Salah satu proses berkelanjutan dan berpengaruh dalam pendefinisian metode konstruksi adalah penentuan sumberdaya, alat, tahapan kerja, serta penyesuaian teknis alat berat. Ditambah perlunya karakteristik perencanaan konstruksi untuk gedung pintar pada masa ini. Machine-learning yang dikombinasikan dengan sistem blockchain merupakan salah satu instrumen yang dapat mengakomodir proses dalam metode konstruksi terutama dalam pendefinisian schedule alat dan sumberdaya, serta tahapan konstruksi. Mulai dari perencanaan sampai integrasi-evaluasi dengan basis historical data. Digunakannya instrumen tersebut dalam penelitian hasilnya mampu
mendefinisikan proses perencanaan konstruksi yang sangat cepat dengan menggunakan data spesifikasi dan biaya bangunan, sehingga dapat meningkatkan
produktiftas proses perencanaan konstruksi, serta dibandingkan metode perencanaan manual dapat memberikan hasil yang lebih efisien dari segi
penjadwalan sumberdaya dan alat, serta biayanya.

In achieving project objectives that are effective, efficient, and safe, careful planning of construction methods is required. Construction methods on projects may vary depending on the description and design of the project. Construction method planning is generally not short, involves many parties, and requires consideration in terms of costs, resources, and safety. One of the continuous and influential processes in defining construction methods is the determination of resources, tools, work stages, and technical adjustments of heavy equipment. Plus the need for construction planning characteristics for smart buildings at this time. Machine-learning combined with a blockchain system is one instrument that can
accommodate the process of construction methods, especially in defining tool and resource schedules, as well as construction stages. Starting from planning to integration-evaluation with the historical database. The use of these instruments in research results in being able to define fast construction planning process using building specifications data and budget, to increase the productivity of the construction planning process, and compared to manual planning methods can provide more efficient results in terms of scheduling resources and tools, as well as costs.
"
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Sihombing, Ruben
"Proses perencanaan terpadu menjadi landasan dalam perencanaan bangunan hijau, namun bagaimana para perencana terintegrasi dalam tiap tahapan perencanaan bangunan hijau belum terdefinisi dengan baik sehingga sulit untuk mewujudkan konsep proses perencanaan terpadu. Penggunaan teknologi BIM dalam perencanaan yang mempunyai kemampuan mengakomodir kolaborasi antar pemangku kepentingan proyek masih terbatas pada entitas tertentu. Kedua hal ini membuat proses kolaborasi antar perencana atau pemangku kepentingan proyek sulit tercapai. Tulisan ini bertujuan untuk mengembangkan alur perencanaan gedung bangunan hijau melalui integrasi blockchain pada BIM agar transparansi informasi antar perencana pada BIM dapat dikontrol dengan teknologi buku besar dengan basis hyperledger fabric. Pendekatan kualitatif melalui kajian literasi, validasi pakar dan percobaan digunakan untuk mengetahui bagaimana alur perencanaan dapat diintegrasikan dengan blockchain pada BIM. Hasil dari penelitian ini mengindikasikan alur perencanaan dapat dimodelkan dengan blockchain namun proses integrasi memerlukan pembuatan aplikasi sebagai sarana komunikasi antara BIM dan hyperledger fabric.

Integrated design process is the basis for green building planning, but how the integration among the designer in each stage of green building planning is questionable, makes this process difficult to implemented. BIM is a computer-aided modeling technology with the ability to develop the design, manage project information, and collaborate between project stakeholders, bringing efficiency for the processes in the project life cycle. However, despite its advantages, information transparency and operations within BIM in supporting the collaboration of the planning team are arguably still limited to certain entities. For those reasons the integrated design process is hard to achieve. Therefore, this study aims to develop the green building design workflow through blockchain integration in BIM for information transparency among the designer on BIM controlled with distributed ledger technology on a hyperledger fabric platform. A qualitative approach through literature review, benchmarking study, and experiments were used to obtain this objective by considering the planning process of green building as a case study. The results of this study indicate that model of design workflow was build in hyerledger fabric blockchain but integration need an application as a tool for blockchain comminiacated with BIM."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Daffa Reyhando Imama
"Pembangunan Ibu Kota Negara yang terletak di Kalimantan Timur menjadi proyek besar pemerintah dengan anggaran biaya Rp 466 Triliun. Untuk menjamin efisiensi biaya konstruksi dari proyek ini, diperlukan pendekatan estimasi biaya yang baik. Namun estimasi biaya dalam konstruksi di Indonesia saat ini masih didominasi metode konvensional yang masih memiliki kekurangan dalam hal akurasi maupun waktu pemantauan. Oleh karena itu, penelitian ini dilakukan dengan tujuan untuk mengembangkan model machine learning untuk memprediksi estimate at completion biaya konstruksi sebagai alternatif dari metode konvensional. Penelitian ini dilakukan dengan metode analisis studi literatur dan benchmarking dari penelitian yang telah ada untuk menjalankan simulasi model menggunakan perangkat lunak RapidMiner yang kemudian akan divalidasi oleh narasumber pakar melalui wawancara. Diperoleh hasil bahwa model terbaik didapat menggunakan algoritma neural network. Dari simulasi model tersebut dengan menggunakan data dari salah satu proyek pembangunan jalan raya di Ibu Kota Negara, didapat hasil output berupa prediksi penghematan sebesar 17,8% dari nilai budget at completion proyek. Hasil dari prediksi model tersebut menghasilkan output yang lebih konservatif apabila diperbandingkan dengan metode konvension menggunakan formula estimate at completion biaya.

The development of the National Capital City located in East Kalimantan has become a major government project with a budget of IDR 466 trillion. To ensure cost efficiency in the construction of this project, a good cost estimation approach is required. However, cost estimation in construction in Indonesia is currently dominated by conventional methods that still have shortcomings in terms of accuracy and monitoring time. Therefore, this research is conducted with the aim of developing a machine learning model to predict the estimate at completion of construction costs as an alternative to conventional methods. The research is carried out through the analysis of literature studies and benchmarking from existing research to execute a simulation model using the RapidMiner software, which will then be validated by expert informants through interviews. The results indicate that the best model is obtained by using neural network algorithm. From the simulation model using data from one of the road construction projects in the National Capital City, the output shows a predicted savings of 17.8% from the project’s budget at completion value. This model prediction produce a more conservative result than conventional methods of estimating costs at completion."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rizka Wulan Triadji
"Tahap desain yang merupakan tahap yang paling kompleks untuk dipahami, dijalankan dan dikelola membuat industri konstruksi mengalami penurunan produktivitasnya. Selain masalah desain, bangunan memiliki masalahnya tersendiri yaitu kegiatan pembangunanya yang memiliki dampak negatif pada lingkungan. Hal ini membuat pentingnya menerapkan konsep green building pada tahap desain. Proses desain green building yang memakan waktu lebih lama daripada bangunan konvensional membuat industri konstruksi diharapkan mampu mengambil langkah yang inisiatif dalam menemukan cara alternatif dalam membuat tahapan desain green building dengan cara yang lebih efektif. Salah satunya dengan penerapan teknologi dengan menggunakan machine learning. Berdasarkan masalah tersebut penelitian ini akan menggabungkan solusi atas kedua masalah dari industri bangunan, dengan membangun model machine learning untuk perencanaan desain green building. Variabel green building yang digunakan dalam mengembangkan model machine learning adalah efisiensi energi, kualitas ligkungan dalam ruangan, efisiensi air dan perencanaan lokasi. Metode yang diambil sebagai model terbaik dalam penelitian ini adalah model dengan pengganbungan algoritma IF/ELSE dan artificial neural network dengan nilai mean square error sebesar 1.3.

The design stage is the most complex stage to understand, carry out and manage, causes the construction industry has experienced declining productivity. Apart from design issues, buildings have their own problems, their construction activities have a negative impact on the environment. It is important to apply green building concepts at the design stage. The green building design process takes longer than conventional buildings makes the construction industry expected to be able to take initiative steps in finding alternative ways to make green building design stages more effective. Based on these problems, this research will combine solutions to the two problems of the building industry, by building machine learning models for green building designs. Green building variables used in developing machine learning models are energy efficiency, indoor environmental quality, water efficiency and site planning. The method taken as the best model in this study is a model by combining the IF/ELSE algorithm and artificial neural network with a mean square error of 1.3. "
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Riaz Fachrizal Muzadi
"

Pembangunan Ibu Kota Negara yang terletak di Kalimantan Timur mengusung konsep Future Smart Forest City. Untuk mendukung pembangunan konsep kota ini diperlukan integrasi antara konstruksi dengan digitalisasi seperti teknologi Digital Twin. Namun konsep Digital Twin ini masih dalam tahapan pengembangan di seluruh dunia dan belum banyak diketahui efek dan manfaatnya pada tahapan konstruksi terutama pekerjaan monitoring. Oleh karena ini, penelitian ini dilakukan dengan tujuan mengetahui apa saja perbedaan yang terdapat pada monitoring konvensional dengan monitoring digital untuk kemudian dilihat seberapa besar efektivitas waktu dan efisiensi biaya yang digunakan. Penelitian ini dilakukan dengan metode analisis studi literatur dari penelitian yang telah ada dan penyesuaiannya dengan pembangunan IKN yang kemudian didiskusikan dan validasi oleh pakar/ahli melalui wawancara. Diperoleh hasil bahwa terdapat beberapa perbedaan yang terdapat antara kedua jenis monitoring ditinjau dari tahapan Construction Progess Monitoring. Dari perbedaan tersebut juga diperoleh daftar tenaga ahli atau SDM yang digunakan serta peralatannya. Tenaga ahli dan peralatan yang digunakan pada kedua jenis monitoring kemudian di analisis dengan hasil yaitu efektivitas waktu sebesar 68.97-78.57% serta efisiensi biaya sebesar 58.55-71.60%.


The development of the Ibukota Negara which is located in East Kalimantan carries the concept of the Future Smart Forest City. To support the development of this city concept, integration between construction and digitalization is needed, such as Digital Twin technology. However, the Digital Twin concept is still under development throughout the world and not much is known about its effects and benefits at the construction stage, especially monitoring work. Because of this, this research was conducted with the aim of finding out what are the differences between conventional monitoring and digital monitoring and then seeing how much time effectiveness and cost efficiency are used. This research was carried out using the method of analysis of literature studies from existing research and its adjustments to the development of IKN which were then discussed and validated by experts through interviews. The results show that there are several differences between the two types of monitoring in terms of the Construction Progress Monitoring stage.. From these differences also obtained a list of experts or human resources used and the equipment. The experts and equipment used in both types of monitoring were then analyzed with the results of time effectiveness of 68.97-78.57% and cost efficiency of 58.55-71.60%.

"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Andias Mintoharjo
"Salah satu klasifikasi Bangunan Gedung Negara berupa gedung khusus yang menjadi perhatian dalam pembangunannya saat ini yaitu Stadion. Penyelenggaraan pembangunan Stadion di Indonesia baik berupa bangunan baru ataupun renovasi beberapa diantaranya telah menggunakan kontrak terintegrasi rancang bangun karena dinilai lebih baik dari aspek biaya dan waktu. Namun dalam pelaksanaan pembanguan Stadion tersebut masih banyak dihadapkan dengan permasalahan berupa keterlambatan jadwal, variasi pekerjaan tambah kurang yang tidak sesuai dengan rencana awal, kelebihan biaya, klaim, dan hingga terjadinya sengketa diantara pengguna jasa, penyedia jasa, maupun pihak auditor. Masalah ini terjadi karena banyak risiko-risiko terkait biaya dan waktu yang tidak teridentifikasi sejak awal tahap perencanaan. Oleh karena itu, tujuan dari penelitian ini adalah mengembangkan standard Work Breakdown Structure (WBS) berbasis risiko pada bangunan utama gedung Stadion dengan kontrak terintegrasi rancang bangun untuk perencanaan biaya dan waktu. Dalam pelaksanaan penelitian ini akan dilakukan identifikasi risiko-risiko yang mempengaruhi perencanaan biaya dan waktu pada suatu pekerjaan konstruksi khususnya bangunan utama gedung Stadion melalui analisis arsip dari berbagai referensi, wawancara, dan validasi pakar yang digunakan untuk pengembangan WBS Stadion. Analisis risiko akan dilakukan secara kualitatif. Hasil penelitian ini menunjukkan bahwa standar WBS bangunan utama gedung stadion dengan kontrak terintegrasi rancang bangun terdiri atas 6 level dan memiliki 14 risiko tertinggi terhadap perencanaan biaya dan waktu. Tindakan preventif dan korektif digunakan untuk meminimalkan dampak risiko tertinggi sebagai dasar pengembangan standar WBS.

One of the classifications of state buildings which is classified as a special building and that its concern in current construction called as Stadium. Nowadays, the implementation of stadium construction in Indonesia, either its new buildings or renovations, some of stadium use an integrated design-build project delivery system because it is considered better in terms of cost and time. However,  the implementation of the Stadium project construction still faced with many problems such as schedule delays, variations of work that are not in line with the planning, cost overrun, claims, and disputes between owner, contractor, as well as the auditor. This problem occurs because there are still many risks related to cost and time that have not been identified since the planning phase. Therefore, the aim of this study is to develop a risk-based Work Breakdown Structure (WBS) standard in an integrated design and build on stadium main building for cost and time planning.  In the implementation of this research, the identification of risks that affect the planning of costs and time in a construction project, especially the stadium main building, will be identified through an archive analysis of various related references that will be used for the development of the WBS Stadium. The risk analysis will be carried out qualitatively. The results of this study indicate that the standard WBS of stadium main building with integrated design-build contract consists of 6 levels and has 14 highest risks to cost and time planning. The preventive and corrective actions are used to minimize the highest risk impact as the basis for standard WBS development.

 

"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Alif Waly Samudra Pandan Arum
"Pembangunan kawasan Ibu Kota Negara (IKN) Nusantara menjadi langkah bagi pemerintah Indonesia untuk mencapai visi Indonesia sebagai negara maju 2045. Pembangunan IKN Nusantara merupakan proyek skala besar yang dalam pembangunannya ditanamkan 8 prinsip yang berisi nilai-nilai dan visi yang harus dijalankan. Proyek pembangunan skala besar masih memiliki masalah terhadap kelebihan waktu dan biaya proyek yang dapat memengaruhi kesuksesan proyek. Masalah kinerja waktu dan kinerja biaya pada proyek pembangunan sebagian besar terjadi pada tahap pelaksanaan proyek. Keterlambatan pengambilan keputusan dan buruknya pemantauan pelaksanaan proyek merupakan faktor yang cukup signifikan terhadap masalah kinerja waktu dan biaya dalam proyek. Hal tersebut mengindikasikan bahwa pelaksanaan proyek pembangunan pada umumnya masih belum efisiensi melalui teknologi. Maka, penelitian ini dilakukan untuk mengatasi masalah-masalah tersebut dengan mengembangkan real-time dashboard untuk pemantauan kinerja waktu dan biaya pelaksanaan pembangunan di IKN. Penelitian ini dilakukan dengan metode analisis studi literatur dan benchmarking, serta dilakukan validasi pakar melalui wawancara. Hasil dari penelitian ini menemukan bahwa indikator-indikator kinerja penting dalam metode Earned Value Management (EVM) dapat dan layak digunakan sebagai indikator untuk melakukan pemantauan kinerja waktu dan biaya yang dapat ditampilkan dalam dashboard. Kerangka kerja real-time dashboard dikembangkan yang terdiri dari 4 tahapan utama, yaitu tahap penginderaan dan pengumpulan data, tahap penyimpanan dan transmisi data, tahap pemrosesan data, dan tahap visualisasi data. Selain itu, dihasilkan model real-time dashboard untuk pemantauan kinerja waktu dan biaya pelaksanaan pembangunan di IKN. Hasil dari kerangka kerja yang dihasilkan dapat meningkatkan pencapaian kinerja waktu dan biaya proyek serta bisa untuk diterapkan secara nyata. Meskipun demikian, hasil kerangka kerja masih belum bisa sepenuhnya otomatis dan secara real-time karena pada tahap pemrosesan data masih terdapat langkah-langkah yang dilakukan secara manual. Sehingga, perlu adanya penelitian lebih lanjut terhadap sistem atau teknologi yang dapat mendukung otomatisasi dapat terjadi sepenuhnya.

In The development of Indonesia’s new national capital city, IKN Nusantara, is a strategic move by the Indonesian government to a to achieve its vision of becoming a develiped country by 2045. The construction of the new national capital city is a large-scale project that incorporates 8 principles encompassing the core values and visions to be upheld. However, large-scale development projects often face challenges related to project delays and cost overruns, which can significantly impact project success. Time and cost performance issues in construction projects mostly arise during the implementation phase. Factors such as delayed decision-making and inadequate project monitoring contribute significantly to these time and cost performance challenges, indicating that the overall implementation of construction projects still lacks efficiency through technology. Therefore, this study 2 Universitas Indonesia aims to address these challenges by developing a real-time dashboard for monitoring the time and cost performance during the implementation of IKN construction. The study adopts a literature analysis method and benchmarking, also incorporates expert validation through interviews. The research findings reveal that key performance indicators in the Earned Value Management (EVM) method can effectively be used as indicators for monitoring time and cost performance, which can be displayed through the dashboard. A framework for the realtime dashboard is developed, consisting of four main stages: data sensing and collection, data storage and transmission, data processing, and data visualization. Additionally, a real-time dashboard model is generated for monitoring the time and cost performance during the IKN construction. The results of the framework have the potential to enhance the achievement of project time and cost performance and can be implemented in practical settings. However, it is important to note that the framework is not yet fully automated and real-time, as there are still manual steps involved in the data processing stage. Therefore, further research is needed to explore systems or technologies that can fully support automation."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Ghazali, aurhor
"Peningkatan pembangunan infrastruktur yang cukup signifikan berbanding lurus dengan peningkatan angka kecelakaan di sektor konstruksi sehingga menjadikannya salah satu sektor yang paling rawan kecelakaan dibandingkan sektor lainnya. Artinya, audit keselamatan konstruksi yang ada belum efektif dalam mencegah kecelakaan. Biasanya, audit hanya dilakukan pada tahap konstruksi dan jarang dilakukan pada tahap desain. Menurut teori Szymberski, tindakan yang dilakukan pada tahap desain lebih berpengaruh signifikan terhadap terjadinya kecelakaan dibandingkan tindakan yang dilakukan pada tahap konstruksi. Untuk itu diperlukan model audit keselamatan konstruksi yang terintegrasi tahap perancangan dan pembangunan. Penelitian ini mengusulkan penerapan metode Business Process Model and Notation (BPMN) sebagai kerangka kerja untuk visualisasi dan strukturisasi proses audit. Melalui analisis literatur dan studi lapangan, proses kritis dalam audit keselamatan konstruksi direpresentasikan dalam diagram BPMN. Pengembangan model ini diharapkan dapat memberikan panduan yang jelas untuk meningkatkan komunikasi dan kolaborasi stakeholder, sehingga audit keselamatan konstruksi dapat efektif dalam mitigasi risiko kecelakaan konstruksi.

The significant increase in infrastructure development is directly proportional to the increase in the number of accidents in the construction sector, making it one of the most accident-prone sectors compared to other sectors. This means that existing construction safety audits have not been effective in preventing accidents. Usually, audits are only conducted at the construction stage and rarely at the design stage. According to Szymberski's theory, actions taken at the design stage have a more significant effect on the occurrence of accidents than actions taken at the construction stage. Therefore, a construction safety audit model that integrates the design and construction stages is needed. This research proposes the application of the Business Process Model and Notation (BPMN) method as a framework for visualizing and structuring the audit process. Through literature analysis and field study, the critical processes in construction safety audit are represented in BPMN diagram. The development of this model is expected to provide clear guidance to improve stakeholder communication and collaboration, so that construction safety audits can be effective in mitigating construction accident risks."
Jakarta: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Alif Waly Samudra Pandan Arum
"Pembangunan kawasan Ibu Kota Negara (IKN) Nusantara menjadi langkah bagi pemerintah Indonesia untuk mencapai visi Indonesia sebagai negara maju 2045. Pembangunan IKN Nusantara merupakan proyek skala besar yang dalam pembangunannya ditanamkan 8 prinsip yang berisi nilai-nilai dan visi yang harus dijalankan. Proyek pembangunan skala besar masih memiliki masalah terhadap kelebihan waktu dan biaya proyek yang dapat memengaruhi kesuksesan proyek. Masalah kinerja waktu dan kinerja biaya pada proyek pembangunan sebagian besar terjadi pada tahap pelaksanaan proyek. Keterlambatan pengambilan keputusan dan buruknya pemantauan pelaksanaan proyek merupakan faktor yang cukup signifikan terhadap masalah kinerja waktu dan biaya dalam proyek. Hal tersebut mengindikasikan bahwa pelaksanaan proyek pembangunan pada umumnya masih belum efisiensi melalui teknologi. Maka, penelitian ini dilakukan untuk mengatasi masalah-masalah tersebut dengan mengembangkan real-time dashboard untuk pemantauan kinerja waktu dan biaya pelaksanaan pembangunan di IKN. Penelitian ini dilakukan dengan metode analisis studi literatur dan benchmarking, serta dilakukan validasi pakar melalui wawancara. Hasil dari penelitian ini menemukan bahwa indikator-indikator kinerja penting dalam metode Earned Value Management (EVM) dapat dan layak digunakan sebagai indikator untuk melakukan pemantauan kinerja waktu dan biaya yang dapat ditampilkan dalam dashboard. Kerangka kerja real-time dashboard dikembangkan yang terdiri dari 4 tahapan utama, yaitu tahap penginderaan dan pengumpulan data, tahap penyimpanan dan transmisi data, tahap pemrosesan data, dan tahap visualisasi data. Selain itu, dihasilkan model real-time dashboard untuk pemantauan kinerja waktu dan biaya pelaksanaan pembangunan di IKN. Hasil dari kerangka kerja yang dihasilkan dapat meningkatkan pencapaian kinerja waktu dan biaya proyek serta bisa untuk diterapkan secara nyata. Meskipun demikian, hasil kerangka kerja masih belum bisa sepenuhnya otomatis dan secara real-time karena pada tahap pemrosesan data masih terdapat langkah-langkah yang dilakukan secara manual. Sehingga, perlu adanya penelitian lebih lanjut terhadap sistem atau teknologi yang dapat mendukung otomatisasi dapat terjadi sepenuhnya.

In The development of Indonesia’s new national capital city, IKN Nusantara, is a strategic move by the Indonesian government to a to achieve its vision of becoming a develiped country by 2045. The construction of the new national capital city is a large-scale project that incorporates 8 principles encompassing the core values and visions to be upheld. However, large-scale development projects often face challenges related to project delays and cost overruns, which can significantly impact project success. Time and cost performance issues in construction projects mostly arise during the implementation phase. Factors such as delayed decision-making and inadequate project monitoring contribute significantly to these time and cost performance challenges, indicating that the overall implementation of construction projects still lacks efficiency through technology. Therefore, this study 2 Universitas Indonesia aims to address these challenges by developing a real-time dashboard for monitoring the time and cost performance during the implementation of IKN construction. The study adopts a literature analysis method and benchmarking, also incorporates expert validation through interviews. The research findings reveal that key performance indicators in the Earned Value Management (EVM) method can effectively be used as indicators for monitoring time and cost performance, which can be displayed through the dashboard. A framework for the realtime dashboard is developed, consisting of four main stages: data sensing and collection, data storage and transmission, data processing, and data visualization. Additionally, a real-time dashboard model is generated for monitoring the time and cost performance during the IKN construction. The results of the framework have the potential to enhance the achievement of project time and cost performance and can be implemented in practical settings. However, it is important to note that the framework is not yet fully automated and real-time, as there are still manual steps involved in the data processing stage. Therefore, further research is needed to explore systems or technologies that can fully support automation."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rahmat Hidayat
"Bekisting merupakan bagian yang menjadi unsur penting dalam suatu proyek konstruksi gedung bertingkat karena menghabiskan biaya terbesar dalam pekerjaan struktur bertingkat yang tipikal. Metode Block Out merupakan inovasi yang dimiliki PT. PP yang menjadi pilihan dalam pekerjaan bekisting. Pada penelitian ini akan dianalisa bagaimanakah perbandingan antara Metode Block Out yang dimiliki PT. PP dengan Metode Bekisting Konvensional ditinjau dari segi biaya dan waktu pada pekerjaan kolom. Data yang akan dianalisis didapatkan dari narasumber yang menjadi praktisi di bidang konstruksi. Hasil dari penelitian ini adalah metode out lebih murah dibandingkan metode konvensional dengan penghematan Rp 567.721.928,19 atau Rp 113.544.385,64 / lantai sehingga efisiensi biaya yang dapat dilakukan sebesar 20,6%. Metode block out lebih cepat dibandingkan dengan metode konvensional dengan durasi 12 hari.

Formwork is one part of high rise building construction that becomes an important element of a project because it consumes the largest cost in a typical multi-storey structural job. Block Out is a method innovated by PT. PP that can be used as an option in doing formwork. This research will analyze the comparison between Block Out Method and Conventional Formwork Method in cost and time’s prespective when working on column installation. The data that will be analyzed are obtained from sources who are practitioners in construction project. The hypothesis of this study is that Block Out Method, compared to Conventional Formwork Method, is cheaper in its construction cost and faster in its execution time. The goal of this report is Block Out Method is cheaper than Conventional Metode with thrift IDR 576.721.928,19 or IDR 113.544.385,64 / floor. So, efficiently cost that could to apply is 20,6%. And, Block Out Method is faster than Conventional Method that have 12 days duration.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
S57698
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>