Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 129667 dokumen yang sesuai dengan query
cover
Ovy Dwi Ananto
"The construction project have the phase that include the sub-structure and upper structure. In sub structure, it is essential that the sub structure construction, particularly in basement construction close with the earth moving operational with the specific job site conditional.
The excavation in basement construction involve in big resource in equipment and labor where the resources mainly was effected in an environmental of the project. In the environmental job site will a rises the risk factors considered in the operational. The risk factors can be the internal and external, so that the earth moving operational with hydrolic excavator and dump trucks need decision in good consideration however because of the complexity in activity properly in equipment utilization.
Learning development process to equipment productivity in earth moving and excavation operational resulting in the specific identification in consider the risk who is very unique and different from a constructing to another. The qualified identification of risk factors can be necessary in the early progress because leads in construction. Progress of excavation phase in order to get the lowest equipment cost and higher productivity can be reached.
This research describe the main risk factors effected the equipment productivity. From this step, however the actual activities in order to risk analyze is needed."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T751
UI - Tesis Membership  Universitas Indonesia Library
cover
Andri Hermawan
"Dalam pelaksanaan konstruksi Basement, peralatan konstruksi merupakan sumber daya proyek yang penting, karena keberadaan peralatan tersebut sangat diperlukan dalam pekerjaan penggalian tanah. Oleh karena itu, perlu diatur seefisien mungkin agar perbandingan antara masukan dan keluaran yang disebut produktivitas menjadi optimal sehingga. Penelitian bertujuan untuk mengetahui faktor-faktor dominan yang berpengaruh terhadap kinerja produktivitas alat berat pada pekerjaan penggalian Basement dan mengetahui rekomendasi untuk peningkatan kinerja produktivitas alat berat tersebut. Tahapan penelitian adalah mengumpulkan data kuisioner, selanjutnya dianalisis dengan SPSS. Hasil penelitian adalah faktor dominan yaitu (X56) pendanaan dalam biaya perbaikan alat, kesesuaian metode kerja dengan rencana selama beroperasi (X29) dan tingkat kesediaan mekanik dibanding dengan jumlah operator alat (X70), dan model persamaan : Y = 9,196 + 1,681 X56 + 1,507 X29 + 0,681 X70.

In Basement construction, construction equipment is an important resource project, due to the existence of such equipment is needed in the work of excavation of land. Therefore, should be regulated as efficiently as possible so that the ratio between input and output is called the optimal productivity. The research aims to identify the dominant factors that influence the productivity performance of heavy equipment on Basement excavation work and know the recommendations for improved productivity performance of equipment. Our research is to collect questionnaire data, and analyzed by SPSS. The results showed that the dominant factor is (X56) for funding the cost of repair tools, conformance with the plan of working methods during operation (X29) and the level of readiness compared with the amount of mechanical equipment operators (X70), and the model equation : Y = 9.196 + 1.681 X56 + 1.507 X29 + 0.681 X70."
Depok: Fakultas Teknik Universitas Indonesia, 2010
S50587
UI - Skripsi Open  Universitas Indonesia Library
cover
Deddy Gusnadi
Depok: Fakultas Teknik Universitas Indonesia, 2004
TA3429
UI - Tugas Akhir  Universitas Indonesia Library
cover
Deddy Gusnadi
"Secara umum proyek konstruksi mempunyai kegiatan yang kompleks dan memiliki unsur ketidakpastian sehingga mengandung resiko. Tdak terkecuali juga dengan proyek jalan tol. Dimana resiko-resiko yang diterima proyek selama masa konstruksi berpotensi mempengaruhi kinerja proyek, termasuk kinerja biaya pelaksanaan proyek.
Untuk mengetahui resiko apa yang berpotensi memberikan pengaruh terhadap kinerja biaya pelaksanaan diperlukan manajemen resiko sebagai pendekatan untuk mengelola resiko. Identifikasi resiko selama masa pelaksanaan diperlukan untuk mengetahui resiko apa yang berpotensi mempengaruhi kinerja biaya pelaksanaan. Dengan demikian akan diperoleh tingkat prioritas masing-masing resiko, sehingga dapat dievaluasi dan diperoleh tindakan penanganan yang tepat (alokasi resiko).
Hasil penelitian menunjukkan bahwa tindakan penanganan yang dilakukan oleh pihak kontraktor terhadap resiko cenderung berbeda. Ini menunjukkan bahwa belum diterapkannya prosedur yang baku terhadap pengelolaan resiko. Untuk itu diharapkan kontraktor jalan tol untuk menerapkan prosedur pengelolaan resiko yang baku.

In general the project of construction have complex activity and have uncertainty element so that contain risk. Do not aside from also with project of turnpike. Where accepted risks the projects of during a period of construction have potency to influence performance of is project of, including performance is expense of execution of project.
To know risk what have potency to give influence to performance is expense of execution needed by risk management as approach to manage risk Identify risk during a period of execution needed to know risk what have potency to influence performance of is expense of execution. Thereby will be obtained by priority level of is each risk, so that can evaluate and obtained by handling action which is accept risk allocation.
Handling action conducted by contractor party to risk tend to differ. This indicates that not yet applied of standard procedure to management of risk. Is for that expected by turnpike contractor to apply procedure management of standard risk.
"
Depok: Fakultas Teknik Universitas Indonesia, 2004
T14787
UI - Tesis Membership  Universitas Indonesia Library
cover
Herry Eko Priyono
"Persaingan dunia usaha konstruksi perlu ditingkatkan dalam menangani proyek-proyek perumahan di masa yang akan datang. Proyek pembangunan perumahan layak huni di wilayah Jabotabek sudah saatnya menerapkan pengendalian waktu, mutu dan biaya yang handal. Manajemen resiko tersebut diterapkan selama masa pelaksanaan proyek untuk mengatasi berbagai masalah manajemen, prosedur dan aplikasi proses pelaksanaannyaa.
Penerapan manajemen resiko secara terstruktur dan baku akan bermanfaat untuk mengetahui resiko-resiko yang berpengaruh terhadap kinerja proyek sehingga dapat dicarikan cara-cara penanganan proyek secara tepat. Dalam rangkan pembuktian secara hipotesa, penulis melakukan penelitian terhadap beberapa proyek perumahan yang telah selesai dan dengan menggunakan minimal 20 responden (sampel) pembangunan rusun dan apartemen yang menggunakan sistem tunnel form dengan menggunakan 27 variabel bebas dan 1 variabel terikat (kinerja waktu).
Dari hasil analisa terhadap sampel dan variabel dengan dibantu oleh SPSS versi 10 diperoleh 2 variabel penentu untuk model persamaan liniernya, yaitu keterlambatan pembayaran pihak owner dan keterlambatan pembayaran kantor wilayah kepada subkontraktor/supplier. Dari hasil analisa juga didapatkan bahwa kualitas identifikasi faktor resiko berkorelasi positif terhadap kinerja waktu, atau dengan kata lain identifikasi faktor resiko pada tahap pelaksanaan dapat meningkatkan kinerja waktu. Referensi tersebut dapat kita gunakan pada pembelajaran proyek-proyek yang akan datang."
Depok: Fakultas Teknik Universitas Indonesia, 2003
T 5949
UI - Tesis Membership  Universitas Indonesia Library
cover
Indra Patuan I.
Depok: Fakultas Teknik Universitas Indonesia, 2005
S35207
UI - Skripsi Membership  Universitas Indonesia Library
cover
Preta Vania Kartika Putri
"Tujuan penelitian ini adalah menetukan tindakan preventif dan korektif dan memperlihatkan kecenderungan pengaruhnya terhadap kinerja waktu dari faktor penyebab risiko struktur bawah yang dominan. Penyebab risiko struktur bawah yang dominan mengacu pada penelitian Galuh Rizma, 2011 berjudul Manajemen Risiko Biaya dan Waktu Pekerjaan Struktur Bawah dari Proyek Bangunan Bertingkat Tinggi di Jakarta. Penelitian dilakukan dengan survey kepada kontraktor untuk melihat kecenderungan pengaruh secara kualitatif tindakan preventif dan korektif. Hasil penyelidikan ini berupa tindakan preventif dan korektif dari masing-masing penyebab risiko struktur bawah yang dominan dan pengaruhnya terhadap kinerja waktu."
Depok: Fakultas Teknik Universitas Indonesia, 2011
S53408
UI - Skripsi Open  Universitas Indonesia Library
cover
cover
cover
<<   1 2 3 4 5 6 7 8 9 10   >>