Ingkiriwang, Fristi
"Proyek EPC memiliki tiga elemen utama: engineering (rekayasa), procurement (pengadaan) dan contruction (konstruksi) dengan skema kontrak yang menunjuk kontraktor EPC sebagai penanggung jawab tunggal terhadap ketiga elemen tersebut. Pada proyek EPC, fase engineering memegang peranan sangat penting karena fase ini akan menentukan sukses tidaknya pelaksanaan suatu proyek EPC. Penelitian yang sudah dilakukan sebelumnya menunjukkan bahwa penyebab utama delay (keterlambatan) maupun cost overrun (peningkatan biaya) proyek adalah karena adanya kesalahan, kelalaian maupun perubahan desain yang dilakukan pada fase engineering. Fase engineering pada proyek EPC memiliki tiga tahapan utama yaitu FEED (Front End Engineering Design), basic design dan detail engineering. Aktivitas detail engineering pada suatu proyek EPC umumnya menjadi lingkup kontraktor EPC, namun atas pertimbangan terhadap beberapa hal khususnya efisiensi, kontraktor EPC seringkali menyerahkan lingkup pekerjaan detail engineering tersebut kepada pihak ketiga dalam hal ini subkontraktor pekerjaan detail engineering. Terkait dengan adanya proses desain dalam aktivitas engineering terdapat suatu ukuran kinerja yang disebut sebagai kinerja desain. Pengertian kinerja desain adalah efektivitas praktek desain engineering dan manajemen desain dalam suatu perusahaan terhadap tujuan dan sasaran proyek. Pada proyek EPC dimana aktivitas detail engineering diserahkan kepada subkontraktor pekerjaan detail engineering, maka kinerja desain kontraktor EPC akan sangat dipengaruhi oleh kinerja desain subkontraktor pekerjaan detail engineering tersebut. Hasil penelitian ini menunjukkan terdapat empat faktor dominan yang mempengaruhi kinerja desain subkontraktor pekerjaan detail engineering dan berdampak terhadap cost overrun pada proyek EPC yaitu: tingkat automasi; level teknologi dan kompleksitas proyek; kualifikasi subkontraktor pekerjaan detail engineering dan data vendor; kelengkapan definisi lingkup kerja dan praktek review/approval dokumen desain oleh owner.
......EPC project has three basic elements: engineering, procurement and construction with the contract scheme awarding the EPC contractor a single point responsibility for all activities related to these three elements. In EPC projects, engineering phase plays an important role because this phase will determine the success or failure of the project implementation. The previous research has shown that the main sources of project delay and cost overrun are design errors, omissions and changes made during engineering phase. Engineering phase itself has three stages namely FEED (Front End Engineering Design), basic design and detail engineering. Detail engineering activities in an EPC project generally be the scope of the EPC contractor, but on consideration of several things, especially efficiency, EPC contractor often deliver detailed engineering scope of work to a third party in this case detail engineering subcontractor. Associated with the design process in engineering activities there is a measure of performance known as design performance. The definition of design performance is the effectiveness of the engineering design practice and design management in a company to the goals and objectives of the project. In EPC project where detail engineering activities handed over to the detail engineering subcontractor, the design performance of the EPC contractor will be strongly influenced by the design performance of the detail engineering subcontractor. The results of this research indicate there are four dominant factors that affect the design performance of detail engineering subcontractors and impact to cost overrun of the EPC project, they are: the level of automation; the level of technology and complexity of projects; qualifications of detailed engineering subcontractor and vendor data; the completeness of the scope of work definition and practice of design document review/approval by the owner."
Depok: Fakultas Teknik Universitas Indonesia, 2012
T30144
UI - Tesis Open  Universitas Indonesia Library
cover
Manullang, Shinta Theresia
"ABSTRAK
Tesis ini membahas mengenai evaluasi yang dilakukan mahasiswa terhadap
sistem manajemen mutu proyek EPC pada fase perancangan produk detail
engineering yang dikerjakan PT XYZ dengan berbasis manajemen risiko. Tujuan
dari penelitian ini adalah untuk mengetahui faktor-faktor dominan yang
mempengaruhi sasaran mutu fase engineering produk detail engineering.
Penelitian ini dilakukan dengan meneliti aktifitas-aktifitas yang dilakukan pada
proses bisnis dari PT XYZ. Faktor-faktor risiko yang mempengaruhi kinerja mutu
kemudian dianalisis dengan metode SPSS serta risk management.
Hasil dari penelitian ini menunjukkan bahwa terdapat 16 faktor-faktor risiko
dominan (dengan kategori risiko sedang dan tinggi) yang dapat mempengaruhi
kinerja mutu produk proyek EPC pada PT XYZ (studi kasus proyek boiler tank),
dengan risiko tertinggi yaitu X13 dan X37.

ABSTRACT
This thesis discuss about the student?s evaluation of quality management system
of detail engineering at EPC project at PT XYZ in the design phase ? based on
risk management. The purpose of this research is to knowing dominant factor
which can influence the quality performance of PT XYZ. This research conducts
by examine each activities in the business processes of PT XYZ. Based on those
activities, student has found the risk factors which influence the quality
performance of detail engineering?s product that has been produced by PT XYZ.
The outcome of this research shown there is 16 factors which can influence the
quality performance (medium and high category) of EPC project?s products by PT
XYZ (case study boiler tank project), and the highest risks are X13 and X37."
2016
T46817
UI - Tesis Membership  Universitas Indonesia Library