Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 4 dokumen yang sesuai dengan query
cover
Ostwald, Philip F.
Englewood Cliffs, N.J. : Prentice-Hall, 1974
658.155 OST c
Buku Teks  Universitas Indonesia Library
cover
Riza Ayu Dwianisa
Abstrak :
Untuk mendapatkan sebuah proyek EPC, kontraktor harus memenangkan tender proyek dari suatu pelelangan proyek. Proses estimasi biaya merupakan bagian dari keseluruhan proses lelang. Selama tahun 2008, PT.X telah mengikuti 19 tender proyek EPC dan hanya memenangkan enam tender proyek saja. Sehingga perlu diketahui faktor-faktor dalam proses estimasi biaya yang dapat mempengaruhi kinerja pelelangan proyek pada proyek EPC. Dari pengolahan data dengan regresi dan AHP, diperoleh faktor dominan yaitu engineer yang berpengalaman, spesifikasi material dan alat, target profit, alat khusus konstruksi, dan waktu yang tersedia untuk mengikuti lelang proyek EPC. ......For getting a EPC Project, contractor has to win a project in project tender. Cost estimating process is a big part of a tender process. In 2008, PT.X had participated in 19 projects EPC tender and only wins for six projects. So that, factors in cost estimating that influences project EPC tender must be known. After processing data with regression and AHP, founded of prime factors, there are experience engineer, specification of materials and tools, target profit, special tools in construction, and available time tender preparation.
Depok: Fakultas Teknik Universitas Indonesia, 2009
S50511
UI - Skripsi Open  Universitas Indonesia Library
cover
Ahadiat Zulfajriansyah Lamid
Abstrak :
Dalam bisnis perkapalan, galangan kapal harus bisa memperkirakan harga kapal secara akurat. Perkiraan harga diperlukan dalam proses penawaran, perubahan pesanan, dan studi penjualan. Banyak pendekatan perkiraan harga yang ada, berdasarkan pada perhitungan dari kapal-kapal yang dibangun sebelumnya, parameter secara keseluruhan, dan analisa fisika. Perkiraan harga merupakan hal yang cukup sulit di dunia perkapalan. Estimator harga bisa saja kekurangan informasi teknis aktual dan mendapat data yang tidak konsisten. Insinyur perkapalan dan arsitek kapal kebanyakan kekurangan umpan balik dalam konsekwensi harga dari pilihan teknis mereka. Manager sering kekurangan informasi ditandai dari tingkat kepercayaan diri mereka dalam memperkirakan harga dalam pilihan bisnis. Akhirnya, banyak pendekatan dalam memperkirakan harga misterius dan tidak disahkan secara formal (setiap estimator harga mempunyai buku pegangan mereka masing-masing), menyulitkan (memerlukan waktu yang terlalu lama untuk digunakan oleh pembuat pilihan), atau sulit untuk digunakan (kurva yang curam). Tujuan penulisan tugas akhir ini adalah untuk menyediakan pendekatan yang sederhana, yang memudahkan untuk insinyur perkapalan, arsitek kapal dan estimator harga dalam memperkirakan harga kapal. Pendekatan dibuat ini berdasarkan pengamatan dan analisa dari data-data yang didapatkan dari berbagai sumber. ......In shipping business, shipyards must be able to accurately estimate costs. Cost estimating is necessary for the bid process, for change orders, and for tradeoff studies. Numerous cost estimating approaches exist. They are based on extrapolations from previously-built ships, detailed bottoms-up parametrics, and integrated physics-based analyses. Cost estimating can be frustrating to shipyard personnel. Cost estimators may lack timely technical information and face data inconsistencies. Ship engineers and naval architects commonly lack feed-back on the cost consequences of their technical decisions. Managers often lack information denoting the level of confidence in cost estimates upon which they must make business decisions. Finally, many approaches to cost estimating are mysterious and not formally validated (each cost estimator has his own black book), complicated (too time consuming to be of use to decision makers), or difficult to use (steep learning curve). This paper presents an approach that is simple, yet enables instant sharing of cost and technical data among ship engineers, naval architects and cost estimators; gives confidence measures to managers; and is user friendly. The approach is based on several years' development work in support of shipyard engineers, naval architects, and cost estimators.
Depok: Fakultas Teknik Universitas Indonesia, 2009
S51016
UI - Skripsi Open  Universitas Indonesia Library
cover
Jauzy Anbiya
Abstrak :
ABSTRAK
Komponen biaya pembangunan bangunan gedung negara digolongkan kedalam komponen biaya pekerjaan standar dan non-standar. Dalam pelaksanaan suatu proyek konstruksi gedung diperlukan suatu cara agar dalam pelaksanaanya menjadi efisien, sehingga diperlukan penetapan persentase bersifat analitis yaitu dengan pendekatan probabilistic cost estimating untuk mendapatkan range estimate dengan tingkat akurasi estimasi yang tepat. Simulasi permodelan efisiensi dan estimasi masing-masing komponen biaya dilakukan dengan bantuan software Crystall ball, dan diharapkan hasil penelitian ini dapat digunakan sebagai pedoman dalam menentukan dan mengendalikan biaya konstruksi proyek bangunan gedung pada pembangunan selanjutnya.
ABSTARCT
Component of the state building construction costs classified in cost of components and non-standard employment standards. In the implementation of a building construction project needed a way for the implementation to be efficient, so it requires the determination of the percentage that the analytical probabilistic approach for estimating cost estimate range to estimate the exact degree of accuracy. Simulation modeling and estimation of the efficiency of each component is done with the help of software costs Crystall ball, and the expected results of this study can be used as a guide in determining and controlling the cost of construction of building projects on the next construction.
Fakultas Teknik Universitas Indonesia, 2012
S42288
UI - Skripsi Open  Universitas Indonesia Library