"The Influence of Improving Constructability during The Design Phase on the Performance of Construction Project Schedule in Indonesia
Constructability as defined by Construction Industry Institute, Constructability Concepts File, The University of texas at Austin as; the optimum use of construction knowledge and experience during the phases of planning, designing, procurement and construction to achieve the project goal. Constructability involves the thought of how to build a project even before it is designed.
Currently there are three issues which dominate constructability applications; design, layout, and construction method. In order to obtain deeper understanding of the potential application of Constructability for Construction Project implementation, the research focussed on the effect of its key characteristics introduced during the design phase on the performance of Construction Schedules in Indonesia.
Data was obtained through questionnaires from project architects and structural engineers of Consultants in 24 Construction Projects executed during the last decade between 1985 - 1995. Correlation and multiple regression analysis were utilized to establish models on the relation between Constructability variables and Construction Schedule Performance. The degree of completing construction projects as measured by actual against planned time performance proved to be related to Constructability variables in a linear manner.
From the analysis of 48 prospective explanatory Constructability variables during the design phase identified three determinants influencing Construction Schedule Performance. The three significant Constructability variables were; to confirm the filing system (x23), to describe the pre-fabrication system (x43), and to define clearly the contractor limit in design document (x12).
Further research provided additional evidence of the existence of Constructability characteristics through dummy variables which were; to eliminated weather problem (x46)."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T2897
UI - Tesis Membership  Universitas Indonesia Library
cover
Simanjuntak, Sheba Hartaty
"Bangunan konstruksi dapat menghasilkan rancangan yang baik, bila awalnya telah dipikirkan bagaimana cara membangunnya. Kegagalan konsultan perencana memperkirakan bagaimana suatu rancangan dibangun oleh kontraktor dapat menyebabkan permasalahan yang menimbulkan kenaikan biaya dan keterlambatan jadwal pelaksanaan konstruksi. Permasalahan tersebut dapat diselesaikan dengan constructability yaitu dengan melibatkan tenaga ahli konstruksi yang berpengetahuan dan berpengalaman untuk ikut serta dan memberi masukan pada tahap perancangan. Hal ini lebih menjamin agar rancangan disusun dengan menggunakan metode dan teknologi yang dapat diterapkan oleh kontraktor.
Penelitian ini dilakukan dengan mengirimkan kuesioner ke berbagai perusahaan konsultan perencana yang berada di wilayah Jabotabek. Dan hasil penyebaran kuesioner diperoleh 30 kuesioner dan 50 kuesioner yang diterima kembali untuk dianalisis dengan menggunakan program SPSS.
Hasil analisis dengan model regresi berganda dapat menggambarkan adanya hubungan korelasi positif yang sangat kuat antara variabel-variabel peningkatan constructability pada perancangan oleh konsultan perencana dengan kinerja biaya. Model regresi berganda terdiri dari 3 (tiga) variabel penentu yang mempengaruhi kinerja biaya berdasarkan penilaian terhadap sampel dan koordinator proyek dari perusahaan konsultan perencana, yaitu :
1. Menyesuaikan pendekatan rancangan dengan metode konstruksi,
2. Mendefinisikan secara jelas batasan kontraktor dalam dokumen perancangan, dan
3. Secara aktif meminta masukan dari personil konstruksi pada setiap tahapan dan proses perancangan.
Dan hasil penelitian ini, peningkatan constructability pada perancangan dapat digunakan untuk menghasilkan kualitas rancangan yang dapat meningkatkan kinerja biaya pada pelaksanaan proyek-proyek konstruksi di Indonesia di masa mendatang.

Influence of Constructability Improvement in Design Phase to Project Cost Performance of Construction Projects in IndonesiaConstruction building could to products a good design, if the early to think how in manner to be constructed. Failure of designer to consider how the design should be implemented by contractor can result in scheduling problems and delays during the construction process. That problems could be solved with constructability namely by the construction expert involved who had knowledge and experience to joint and seek construction input in design. This has more to warrant in order that design to arrange by using technology and method that could apply of contractor.
This research has done in the designer companies with sent some questionnaires to several of designer companies in Jabotabek. From questionnaires spread result 30 from 50 questionnaires received to be viable analysis with used SP SS program.
The result of multiple regression analysis model shows that influence constructability improvement in design of designer will improving project cost performance. Multiple regression models has 3 of key variables influencing in cost performance carried out by estimates from persons of construction expert or project coordinator in designer's firm are:
(1) Integrate design approach with construction method,
(2) Clearly define contractor interface in the design document, and
(3) Actively seek construction input to all stages of the design process.
From these research resulted, construction improvement in design can be used to obtain the quality of design result that cost performance can be improvement in operation of projects construction in the future of Indonesia construction project.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Erman Surya Bakti
"Meningkatnya persaingan dan tuntutan efisiensi pada industri konstruksi menuntut adanya pengendalian mutu yang dikombinasikan dengan aspek ekonomis dan jadwal proyek. Hal ini memotivasi berbagai penelitian yang menghasilkan teknik-teknik peningkatan mutu dan efisiensi/efektifitas dari sebuah proyek seperti total quality management, value engineering, designability, contractability, constructability, operability, maintainability dan sebagainya. Penelitian ini bertujuan untuk mengetahui dan menganalisa salah satu peningkatan mutu proyek konstruksi yaitu penerapan peningkatan constructability pada tahap perencanaan dan perancangan proyek. Pendekatan ini dilakukan karena besarnya pengaruh perencanaan dan perancangan terhadap kualitas, biaya dan waktu pelaksanaan proyek secara keseluruhan. Pelaksanaan penelitian studi kasus ini dilakukan pada sebuah perusahaan nasional yang bergerak di bidang industri konstruksi dengan pola design and build dimana penelitian difokuskan pada pemahaman, pelaksanaan, keuntungan, dan hambatan constructability di perusahaan tersebut dan dua buah proyek yang dijadikan studi kasus. Jenis penerapan constructability secara informal yang didapat pada studi kasus ini diindikasikan oleh tidak adanya prosedur tertulis tentang constructability, rendahnya tingkat lesson learned, tidak adanya koordinator constructability yang ditunjuk secara resmi, masih banyaknya hambatan pelaksanaan dan tidak adanya pencatatan kinerja constructability. Walaupun demikian pada pelaksanaan constructability secara informal ini, bahwa penerapan constructability pada tahap perencanaan dan perancangan terbukti meningkatkan kinerja proyek konstruksi, dengan variabel yang paling berpengaruh adalah penjadwalan berdasarkan construction sensitive dan fasilitas desain dalam mengefisienkan konstruksi."
Depok: Fakultas Teknik Universitas Indonesia, 2002