Analisa peranan konsultan quantity surveyor dalam proses pengendalian biaya akibat change order pada proyek konstruksi dengan metode AHP = Analysis of quantity surveyor consultant role cost control in the pprocess as a result of change order on construct / ion projects with the AHP method
Ersa Irawan;
Yusuf Latief, supervisor; Bambang Setiadi, supervisor; Asiyanto, examiner; Rosmariani Arifuddin, examiner
(Fakultas Teknik Universitas Indonesia, 2015)
|
Salah satu permasalahan yang sering terjadi di dalam pelaksanaan suatu proyek konstruksi bangunan gedung secara umum, yaitu timbulnya suatu perubahan perubahan pekerjaan, perubahan-perubahan pekerjaan ini biasa disebut dengan istilah change order atau variation order. Perubahan pekerjaan yang bersifat signifikan dan berskala besar akan mempengaruhi kinerja biaya secara keseluruhan. Untuk itu diperlukan usaha untuk meminimalkan dampak dari change order terhadap kinerja biaya. Salah satu usaha yang dilakukan oleh pemilik proyek dalam pengendalian biaya akibat adanya pekerjaan change order yaitu dengan menggunakan jasa konsultan Quantity Surveyor didalam pelaksanaan proyek konstruksi.Skripsi ini membahas mengenai peranan konsultan Quantity Surveyor dalam proses pengendalian biaya akibat adanya pekerjaan change order pada proyek konstruksi dan skripsi ini juga membahas mengenai faktor-faktor apa saja yang menyebabkan terjadinya change order dilihat dari sisi penyebab terjadinya.Penelitian dilakukan dengan cara penyusunan dan penyebaran kuesioner berupa pertanyaan-pertanyaan yang berhubungan dengan penelitian. Metode yang digunakan untuk menganalisa data yaitu dengan metode AHP (Analitycal Hierarchy Process). One of the problems that often occur in the implementation of a building construction project in general, the emergence of a job changes, job changes are commonly referred to as change order or variation order. Changes in work that is significant and large scale will affect the overall cost performance. It required an effort to minimize the impact of the change order to the performance fee. One of the efforts made by the owner of the project cost control due to the change order work is by using the services of a consultant Quantity Surveyor in the implementation of construction projects.This thesis discusses the role of consultant Quantity Surveyor in the process of cost control due to the change order work on construction projects and this paper also discusses about what are the factors that caused the change order in terms of cause. The study was conducted by preparing and distributing the questionnaire in the form of questions related to research. The method used to analyze the data, namely the AHP method (Analitycal Hierarchy Process). |
S61721-Ersa Irawan.pdf :: Unduh
|
No. Panggil : | S61721 |
Entri utama-Nama orang : | |
Entri tambahan-Nama orang : | |
Subjek : | |
Penerbitan : | Depok: Fakultas Teknik Universitas Indonesia, 2015 |
Program Studi : |
Bahasa : | ind |
Sumber Pengatalogan : | LibUI ind rda |
Tipe Konten : | text |
Tipe Media : | unmediated ; computer |
Tipe Carrier : | volume ; online resource |
Deskripsi Fisik : | xii, 97 pages : illustration ; 28 cm |
Naskah Ringkas : | |
Lembaga Pemilik : | Universitas Indonesia |
Lokasi : | Perpustakaan UI, Lantai 3 |
No. Panggil | No. Barkod | Ketersediaan |
---|---|---|
S61721 | 14-22-80739947 | TERSEDIA |
Ulasan: |
Tidak ada ulasan pada koleksi ini: 20425337 |