Ersa Irawan, author
Analisa peranan konsultan quantity surveyor dalam proses pengendalian biaya akibat change order pada proyek konstruksi dengan metode AHP = Analysis of quantity surveyor consultant role cost control in the pprocess as a result of change order on construct / ion projects with the AHP method
Fakultas Teknik Universitas Indonesia, 2015
 UI - Skripsi (Membership)
Hendra Radiansyah, author
Analisa biaya perhitungan track access charge pada perkeretaapian Indonesia dengan metode marginal cost plus markup = Cost analysis of track access charge calculation on Indonesian railways with marginal cost plus markup method
Fakultas Teknik Universitas Indonesia, 2014
 UI - Skripsi (Membership)
Megaputra Dirgantara, author
Analisa biaya perhitungan track access charge (TAC) pada perkeretaapian Indonesia dengan metode full cost (FC) = Analysis of calculation track access charge (TAC) in Indonesian railways with full cost FC method
Fakultas Teknik Universitas Indonesia, 2014
 UI - Skripsi (Membership)
Ditto Ferakhim, author
Analisa Komponen Biaya Penerapan K3 Untuk Pekerjaan Arsitektur Pada Proyek Bangunan Gedung Rumah Susun Sewa Di Kementerian Pekerjaan Umum Dan Perumahan Rakyat Berbasis Work Breakdown Structure = Components Analysis of Safety Cost Implementation for Architectural Work In Rental Apartments Projects in The Ministry Of Public Works and Housing Based on Work Breakdown Structure
Fakultas Teknik Universitas Indonesia, 2019
 UI - Tesis (Membership)
Dimas Adi Prasetyo, author
Perbedaan biaya antara metode padat alat dan padat karya dalam pekerjaan tanah di proyek Jembatan Selanggis = Identification of cost consumption differences between heavy equipment and labor intensive method in road work at Selangis Bridge project
Fakultas Teknik Universitas Indonesia, 2015
 UI - Skripsi (Membership)
<<   1 2 3   >>