Yulida Resy Zarvani, author
Analisa Faktor Penyebab Klaim pada Proyek Konstruksi denganKontrak Design and BuildterhadapKinerja Biaya dan Waktu Proyek(Studi Kasus Proyek XXX) = Analysis of Factors Causing Claims in Construction ProjectswithDesign and BuildContract for The Project Cost andTimePerformance (Case Study of Project XXX
2016
 UI - Skripsi (Membership)
Evelyn Monica Thamrin, author
Evaluasi sistem kontrak rancang bangun pada proyek mixed use building berbasis standard contract management body of knowledge = Evaluation design and build contract system in mixed used project based on standard contract management body of knowledge / Evelyn Monica Thamrin
2017
 UI - Tesis (Membership)
Panji Nur Abdurrachman, author
Kemitraan Pemerintah-swasta dalam bentuk Build Operate and Transfer (BOT): Studi kasus perjanjian pemanfaatan lahan jalan tol sebagai tempat istirahat
Universitas Indonesia, 2008
 UI - Skripsi (Open)
Prilly Octavia, author
Identifikasi faktor-faktor risiko terhadap kinerja waktu proyek rancang bangun design and build pada PT XXX yang ditinjau dari sisi pelaksana proyek = Identification of risk factors for time performance of design and build project at PT XXX that looked from contractor's side
Fakultas Teknik Universitas Indonesia, 2014
 UI - Skripsi (Membership)
Mandala Utama, author
Faktor-faktor yang berpengaruh dalam proses perancangan arsitektur terhadap kinerja waktu (Studi kasus pada perusahaan konsultan arsitektur 'X' di DKI Jakarta tahun 2007) = Affecting factors in architecture design process to time performance. (Case study in architecture firm 'X' at DKI Jakarta 2007)
Fakultas Teknik Universitas Indonesia, 2008
 UI - Tesis (Open)
<<   2 3 4   >>