Heru Andraiko St, author
Pengembangan konsep waste management material konstruksi untuk meningkatkan kinerja biaya proyek bangunan gedung di PT X = Concept of development waste management system to improve performance construction material cost on building project at PT X
Fakultas Teknik Universitas Indonesia, 2014
 UI - Tesis (Membership)
Mutia Zahrina Putri, author
Pengembangan kompetensi tim proyek berbasis risiko dalam rangka meminimalisir rework agar meningkatkan kinerja biaya pada proyek konstruksi bangunan gedung di PT. X = Development of project team competencies risk based in order to minimize rework and improve cost performance in building construction project PT. X
Fakultas Teknik Universitas Indonesia, 2018
 UI - Tesis (Membership)
Arief Hendratno, author
Pengaruh Biaya Pekerjaan Temporary Terhadap Kinerja Biaya Akhir Proyek Pada Pembangunan Gedung Pabrik Di PT. X = Effect of temporary work to final cost performance project at building factory in PT. X
Fakultas Teknik Universitas Indonesia, 2011
 UI - Tesis (Open)
Resi Aseanto, author
Stakeholder manajemen pada proyek pembangunan pipa gas terhadap kinerja waktu dan biaya di PT. XYZ yang berbasis PMBOK = Stakeholder management on gas pipeline construction project against time and cost performance at PT. XYZ based on PMBOK / Resi Aseanto
Fakultas Teknik Universitas Indonesia, 2014
 UI - Tesis (Membership)
Hari Kurniawati, author
Pengaruh kualitas manajemen biaya material terhadap kinerja akhir proyek bangunan gedung tinggi pada PT X
Fakultas Teknik Universitas Indonesia, 2007
 UI - Tesis (Membership)
<<   1 2 3   >>