Muhammad Khadafi, author
Analisis risiko pengendalian change order berbasis PMBOK 2017 terhadap kinerja biaya pada proyek EPC pipeline = Risk analysis for change order control based on PMBOK 2017 on cost performance at EPC pipeline project
Fakultas Teknik Universitas Indonesia, 2017
 UI - Tesis Membership
Ledi Khalidannisa, author
Simulasi model risiko pengendalian pengadaan jasa subkontraktor piping berdasarkan PMBOK 2013 untuk meningkatkan kinerja biaya pada proyek EPC = Simulation risk modelling in controling procurement for piping subcontractor according to PMBOK 2013 to improve cost performace in EPC projects
Fakultas Teknik Universitas Indonesia, 2015
 UI - Tesis Membership
Firmansyah, author
Analisis risiko pada pipa bawah laut 16" main oil line mol efpro - ekom di Laut Jawa tahun 2016 = Risk analysis of subsea pipeline 16" main oil line mol efpro ekom located at Java Sea in 2016
Fakultas Kesehatan Masyarakat Universitas Indonesia, 2016
 UI - Tesis Membership
M. Andi Firdaus, author
Pengembangan sistem perencanaan manajemen proyek di Kementerian X berbasis PMBOK untuk meningkatkan kualitas perencanaan yang berdampak terhadap kinerja waktu = The development for project planning management in ministry of X with pmbok as its basis to enhance the quality planning that will affect in time performance
Fakultas Teknik Universitas Indonesia, 2016
 UI - Tesis Membership
Miftah Faridh, author
Pengendalian ruang lingkup berbasis risiko dari sisi kontraktor pada proyek EPC power plant untuk meminimalisir deviasi biaya akibat perubahan ruang lingkup = Risk based control scope from contractor s side on EPC power plant project to minimize cost deviation due to changes in scope
Fakultas Teknik Universitas Indonesia, 2015
 UI - Tesis Membership
<<   1 2 3   >>