Kemal Sandianugraha
Analisa tarif tol berdasarkan studi willingness to pay. Studi kasus: Rencana Jalan Tol Lingkar Luar (JORR II) ruas Cengkareng-Kunciran = Analysis of toll rates based on willingness-to-pay studies. Case study Jakarta Outer Ring Highway Plan (JORR II) Cengkareng-Kunciran segment
Fakultas Teknik Universitas Indonesia, 2010
 UI - Skripsi Open
Salman Farisi
Analisa tarip tol berdasarkan studi willingess to pay. Studi kasus rencana Jalan Tol Lingkar Luar (JORR II) ruas Kunciran-Serpong = Analysis of toll fare based on willingness to pay method. Study case Jakarta Outer Ring Road II (JORR) Kunciran-Serpong segment
Fakultas Teknik Universitas Indonesia, 2010
 UI - Skripsi Open
Niky Nathaniel
Analisa kapasitas jalan bebas hambatan berdasarkan studi kasus rencana Jakarta Outer Ring Road II ( JORR ) ruas Serpong - Cinere dengan metode US - HCM 2000 = Analyze capacity of Jakarta Outer Ring Road II (JORR II) freeway in segment Serpong - Cinere with US-HCM 2000 method / Niky Nathaniel
2010
 UI - Skripsi Open
Ryandika
Analisis tarif tol dengan metode stated preference. Studi kasus jalan tol JORR II Segmen Serpong-Cinere
Fakultas Teknik Universitas Indonesia, 2011
 UI - Skripsi Open
Tobing, Ryanto
Studi kapasitas jalan bebas hambatan Jakarta Lingkar Luar II (JORR II) pada ruas Kunciran- Serpong dengan metode US - HCM 2000 = Study capacity of Jakarta Outer Ring Road II (JORR II) freeway at segment Kunciran-Serpong with US-HCM 2000 method
Fakultas Teknik Universitas Indonesia, 2010
 UI - Skripsi Open