Farid Kasmi
Identifikasi faktor-faktor dominan dalam manajemen komunikasi proyek EPC antara kontraktor (PT. X) dan pemilik proyek pada tahap engineering terhadap kinerja waktu = Identification of dominant factors in communication management of epc project between the contractor (PT.X) and the owner during phase of engineering that influence time performance
Fakultas Teknik Universitas Indonesia, 2008
 UI - Skripsi (Open)
Farid Kasmi
Identifikasi faktor-faktor dominan dalam manajemen komunikasi proyek EPC antara kontraktor (PT. X) dan pemilik proyek pada tahap engineering terhadap kinerja waktu = Identification of dominant factors in communication management of epc project between the contractor (PT.X) and the owner during phase of engineering that influence time performance
Fakultas Teknik Universitas Indonesia, 2008
 UI - Skripsi (Open)
Rajagukguk, Basaria, examiner
Analisis Faktor-Faktor Pemborosan Biaya pada Fase Perancangan Proyek EPC dengan Lean Thinking (Studi Kasus PT. XYZ) = Analysis of Waste of Cost Factors During Engineering Phase of EPC Project with Lean Thinking (Case Study: PT. XYZ).
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2020
 UI - Tesis (Membership)
Aulia Rizky Tansir
Analisis risiko pada tahap purchasing dalam proyek EPC (engineering procurement construction) pabrik yang berpengaruh terhadap kinerja waktu (studi kasus PT A) = Risk analysis on purchasing phase in EPC (engineering procurement construction) factory plant project that influence time performance (case study PT.A)
Fakultas Teknik Universitas Indonesia, 2015
 UI - Skripsi (Membership)
Manullang, Shinta Theresia
Evaluasi sistem manajemen mutu proyek EPC dalam fase engineering produk detail engineering berbasis manajemen risiko pada PT. XYZ (studi kasus proyek boiler tank) = Evaluation of quality management system EPC project in engineering phase for detail engineering product based on risk management at PT XYZ (case study boiler tank project) / Shinta Theresia Manullang
2016
 UI - Tesis (Membership)