Kianty Yunaztia Puteri
Laporan analisis biaya manfaat sumber alternatif augmentasi pasokan air untuk Queensland Tenggara antara proyek desalinasi dan proyek bendungan sungai Katherine = Report on cost benefit analysis of alternative sources of water supply augmentation for South East Queensland between desalination project and Katherine river dam project
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2019
 UI - Makalah dan Kertas Kerja
I Made Anggara Wijayatman
Optimasi biaya dalam penentuan jumlah pekerja pada proses zone picking di gudang distribusi Fast Moving Consumer Goods (FMCG) PT X dengan pendekatan Full Time Equivalent (FTE) dan Integer Linear Programming (ILP) = Cost optimization in determining the number of workers in the zone picking process at PT X Fast Moving Consumer Goods (FMCG) distribution warehouse with Full-Time Equivalent (FTE) and integer linear programming approaches
Fakultas Teknik Universitas Indonesia, 2022
 UI - Tesis (Membership)
Agung Maruli R.N.
Estimasi besarnya cost overruns biaya tenaga kerja akibat pengaruh kualitas perencanaan dan penjadwalan pada konstruksi bangunan bertingkat dengan metode fuzzy
Fakultas Teknik Universitas Indonesia, 2005
 UI - Skripsi (Membership)
Pondaag, Reynard
Evaluasi Standar Kompetensi Quantity Surveyor pada Bangunan Gedung Bertingkat Tinggi Berbasis Risiko untuk Mengurangi Cost Overrun = Evaluation of Quantity Surveyors Competency Standards on High Rise Building Based on Risk to Reduce Cost Overrun
Fakultas Teknik Universitas Indonesia, 2023
 UI - Tesis Membership
Benito Sabastian
Analisis perilaku biaya pada bisnis transfortasi udara sebelum dan saat pandemo covid-19: studi kasus Garuda Indonesia = Analysis of cost behavior in the air transportation business before and during the COVID-19 pandemic: a case study of Garuda Indonesia
Fakultas Ekonomi dan Bisnis Universitas Indonesia , 2021
 UI - Tesis (Membership)