Mirza Arsyad
Implementasi Gate to Gate Life Cycle Assessment (LCA) Pada Pembangkit Listrik Tenaga Uap (PLTU) Berbahan Bakar Batubara = Implementation of Gate-to-Gate Life Cycle Assessment (LCA) of Coal Power Plant
Fakultas Teknik Universitas Indonesia, 2021
 UI - Tesis (Membership)
Ikin Sodikin
Respon risiko keterlambatan pada proyek pembangunan Pembangkit Listrik Tenaga Uap (PLTU) Batubara di Indonesia = Risk response of delay on construction of Steam Coal Fired Power Plant project in Indonesia
Fakultas Teknik Universitas Indonesia, 2013
 UI - Tesis Membership
Nur Asyraf Munif Junaidy Nasser
Strategi greenpeace dalam penolakan kebijakan pembangunan pembangkit listrik tenaga uap berbahan bakar batu bara di Indonesia periode 2014-2018 : studi kasus pembangunan PLTU-B Batang-Jawa Tengah = Greenpeace strategy in challenge of project policy of coal-fired steam power plant in Indonesia period 2014-2018 : case study of project coal-fired steam power plant Batang-Central Java)
Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2018
 UI - Tesis Membership
Wibisana Bagus Santosa
Analisis pendanaan proyek PT. PLN (Persero) studi kasus pembangkit listrik tenaga uap (PLTU) Indramayu = Project financing analysis of PT. PLN (Persero) study case on Indramayu coal-fired power plant project
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012
 UI - Tesis (Open)
Arif Wicaqsana
Analisis pengendalian sumber daya alam batubara yang dilakukan negara untuk kepentingan umum dalam rangka penyediaan tenaga listrik dengan pembangkit listrik tenaga uap berbahan bakar batubara = Analysis of coal natural coal resources control conducted by the state for public interest in regards to electricity power supply with coal fuel steam power plant
2018
 UI - Tesis (Membership)