Almas Kurnia L
Analisa Risiko Pengadaan Material dengan Menggunakan Kontrak Cost Insurance and Freight pada proyek Engineering, Procurement, and Construction terhadap Kinerja Biaya Proyek = Risk Analysis of Procurement using Cost Insurance and Freight Contract on Engineering, Procurement and Construction Project toward Budged Performance
Fakultas Teknik Universitas Indonesia, 2016
 UI - Skripsi (Membership)
Fitri Oktavia Nugroho
Penilaian level kematangan proyek engineering, procurement, and construction (EPC) dengan menggunakan pendekatan sustainable construction = Assessing the maturity level of engineering procurement and construction (EPC) project using sustainable construction approach
Fakultas Teknik Universitas Indonesia, 2016
 UI - Skripsi (Membership)
Aryartha Soepardi
Pengembangan proses perencanaan pengadaan peralatan dan material di proyek engineering procurement construction (epc) untuk peningkatan kinerja waktu = Improvement procurement planning process of equipments and materials in engineering procurement construction (epc) project to enhance time performance
Fakultas Teknik Universitas Indonesia, 2019
 UI - Tesis (Membership)
Buyung Prakarsa Perdana
Pengaruh peran project management office (PMO) pada tingkatan multiple project terhadap kinerja proyek epc = Project management office (PMO) assessment on multiple project level affecting engineering procurement and construction (EPC) project performance
Fakultas Teknik Universitas Indonesia, 2013
 UI - Tesis (Membership)
Runita Listiarini
Identifikasi faktor risiko proses pengadaan jasa subkontraktor yang berpengaruh terhadap kinerja waktu dan biaya pada proyek EPC = Identification risk factor service procurement of subcontractor process that affect time and cost performance on EPC project
Fakultas Teknik Universitas Indonesia, 2014
 UI - Skripsi (Membership)