Utami Rianti
Analisis perbandingan metode AHP, metode evidential reasoning, dan metode terapan on/off dalam pemilihan kontraktor engineering, procurement, and construction = Comparative analysis of AHP method, evidential reasoning method, and applied on/off method in choosing engineering, procurement, and construction contractors / Utami Rianti
2018
 UI - Tesis (Membership)
Wardatul Hamro
Analisis faktor risiko yang berhubungan dengan tekanan darah pada pekerja engineering, procurement, construction (EPC) PT X tahun 2018 = Analysis of risk factors related with blood pressure on workers engineering, procurement, construction (EPC) PT X year 2018
Fakultas Kesehatan Masyarakat Universitas Indonesia, 2018
 UI - Tesis (Membership)
Aulia Rizky Tansir
Analisis risiko pada tahap purchasing dalam proyek EPC (engineering procurement construction) pabrik yang berpengaruh terhadap kinerja waktu (studi kasus PT A) = Risk analysis on purchasing phase in EPC (engineering procurement construction) factory plant project that influence time performance (case study PT.A)
Fakultas Teknik Universitas Indonesia, 2015
 UI - Skripsi (Membership)
Alwin Mulyanto Lokaria
Identifikasi penerapan prinsip-prinsip LEAN construction pada proyek EPC (engineering, procurement, construction) = Identification for implementation of LEAN construction principles on EPC (engineering, procurement, construction project) / Alwin Mulyanto Lokaria
Fakultas Teknik Universitas Indonesia, 2015
 UI - Skripsi (Membership)
Fitri Oktavia Nugroho
Penilaian level kematangan proyek engineering, procurement, and construction (EPC) dengan menggunakan pendekatan sustainable construction = Assessing the maturity level of engineering procurement and construction (EPC) project using sustainable construction approach
Fakultas Teknik Universitas Indonesia, 2016
 UI - Skripsi (Membership)