Heri Surya Nugraha
Pengelolaan resiko dalam proses estimasi biaya tahap desain pada proyek pembangunan jalan layang non tol di DKI Jakarta = Risk management process of cost estimation at design phase non toll fly over project development in DKI Jakarta / Heri Surya Nugraha
Fakultas Teknik Universitas Indonesia, 2014
 UI - Tesis (Membership)
Hendri D.S. Budiono
Method and model development for manufacturing cost estimation during the early design phase related to the complexity of the machining processes
Faculty of Engineering, Universitas Indonesia, 2014
 Artikel Jurnal
Harridi Ilman Tovid
Perancangan aplikasi breakdown untuk estimasi biaya penawaran kontraktor = Designing breakdown application for contractor tender costs estimation
2016
 UI - Skripsi (Membership)
Gultom, Iwan Daniel
Estimasi biaya kontingensi berdasarkan risk register proyek EPC minyak & gas = Estimating cost contingency based on risk register at epc oil & gas project / Iwan Daniel Gultom
2016
 UI - Tesis (Membership)
Jennyvera
Estimasi biaya konseptual pada proyek rusunawa untuk meningkatkan keakurasian dengan mengintegrasikan metode case-based reasoning dan analytical hierarchy process = Conceptual cost estimating in low-cost housing project to improve accuration using integrated method of case- based reasoning and analytical hierarchy process
Fakultas Teknik Universitas Indonesia, 2013
 UI - Tesis Membership