Bakhrul Ulum
Energy and exergy analysis of mount salak geothermal power plant unit 1-2-3
Faculty of Engineering, Universitas Indonesia, 2017
 Artikel Jurnal
Teuku Riefky Harsya
Analisis keekonomian pemanfaatan Kilang LNG Arun sebagai Receiving Gas Terminal di Provinsi Aceh = Economic analysis of LNG Arun refinery plant utilization as a receiving Terminal Gas in Aceh Province
Fakultas Teknik Universitas Indonesia, 2013
 UI - Tesis (Membership)
Adinda Yuanita
Kajian analisis risiko berdasarkan NFPA59A-2009 dan kerangka kerja ISO 31000 untuk pemanfaatan fasilitas LNG Plant Arun menjadi fasilitas Receiving Terminal dan Regasifikasi LNG = Risk analysis study based on NFPA59A-2009 and ISO 31000 framework for utilization of Arun LNG Plant facility as LNG Receiving Terminal and Regasification facility
Fakultas Teknik Universitas Indonesia, 2013
 UI - Tesis (Membership)
Arina Kartika Rizqi
Pemanfaatan dingin LNG untuk air separation unit (ASU) di arun LNGl receiving-hub and regasification terminal = Cold utilization of LNG for air separation unit (ASU) di arun LNG receiving hub and regasification terminal / Arina Kartika Rizqi
2016
 UI - Tesis (Membership)
Nuriz Zaman
Rancangan tahap lanjut LNG receiving terminal untuk fasilitas regasifikasi dan BOG compressor = LNG receiving terminal front end engineering design for regasification facility and BOG compressor
Fakultas Teknik Universitas Indonesia, 2010
 UI - Skripsi (Open)