Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 36332 dokumen yang sesuai dengan query
cover
Cambridge, UK: Harvard University Press, 1967
353.007 2 PRO
Buku Teks  Universitas Indonesia Library
cover
Ott, David J.
Washington, D.C.: The Brookings Institution, 1977
353.007 OTT f
Buku Teks  Universitas Indonesia Library
cover
Kimmel, Lewis H.
Washington, D.C.: The Brookings Institution, 1959
336.73 KIM f
Buku Teks  Universitas Indonesia Library
cover
Earley, Pete
Pasar Minggu, Jakarta: Elsam, 2006
345 EAR w
Buku Teks SO  Universitas Indonesia Library
cover
Dearden, John, 1919-2004
Englewood Cliffs: Prentice-Hall, 1962
658.154 DEA c
Buku Teks SO  Universitas Indonesia Library
cover
Mattessich, Richard
Illinois: Richard D. Irwin, 1964
510.78 MAT s
Buku Teks  Universitas Indonesia Library
cover
Palsrok, John
Bairut s.n. 1968, [date of publication not identified]
351.72 PAL p
Buku Teks  Universitas Indonesia Library
cover
Colm, Gerhard
Washington, D.C. : Brookings Institution , 1969
336.973 COL f
Buku Teks  Universitas Indonesia Library
cover
Noerman Adi Santoso
"Reformasi sistem perencanaan belum dilandasi suatu dasar hukum yang kuat sehingga “rute of the game” tidak pernah tercipta. Ketiadaan perangkat peraturan yang jelas dan mengikat, dapat menyebabkan sistem perencanaan pembangunan nasional tidak akan menghasilkan sinergi dalam berbagai upaya pembangunan di berbagai tingkatan, sektor dan daerah. Reformasi pengelolaan keuangan sektor publik telah mendorong pengembangan pendekatan yang lebih sistematis dalam penganggaran sektor publik. Pendekatan penganggaran di sektor publik dapat berupa line item budgeting, performance budgeting, program budgeting, dan zero-based budgeting
Penyusunan anggaran Tahunan di lingkungan Departemen Hukum dan HAM belum dilaksanakan secara optimal karena adanya hambatan-hambatan yang mempengaruhi proses penyusunan anggaran. Implementasi kebijakan penyusunan anggaran berbasis kinerja yang sudah menjadi kebijakan perencanaan dan penganganggaran masih belum dapat dilaksanakan sepenuhnya di Departemen.
Penelitian yang digunakan dengan menggunakan Metode Penelitian Kualitatif bertujuan untuk mengembangkan pengertian, konsep-konsep, yang pada akhirnya menjadi tahapan yang dikenal sebagai grounded theory research. Sampel yang dipergunakan yaitu pejabat struktural yang bekerja di penyusunan anggaran selama 5 (lima) tahun terakhir. Pengumpulan data melalui wawancara dengan metode observasi dan melalui studi kepustakaan.
Dari hasil mekanisme pelaksanaan penyusunan anggaran tahunan Departemen yang selama ini dilaksanakan, Kendala utama di dalam pelaksanan penyusunan program dan anggaran tahunan departemen yang berbasis kinerja adalah ketidakkonsistenan sistem atau program Software yang diajukan oleh Departemen Keuangan dan keterbatasan prasarana dan sarana khususnya dalam masalah jejaring komunikasi informasi sebagai pendukung percepatan proses penyusunan program dan anggaran tahunan departemen.

Reform the planning system has not driven a strong legal basis that "the rule of The Game" was never created. The absence of a clear set of rules and binding, can lead to national development planning system will not result in synergy in deveiopment efforts at various levels, sectors and regions. Reform of public sector financial management has encouraged the development of a more systematic approach in public sector budgeting. Approach to budgeting in the public sector can be a line item budgeting, performance budgeting, program budgeting, and zero-based budgeting
Annual budgeting within the Ministry of Law and Human Rights are not conducted in an optimal because of the constraints that affect the budgeting process. Policy impiementation of performance-based budgeting that has become budgeting planning policies and still can not be fully implemented in the Department
Research is used by using Qualitative Research Methods aims to develop understanding of concepts, which eventually became known as the stage of grounded theory research. The sample used is structurally officials who worked on drafting the budget for 5 (five) years. Col leding data through interviews and observation methods through the literature study.
From the results of the impiementation mechanism of the annual budget for the Department that was conducted, the main obstacle in the conduct of the preparation of annual budget and program performance-based departments is the inconsistency of the system or Software program proposed by the Ministry of Finance and the iimited infrastructure and facilities, especially in information communication network problems as support the acceleration of the process of drafting the annual budget and program departments.
"
Jakarta: Program Pascasarjana Universitas Indonesia, 2009
T26833
UI - Tesis Open  Universitas Indonesia Library
cover
Budhi Darmawan
"Dalam mengatasi permukiman kumuh Pemrov DKI Jakarta salah satu caranya adalah dengan melakukan Program Bantuan Perbaikan Rumah di Permukiman Kumuh. Program ini menggunakan APBD, yang pada pelaksanaannya sering ditemukan masalah-masalah yang mempengaruhi kinerja anggaran, yang salah satu indikatornya adalah Realisasi Penyerapan Anggaran. Masalah-masalah dapat timbul di setiap kegiatan pada pelaksanaan program tersebut, dimana bisa timbul di fase perencanaan dan fase pelaksanaan. Pada penelitian ini, Pengumpulan data dengan Metode Survey dilakukan untuk mengetahui tingkat frekuensi dan dampak dari variabel Risiko terhadap realisasi penyerapan anggaran dan data tersebut kemudian dianalisis dengan menggunakan software program SPSS. Kemudian dilanjutkan dengan analisis berbasis risiko untuk menghasilkan strategi pengelolaan risiko yang baik sehingga pelaksanaan program itu dapat menyerap anggaran sesuai dengan yang direncanakan.

In Addressing Slum area, Jakarta Provincial Government, one way is by doing housing renovation Assistance Program in slum. This Program uses Public budget that the implementation is often founded problems that influence the performance budget, which is one indicator is Realization of Budget. Problems can arise in any activities on the implementation of the program, which could arise in the planning phase and the implementation phase. In this study, data was collected by survey method was conducted to determine the level of variable frequency and impact of risks to the realization of budget absorption and the data was analyzed using SPSS software. Then proceed with a risk-based analysis to produce a good risk management strategy so that it can absorb the implementation of the program in accordance with the planned budget.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
T43321
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>