Intan Kusumawati
Identifikasi risiko proses pengeboran pada pekerjaan tunnel dengan metode tunnel boring machine proyek mass rapid transit Jakarta = Risk identification of tunneling work with tunnel boring machine method in mass rapid transit Jakarta project: TBM driving
Fakultas Teknik Universitas Indonesia, 2017
 UI - Skripsi (Membership)
Choirunnisa Muthi`Ah
Identifikasi risiko fasilitas sementara pada tahap persiapan pengeboran oleh tunnel boring machine (TBM) dalam proyek mass rapid transit (MRT) Jakarta = Risk identification of temporary facilities in excavation preparation stage by tunnel boring machine (TBM) on mass rapid transit (MRT) Jakarta project
Fakultas Teknik Universitas Indonesia, 2017
 UI - Skripsi (Membership)
Marendra Uka Ermaya
Analisis Alokasi Risiko Pada Stakeholder Di Proyek Mass Rapid Transit Jakarta Tahapan Konstruksi = Analysis Of Risk Allocation Of Stakeholders On Mass Rapid Transit Jakarta Project In Construction Phase
Fakultas Teknik Universitas Indonesia, 2016
 UI - Skripsi (Membership)
Haureta Nova Aisyah
Pengembangan work breakdown structure pada pekerjaan konstruksi terowongan bawah tanah proyek mass rapid transit Jakarta untuk pengontrolan biaya = Development of work breakdown structure for underground tunnel construction of Jakarta mass rapid transit project for budgeting control / Haureta Nova Aisyah
2017
 UI - Tesis (Membership)
Marbun, Saut Parasian
Analisa fasilitas jembatan penyeberangan bus rapid transit pada stasiun Harmoni Central Busway = Analisys of overpass bus rapid transit facility at harmoni central busway station
Fakultas Teknik Universitas Indonesia, 2008
 UI - Skripsi (Open)