Wijana Nugraha
Pengendalian persediaan MRO dengan continuous review system menggunakan simulasi Monte Carlo pada kontraktor migas = MRO inventory control with continuous review system using Monte Carlo simulation in oil company
Fakultas Teknik Universitas Indonesia, 2013
 UI - Skripsi (Membership)
Muhammad Irfan Kemal
Perancangan Model Persediaan untuk Mengurangi Total Biaya Persediaan Barang MRO (Sarana dan Prasarana) pada Gudang Depo Perusahaan Transportasi di Jakarta. = Inventory Model Design to Reduce the Total Inventory Cost of MRO Goods (Rolling Stock and Non-Rolling Stock) in The Jakarta Transportation Company?s Warehouse (Depot)
Fakultas Teknik Universitas Indonesia, 2020
 UI - Skripsi (Membership)
Sekar Saraswati Wibowo
Pengendalian Persediaan Kemasan Produk Tepung Menggunakan Sistem Continuous Review = Inventory Control of Flour Product Packaging Using Continuous Review System
Fakultas Teknik Universitas Indonesia, 2019
 UI - Skripsi (Membership)
Irvan Wahyu Hutomo
Meningkatkan manajemen persediaan untuk mengurangi surplus persediaan pada PT. XYZ = Improving inventory management to reduce inventory surplus at PT. XYZ
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2016
 UI - Tesis (Membership)
Milky Umar
Optimalisasi Sistem Metode Persediaan Min-Max Untuk Menurunkan Biaya Persediaan dan Peningkatan Service Level Material MRO Pada PT. Kangean Energy Indonesia = Optimizing Inventory Min-Max System Method to Reduce Inventory Cost and Increase Service Level on MRO Material at PT. Kangean Energy Indonesia
Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2017
 UI - Tesis (Membership)