Widya Andrianto
"The Impact of Designer's Role in Involving Construction Personnel During the Design Phase on the Performance of Construction Project Schedule in IndonesiaThe study by The Business Roundtable's team in the US found that opportunities to reduce project costs and schedules by using existing and new construction technology are lost because construction too often is relegated to operate as a production function separated from financial planning, scheduling, and engineering or architectural design. Significant savings in both the costs and time required to complete the project can be accrued from careful interaction of planning, design, and engineering with construction into the creation of projects. The Construction Industry Institute's (CII) Task Force defines this term as Constructability, which is the optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives.
By ignoring constructability in design, designer may be saddling the builder with possible construction problems that could lead to delays, inefficient use of resources, out of sequence work and others. This can be particularly troublesome which may have a devastating effect on project schedule and budget. Designer has an important role in building a receptive interface with construction personnel during the design phase. By communicating the design intent to the construction personnel, designer can gain the information he/she needs to improve the constructability of the project.
This thesis study the role of designer in involving construction personnel during the design phase to improve the constructability of the project which leads to an improvement project time performance of construction project in Indonesia. A questionnaire survey was distributed to projects designers in Jakarta area. The data obtained was analyzed quantitatively to find the correlations and to make a regression between the role of designer in involving construction personnel during the design phase and the performance of construction project's schedule.
The result of this research shows a positive, nonlinear correlation between the interface of designer with construction personnel during the design phase and schedule performance of the project. The main variables are: communicating the design intent to construction and the involving construction personnel from the construction contractor."
Depok: Fakultas Teknik Universitas Indonesia, 2001
T753
UI - Tesis Membership  Universitas Indonesia Library
cover
Renata Muchlis Budijanto
"In Order to increase the quality of project implementation much research will need to be carried out in Indonesia and abroad. In 1982 The Business Roundtable's team in the US found that opportunities to reduce project costs and schedules by using existing and new construction technology are lost because construction too often is relegated to operate as a production function separated from financial planning, scheduling, and engineering or architectural design. The Construction Industry Institute's (CII) Task Force defines this term as Constructability, which is the optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives.
As the customer, the owner gets what he insist on. As the leader of the project team, the owners play a vital role in using constructability to meet project objectives. Specific project documenting the constructability effort have shown that owners accrued an average reduction in total project cost of 4.3% and in project schedule of 7.5%_ These savings represented a 10-to-1 return on the owner's investment in constructability. Although significant saving can result, the opportunities available are often overlooked by owners.
This research was conducted to study the role of project owners for implementing constructability improvement during conceptual planning phase which leads to an improve project time performance of construction project in Jabotabek Area. A questionnaire survey was used as the method for collecting data. Statistical analysis was performed to analyze the data and to develop a regression model between the role of project owners for constructability improvement during conceptual planning phase and the performance of construction project's schedule.
The result of this study shows a positive linier correlation between the project owner's role for constructability improvement during conceptual planning phase and the project time performance. The main variables are assuring that key individual assigned to the project team each have appropriate experience with the project and clearly state the priority of the project objectives."
Depok: Fakultas Teknik Universitas Indonesia, 2001
T1141
UI - Tesis Membership  Universitas Indonesia Library
cover
Leonard
"Manajemen Proyek adalah penerapan dari pengetahuan, keahlian, alat dan teknik bagi aktifitas proyek untuk memenuhi persyaratan proyek. Manajemen Proyek dicapai melalui penerapan dan integrasi dari proses manajemen proyek yang terdiri dari inisiasi, perencanaan, pelaksanaan, pengawasan dan pengendalian, dan penutupan. Masalah-masalah yang dapat dideskripsikan pada penelitian ini adalah mengacu pada PMBOK (Project Management Body of Knowledge) 2004, perencanaan di perusahaan konsultansi konstruksi tidak dilakukan dengan semestinya dan adanya proyek-proyek pada PT. X yang mempunyai kinerja waktu yang buruk karena pelaksanaan proyek yang di luar perencanaan.
Dari masalah diatas dapat disusun pertanyaan penelitian pada penelitian ini, yaitu bagaimana pengaruh proses perencanaan proyek yang mengacu pada PMBOK 2004 pada pekerjaan jasa konsultansi konstruksi terhadap kinerja waktu? Untuk memecahkan masalah, diadakan survei dengan menggunakan kuisioner, dan hasilnya akan diolah dengan analisa statistik deskriptif dan korelasi dengan menggunakan program SPSS. Hasil akhir yang didapatkan dari penelitian ini adalah proses perencanaan proyek pada pekerjaan jasa konsultansi konstruksi mempunyai pengaruh yang positif terhadap kinerja waktu.

Project management is the application of knowledge, skills, tools and techniques to project activities to meet project requirements. Project management is accomplished through the application and integration of the project management processes of initiating, planning, executing, monitoring and controlling, and closing. Problem that can be described on this research are point on PMBOK ( Project Management Body of Knowledge) 2004, planning process at construction consultant company is not done properly and marks the existance projects on PT. X that have poor time performance because of poor project execution.
Of problems upon can be arranged a research question on this research, which is how is project planning influence based on PMBOK 2004 on construction consulting services to time performance? To solve problem, arranged by survey by the use of questionnaire, and it?s result will be analyze with descriptive statistical analysis and correlation by the use of SPSS program. The result that is gotten from this research is project planning process on construction consultant company has positive influence to time performance.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
T26175
UI - Tesis Open  Universitas Indonesia Library
cover
Agus Wicaksono
"Keberhasilan suatu proyek ditentukan sejak awal pelaksanaan konstruksi itu berjalan Perencanaan adalah tahapan penting dari manajemen konstruksi, untuk menghasilkan suatu kegiatan yang dapat berjalan dengan baik dan untuk memonitor serta mengendalikan sehingga tercapai suatu pelaksanaan konstruksi yang tepat biaya proyek bangunan gedung adalah salah satu bidang dalam proyek konstruksi salah satu kriteria keberhasilan suatu proyek konstruksi dilihat dari intensitas keterlibatan tiap anggota tim pada suatu proyek, yang diantaranya adalah seorang manajer proyek pihak pemilik proyek.
Seorang manajer proyek pihak pemilik proyek mempunyai tanggung jawab penuh atas semua hasil yang dicapai pada setiap tahapan proyek dari awal hingga selesainya masa konstruksi, Penelitian ini ditujukan untuk mengetahui seberapa besar peranan manajer proyek pihak owner pada tahap perencanaan konstruksi dalarn meningkatkan kinerja biaya pelaksanaan proyek konstruksi.
Dilihat dari besarnya tanggung jawab manajer proyek pihak pemilik proyek tersebut, maka dalam tesis ini dilakukan penelitian tentang intensitas. keterlibatan manajer proyek pihak pemilik proyek pada tahap perencanaan untuk meningkatkan kinerja biaya penyelesaian proyek bangunan gedung di Jabotabek.
Data-data primer dari penelitian ini diperoleh melalui penyebaran kuisioner ditambah wawancara langsung kepada manajer proyek pihak pemilik proyek dalam hal ini proyek yang ditangani adalah bangunan gedung yang berada di wilayah Jabotabek. Data-data tersebut di edit, ditabutasi, diolah dan di bobot kemudian dilakukan analisa korelasi, inter-korelasi, faktor dan regresi berganda serta dilakukan pengujian-pengujian dan validasi.
Dua analisa statistik melalui program SPSS versi 9.0, diperoleh hasil bahwa variabel yang memberikan kontribusi atau korelasi positif terhadap peningkatan kinerja biaya proyek adalah kegiatan manajer proyek pihak pemilik proyek dalam menentukan pilihan organisasi proyek umum dan kontrak yang akan digunakan, kegiatan dalam menentukan dan membuat perkiraan biaya pelaksanaan proyek atau owner estimate.
Dari hasil variabel penentu lam tambahan yang juga dapat memberikan kontribusi terhadap kinerja biaya proyek didapat dua variabel kegiatan yaitu identifikasi potensi kebutuhan proyek dan kegiatan memprediksi kendala proyek. Hubungan variabel intensitas keterlibatan manajer proyek pihak pemilik proyek terhadap peningkatan kinerja biaya proyek merupakan hubungan regresi non-linear."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T10154
UI - Tesis Membership  Universitas Indonesia Library
cover
Gde Astawa
"Jasa konstruksi mempunyai peranan penting dan strategik, mengingat jasa konstruksi menghasilkan produk akhir berupa bangunan atau bentuk fisik lainnya yang berfungsi mendukung pertumbuhan dan perkembangan berbagai bidang, terutama bidang ekonomi, sosial dan budaya, sehingga diperlukan adanya penelitian-penelitian yang berkaitan dengan pengendalian pelaksanaan proyek. Klaim merupakan salah satu permasalahan yang sering muncul dalam proses konstruksi berlangsung, apabila tidak ditangani secara cerdas dan sungguh-sungguh bisa berdampak terganggunya kinerja waktu proyek atau bahkan mungkin dapat menggagalkan proyek yang sedang dilaksanakan.
Hasil penelitian yang dilakukan dengan menggunakan analisis statistik terhadap sampel proyek dalam bentuk kuesioner memperlihatkan hasil yang menyatakan bahwa adanya klaim dengan variabel-variabel penentu yang mewakili variabel lainnya mempunyai tingkat kesesuaian sebesar 81,20 % terhadap variabel kinerja waktu proyek dengan model persamaan linier dengan 3 variabel penentunya adalah, klaim terhadap kelancaran pembayaran kepada sub kontraktor tata udara, klaim terhadap kelancaran pembayaran kepada sub kontraktor arsitektur dan klaim terhadap kelancaran pembayaran kepada sub kontraktor interior. Hasil penelitian memperlihatkan bahwa peningkatan kualitas klaim akan menurunkan kinerja waktu proyek."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T757
UI - Tesis Membership  Universitas Indonesia Library
cover
Idun Karomidin
"Pelaksanaan proyek konstruksi, melibatkan banyak pihak seperti pemilik, kontraktor, subkontraktor, konsultan perencana, konsultan pengawas, supplier dan lain sebagainya, memakai berbagai jenis sumber daya, dan juga menghadapi masalah yang sulit atau bahkan tidak bisa dikendalikan, sehingga diperlukan adanya alat atau metode perencanaan yang dapat menggantisipasi seawal mungkin permasalahan-permasalahan yang akan timbul pada waktu pelaksanaan. Pihak-pihak tersebut diatas merupakan tim proyek atau peserta yang berkepentingan dan terlibat dalam penyelenggaraan dan hasil proyek. Keberhasilan pelaksanaan proyek konstruksi akan ditentukan oleh kemampuan para peserta atau pelaku utamanya, tersedianya perangkat yang lengkap dan berkualitas, dan terpenuhinya hubungan yang baik antara peserta proyek, juga dengan adanya pengendalian dan pengawasan yang baik.
Subkontraktor mernpunyai peran yang signifikan dan juga memainkan peran yang vital dalam dunia industri konstruksi. Subkontraktor adalah seorang atau beberapa orang yang dinyatakan dalam kontrak sebagai subkontraktor untuk bagian pekerjaan atau, seorang atau beberapa orang kepada siapapun bagian pekeajaan disubkontrakkan. Kontraktor utama menyerahkan sebagian pekerjaan kepada subkontraktor karena alasan-alasan efisiensi dan produktivitas, tidak mempunyai tenaga ahli yang produktif dan peralatan konstruksi yang memadai. Proses pemilihan hampir sama dengan pemilihan kontraktor utama, dengan penekanan pada beberapa aspek karena jenis pekerjaan yang spesifik dan lingkup kerjanya terbatas. Tujuan dalam penyeleksian subkontraktor, untuk menjamin agar biaya pelaksanaan sesuai/dibawah rencana, waktu pelaksanaan sesuai/dibawah rencana dan mutu yang akan diserahkan sesuai gambar dan spesifikasi.
Dalam penelitian ini, mengambil hubungan atau jenis kontrak yang sering dipraktekkan di Indonesia, yaitu menggunakan jasa kontraktor dan konsultan, yang disebut pendekatan tradisional dengan kontrak harga menyeluruh (lumpsum). Dan penelitian ini bertujuan untuk melakukan kajian seberapa besar pengaruh kualitas subkontraktor pada pelaksanaan proyek konstruksi bangunan pabrik terhadap kinerja proyek di wilayah Jabotabek, serta seberapa jauh model regresi dapat digunakan untuk menjelaskan hubungan antara pengarah kualitas subkontraktor dengan kinerja biaya dan waktu.
Hasil-hasil temuan penelitian ini menunjukkan bahwa terdapat beberapa variabel-variabel kualitas subkontraktor pada pelaksanaan proyek konstruksi bangunan pabrik terhadap kinerja biaya dan waktu di wilayah Jabotabek. Diperoleh 3 variabel penentu untuk model hubungan kualitas subkontraktor terhadap kinerja biaya adalah faktor penyediaan dana pinjaman, proposal yang diajukan oleh subkontraktor dan pengadaan peralatan segi kualitas. Dan juga diperoleh 3 variabel penentu untuk model hubungan kualitas subkontraktor terhadap kinerja waktu adalah: pengalaman subkontraktor, kemampuan tenaga kerja dari segi kualitas dan pengawasan pemakaian material dari segi kualitas.
Hasil-hasil penelitian tersebut didapat dari 23 sampel yang telah dapat memenuhi persyaratan statistik Sampel tersebut didapatkan dari 30 angket yang diberikan atau diisi oleh responden dari pimpinan-pimprnan proyek pihak kontraktor pada proyek-proyek pabrik di wilayah Jabotabek dan sekitarnya. Analisis yang dilakukan dalam penelitian ini menggunakan analisis korelasi, analisis faktor, analisis variabel penentu, dan analisis regresi berganda (multiple regression). Semua analisis tersebut diolah dengan menggunakan bantuan paket software Statistical Program for Science Release 9.0 atau SPSS 9.0 for Window.

The construction process, involve many parties as an owner, contractor, subcontractor, design consultant, supervision consultant, supplier and others, with use the various of resources type, and also to face the complex problems or even can not be controlled, until the needed of equipment or planning method available that can anticipate for the problems early. The mentioned parties as a project team or an important participant and involved in the process and result of project. The success of project completion will be determined with capability of participant or the main performer, availabilities of complete and quality tools, and compiled with good relation between the project participants, and also exist of the good controlling and supervision.
The subcontractors have a significant role and play a vital role in the construction industry. Subcontractor means any person named in the contract as a subcontractor, or any person appointed as a subcontractor, for a part of works; and the legal successor in tide to each of these persons. The main contractors award a part of works for subcontractor to be efficient and economical in the use of available resources, are not always sufficiently extensive to afford full-time employment of skilled craftsmen in each of the several trade classifications needed in the field, and another common reason for subcontracting is when the project requires construction equipment; the prime contractor does not have. The selecting process almost the same with selecting for prime contractor, with the emphasizing of several aspects, because the the limited works scope and specific works type. The purpose of the subcontractor selecting is to ensure so that completion as budget, finished in time, and as quality.
In this observation, takes of the relationship or the contract that the most commons are used in Indonesia was an approach of traditional (owner, consultant and contractor), with lumpsum contract price. And the purpose of this observation was to view as much as of large of impact of subcontractor quality on the industrial construction building to project performance in Jabotabek region, and as much as of far of regression model can be used to describe relationship between impact subcontractor quality to performance of budget and time.
The results of the observation finding indicate that be found several variables of subcontractor quality on the industrial construction building to project performance in Jabotabek region. Obtained three variables of determinant for relationship model of subcontractor quality to budget performance are: factor of supplying of loan fund, submitted proposal by subcontractor and procurement of equipment to quality aspect. And also obtained three variables of determinant for relationship model of subcontractor quality to time performance are: experience of subcontractor, capability of manpower to quality aspect and supervision of material use to quality aspect.
And the results of the mentioned observation, obtained from 23 samples have been compiled with statistical requirement. The samples are obtained from 30 questionnaires sent or contained by respondent from project manager of contractor party on the projects of industrial building (factory) in Jabotabek region. The analysis was executed in the observation used analysis of correlation, analysis of factor and analysis of multiple regressions. The all analysis was processed with helping of Software package of Statistical Program for Science Release 9.0 or SPSS 9.0 for Window.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T3819
UI - Tesis Membership  Universitas Indonesia Library
cover
Rika Andayani
"Produktifitas suatu proyek sedikit banyaknya dipengaruhi oleh faktor sumber daya manusia. Pada beberapa penelitian terakhir, banyak ditemukan bahwa tindakan kolektif dari mereka yang terlibat dalam proyek amat sangat menentukan keberhasilan ataupun kegagalan dari sebuah proyek. Project teams adalah suatu kumpulan manusia yang spesifik karena terbentuk secara temporer untuk kurun waktu tertentu. Karena spesifik tersebut , tentunya menuntut adanya kerjasama antara individu yang terlibat untuk mendapatkan produktifitas yang meningkat. Jelasnya efektifitas dari tim proyek menentukan kesuksesan proyek. Dengan demikian kesuksesan proyek yang dalam tulisan ini diukur Bari sudut pandang kesuksesan dari project teams, melihat pada upaya dari project teams untuk mencapai hal tersebut. Dalam studi kasus mi dicari faktor-faktor project teams effectiveness yang paling banyak mempengaruhi effektifitas tim proyek. Ada 10 faktor yang berkaitan dengan project teams effectiveness yaitu project strategy, communication, personal commitment, interpersonal relationship, project management skills, team management skills, sponsorship, group meetings, conflict management serta distributive collaborative technology. Dari hasil penelitian didapat bahwa project management skills, project strategy, personal commitment serta conflict management merupakan faktor-faktor signifikan yang berpengaruh terhadap project teams effectiveness baik dari besarnya pengaruh, banyaknya korelasi dengan faktor lain serta kuatnya faktor ini berkorelasi dengan faktor lain. Pengaruh efektifitas ini dapat meningkatkan kesuksesan proyek yang dalam hal ini melihat dari performance waktu yang dihasilkan. Diharapkan dari penelitian ini memberikan kontribusi terhadap pengambilan keputusan yang menyangkut sumberdaya manusia dan pengembangan sumberdaya manusia.

Collective action has received a lot of attention and success may depend on the nature of collective task. The workplace today is different from the workplace yesterday. From the last results researches, there are found that success of the project due to their project teams effectiveness. Project teams are usually project specific. Projects rely on teamwork. They exist only temporarily to perform an assignment that is typically non routine. That's why attitude, goal and teamwork can make a significant difference in the success of project. Issue regarding project teams includes how effective they are in workplace affects the project success. Literature review about team effectiveness identified the following key factors consideration: project strategy, communication, personal commitment, interpersonal relationship, project management skills, team management skills, sponsorship, group meetings, conflict management skills and collaborative technology. If these key factors facilitate activities of project teams, these factors will affect project success. From the result of the research, it was found that the relative importance of these facilitating factors came from management skills, project strategy, personal commitment and conflict management. These factors are relative significant in making project success from the success of time indicators. Hopefully from this research, will give an input to the organization for measuring performance of human resources especially for project teams."
Depok: Fakultas Teknik Universitas Indonesia, 2003
T752
UI - Tesis Membership  Universitas Indonesia Library
cover
Adre Arista
"Untuk meningkatkan kepercayaan konsumen dan memperoleh keuntungan yang lebih baik, sebuah perusahaan kontraktor harus menjaga kualitas dari pekerjaannya. Salah satunya dengan menjaga ketepatan dalam waktu penyelesaian sebuah proyek. Ketepatan waktu penyelesaian proyek dipengaruhi oleh banyak faktor salah satunya adalah dalam proses pengadaan material untuk konstruksi. Penelitian bertujuan untuk mengetahui faktor-faktor risiko dalam aspek manajemen pengadaan material, tindakan yang diberikan terhadap faktor-faktor tersebut dan tingkat pengaruh faktor-faktor tersebut terhadap kinerja waktu proyek. Metode pengumpulan data dilakukan dengan cara wawancara dan kuesioner. Wawancara dilakukan terhadap pakar dan kuesioner dilakukan terhadap proyek manajer. Analisa data dilakukan dengan menggunakan statistik deskriptif dan uji Mann-Whitney. Hasil Analisa data menunjukkan bahwa variabel yang dominan dalah pada proses perencanaan pengadaan material dan proses pelaksanaan pengadaan material, dan tingkat pengaruh yang tinggi adalah proses pelaksanaan manajemen pengadaan material.

To improve the consument's trust and to gain more profit, a construction company must maintain the quality of works and finish the works by the time. Many factors is influence the punctuation of the construction project, one of that factors is the procurement for construction. The Primary goals of this final assignment is knowing the risk factors in procurement management aspect, the treatment to the factors, and the influence level of the factors. The methods that used in this final assignment is an interview and a questionaire. An interview was occured to the expert and a questionaire was occured to the project manager. A descriptive statiscs and Mmann-Whitney test was occured to data's analysis process. The Analytical data resulsts shows material procurement management plan process and material procurement management executing process are dominant. And procurement management executing process has an huge influence level."
Depok: Fakultas Teknik Universitas Indonesia, 2008
S35340
UI - Skripsi Open  Universitas Indonesia Library
cover
Dwie Suksmono Hadhi
"The Influence of Improving Constructability during The Design Phase on the Performance of Construction Project Schedule in Indonesia
Constructability as defined by Construction Industry Institute, Constructability Concepts File, The University of texas at Austin as; the optimum use of construction knowledge and experience during the phases of planning, designing, procurement and construction to achieve the project goal. Constructability involves the thought of how to build a project even before it is designed.
Currently there are three issues which dominate constructability applications; design, layout, and construction method. In order to obtain deeper understanding of the potential application of Constructability for Construction Project implementation, the research focussed on the effect of its key characteristics introduced during the design phase on the performance of Construction Schedules in Indonesia.
Data was obtained through questionnaires from project architects and structural engineers of Consultants in 24 Construction Projects executed during the last decade between 1985 - 1995. Correlation and multiple regression analysis were utilized to establish models on the relation between Constructability variables and Construction Schedule Performance. The degree of completing construction projects as measured by actual against planned time performance proved to be related to Constructability variables in a linear manner.
From the analysis of 48 prospective explanatory Constructability variables during the design phase identified three determinants influencing Construction Schedule Performance. The three significant Constructability variables were; to confirm the filing system (x23), to describe the pre-fabrication system (x43), and to define clearly the contractor limit in design document (x12).
Further research provided additional evidence of the existence of Constructability characteristics through dummy variables which were; to eliminated weather problem (x46)."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T2897
UI - Tesis Membership  Universitas Indonesia Library
cover
Betty Ariana
"Pada tahun-tahun terakhir ini, banyak perusahaan telah memberi perhatian pada Quality Management, karena pelanggan lebih menyukai barang dan jasa yang berkualitas tinggi dengan harga yang wajar. Salah satu aspek dari quality management tersebut adalah Cost Of Quality, yang terdiri dari empat kategori yaitu prevention cost, dan appraisal cost sebagai biaya yang berkaitan dengan usaha menghasilkan kualitas baik serta internal failure cost dan external failure cost sebagai biaya akibat kualitas yang tidak baik.
Sementara dalam literatur dapat diperoleh data-data tentang cost of quality dari perusahaan industri manufaktur, Minn ini akan menyajikan sistem perhitungan serta hasil perhitungan berupa nilai cost of quality dari proyek konstruksi. Tujuan dari penulisan ini antara lain adalah untuk mengetahui nilai cost of quality pada kegiatan proyek konstruksi, yang selanjutnya akan dianalisis dan disimpulkan, sehingga dapat memberi kontribusi bagi kalangan akademis berupa sumbangan informasi tentang praktek manajemen kualitas serta bermanfaat bagi praictisi jasa konstruksi dalam usaha membangun dan mengembangkan sistem cost of quality khususnya pada proyek konstruksi.
Untuk maksud tersebut, penulis telah melakukan studi kasus pada dua puluh dua proyek bangunan gedung yang telah diselesaikan oleh kontraktor pads kurun waktu satu tahun terakhir. Metodologi yang diterapkan adalah dimulai dengan pengembangan teori, pemilihan kasus, kemudian membuat desain penelitian, selanjutnya pelaksanaan studi kasus sampai menghasilkan nilai cost of quality yang dilengkapi dengan analisis dan kesimpulan.
Kesimpulan dari studi kasus ini antara lain adalah :
- Sistem cost of quality dapat diterapkan pada proyek konstruksi
- Total cost of quality dan proyek-proyek yang diamati adalah sebesar 2.19% dari total biaya penjualan atau sebesar 1.92% dari total penjualan.
- Internal failure dan external failure cost merupakan kategori cost of quality yang dominan.

In recent years organizations have been focusing much attention on quality management, because the customers are prefer products or services with a high quality and reasonable price. One aspect of quality management is cost of quality, which are divided into four categories: prevention cost and appraisal cost are costs associated with improving quality, while internal failure cost and external failure cost result from poor quality.
Meanwhile from the literature we could get the data of cost of quality from manufacture industry, the study will provide a calculation system and resulting in the form of construction project's cost of quality. The main purpose of this study is to know whether the cost of quality system could be apply in the construction project as well as to calculate the value of cost of quality, with than will be analyzed, and concluded, so that it could give contribution for the academic society in form of information about practical quality management as well as it will be useful to construction industry practitioner, in their pursuit of developing cost of quality system in construction project.
For that reason, author has conducted a ease study on 22 construction projects which have been completed by the contractor in the last one year. The methodology that was used referred to theory written by Robert K. Yin , starting with theory development, selecting the case, designing data collection, conducting case study until it result in the value of cost of quality, including the analyses and conclusion.
The conclusion of the case study can be summarized as follows:
1. The cost of quality system can be implemented in construction project.
2. The total cost of quality is 2.19% from sales cost or 1.92% from total sales.
3. Internal failure and external failure cost are two dominant categories cost of quality.
"
Depok: Fakultas Teknik Universitas Indonesia, 2002