Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 156327 dokumen yang sesuai dengan query
cover
Bayu Eka Adichandra
"FMC Santana PEI primary service base and manufacturing center to support the Indonesian petroleum industry. In fulfill and desire requirement of customer and also continue to take care of the quality of from yielded product, P.T. FMC Santana PEI till now have owned standard certificate ISO 9001:2000 and ISO 14001:1996 from Det Norske Veritas registrar and also license from American Petroleum Institute (API) in the form of Production Specification Level 4 (PSL-4).
P.T. FMC Santana PEI has run practice in course of management as according to QMS and EMS. But in both of the management system still have constraint in attainment of Total Quality Management (TQM). In overcoming the constraints require to analyzed exhaustively to degradation or improvement result of audit and evaluate to principles in ISO 9001:2000 and ISO 14001:1996 with Total Quality Management (TQM) concept.
In compiling implementation process of ISO 9001:2000 and ISO 14001:1996 in attainment of Total Quality Management (TQM) used combination of two methodologies that is method 5 phase approach and 6 key steps in continuous improvement. Which is consist of 4 steps that are assessment, planning, implementation and also audit and evaluation.

P.T. FMC Santana PEI adalah pusat dari divisi pelayanan dan manufaktur, yang memberikan dukungan kepada dunia industri pengeboran minyak bumi di Indonesia. Dalam memenuhi keinginan dan kebutuhan pelanggan serta terus menjaga kualitas dari produk yang dihasilkan, P.T. FMC Santana PEI hingga saat ini telah memiliki sertifikat standar ISO 9001:2000 dan ISO 14001:1996 dari pihak registrar Del Norske Veritas serta lisensi dari American Petroleum Institute (API) berupa Production Specification Level 4 (PSL-4).
P.T. FMC Santana PEI telah menjalankan praktek-paraktek dalam proses manajemen sesuai dengan SMK dan SML. Tetapi dalam pelaksanaan kedua sistem manajemen tersebut masih terdapat kendala dalam pencapaian Manajemen Kualitas Terpadu (TQM). Dalam mengatasi kendala-kendala tersebut perlu dilakukan analisa secara mendalam terhadap peningkatan atau penurunan hasil audit dan melakukan tinjauan terhadap prinsip-prinsip dalam ISO 9001:2000 dan ISO 14001:1996 dengan konsep Manajemen Kualitas Terpadu (TQM).
Dalam menyusun proses penerapan ISO 9001:2000 dan ISO 14001:1996 dalam pencapaian Manajemen Kualitas Terpadu (TQM) digunakan penggabungan dua buah metodologi yaitu metode 5 phase approach dan 6 langkah kunci dalam perbaikan berkelanjutan. Yang terdiri dari 4 langkah yaitu penilaian, perencanaan, implementasi serta audit dan evaluasi.
"
Depok: Fakultas Teknik Universitas Indonesia, 2005
T18627
UI - Tesis Membership  Universitas Indonesia Library
cover
Marwati Margono
"Unit Pengolahan VI - Balongan adalah salah satu kegiatan PERTAMINA yang mengoperasikan satu dari tujuh kilang minyak PERTAMINA . Dalam upayanya agar menjadi kilang yang world class dan dalam mengantisipasi globalisasi serta AFTA ( Asean Free Trade Aggreement) mendatang, maka UP VI telah melakukan penerapan manajemen lingkungan standar ISO 14001. Dengan demikian UP VI Balongan diharapkan dapat survive dalam persaingan dan dapat memberikan nilai yang lebih besar. Perlu diketahui sejauh mana UP VI telah melakukan praktek - praktek manajemen yang sesuai dengan manajemen mutu terpadu dengan lingkungan, sehingga dapat ditentukan kondisi serta dari mana proses implementasi mutu dan lingkungan dimulai.
Dalam mengimpiementasikan manajemen mutu dan lingkungan ditemui kendala - kendala yang cukup berarti yang memerlukan kerja keras dari seluruh pegawai UP VI Balongan. Untuk mengatasi kendala - kendala tersebut dilakukan dengan pendekatan manajemen mutu terpadu atau Total Quality Management ( TQM ). Untuk ini terlebih dahulu perlu dipahami apakah TQM itu, konsep - konsepnya, standar praktek yang ada dan proses atau metodologi implementasinya. Konsep dasar yang harus diperhatikan dalam implementasi TQM adalah customer focus, continuous improvement dan total participation.
Untuk menyusun proses implementasi TQM dalam memecahkan masalah tersebut, digunakan penggabungan dua metodologi yaitu metode Five Phase Approach dan 6 ( enam) Langkah Kunci untuk perbaikan berkelanjutan yang didasarkan pada kondisi UP VI. Metode yang dihasilkan adalah proses implementasi yang terdiri dari 4 (empat) langkah yaitu Assessment, Perencanaan, implementasi, dan Audit serta Evaluasi. Agar pelaksanaan implementasi ini bisa berjalan lancar dan berhasil, maka perlu diperhatikan adalah komitmen seluruh pegawai dan pemberian semangat dan dorongan dari eksekutif."
Depok: Fakultas Teknik Universitas Indonesia, 1999
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Hutapea, Manahara
"Konsep TQM (Total Quality Management) yang salah satu tujuannya mencapai Zero defect management, sepinias memiliki kesamaan dan korelasi dengan konsep K3, (Keselamatan dan Kesehatan Kerja) yang mengarah pada pencapaian Zero accident award.
Berdasarkan penelitian yang dilakukan pada responden PT. Tambang Batubara Bukit Assam Unit Produksi Tanjung Enim, PT. Aneka Tambang UBP Nikei Pomaia, PT. Freeport Indonesia dan PT. Aneka Tambang UBP Emas Pongkor atas korelasi penerapan unsur TQM di bidang manajemen K3 dengan keberhasilan pencapaian nihil kecelakaan (zero accidend diperoleh hasil yang cukup signifikan.
Kuatnya korelasi antara unsur-unsur TQM (Customer Focus, Continue Improvement dan Total participation) dengan keberhasilan pencapaian nihil kecelakaan menunjukkan bahwa fungsi K3 telah diberdayakan secara proporsional, karena telah menyadari betapa pentingnya masalah K3 dalam menghadapi persaingan di era perdagangan bebas, dimana masalah K3 telah menjadi isu global yang merupakan salah satu faktor keunggulan dalam bersaing.

Abstract
TQM (Total Quality Management) concept whose one of its aims is to accomplish Zero defect management at glance has similarity and correlation with Safety and Health concept with direct to zero accident award accomplishment.
Based on research from PT. Tambang Batubara Bukit Asam Unit Produksi Tanjung Enim, PT, Aneka Tambang UBP Nikel Pomala, PT. Freeport lndonesia and PT. Aneka Tambang UBP Emas Pongkor on correlation of TQM elements implementation on Safety and Health management with successful Zero accident accomplishment, we gota significant result.
The strong relation among TQM elements (Customer Focus, Continual Improvement and Total participation) with the successful of zero accident accomplishment on that company showed that the function of Safety and Health has been empowered proportionally the importance of Safety and Health problems in dealing the competition in free market era has been realized. Where safety and Health problems have become global issue which are one of the competitive advantage factors.
"
Depok: Fakultas Teknik Universitas Indonesia, 2002
T2577
UI - Tesis Membership  Universitas Indonesia Library
cover
Agus Pujisantoso
"Globalisasi yang sudah berada di depan mata, bukan saja menjadi sebuah tantangan, tetapi juga peluang bagi perusahaan-perusahaan untuk dapat bertahan bahkan melakukan ekspansi di pasar global. Hilangnya batas-batas antar negara dan policy dari negara tertentu untuk melindungi perusahaan lokalnya, mendorong perusahaan-perusahaan untuk melakukan standarisasi di bidang mutu yang menjadi tuntutan pasar global. Salah satunya adalah dengan melakukan standarisasi Sistem Manajemen Mutu ISO 9000 series.
Penelitian ini bertujuan untuk mengetahui keuntungan(benefit) secara kuantitatif dari implementasi SMM ISO 9000 series dan mengetahui keberhasilan (konsistensi) dari implementasi SMM ISO 9000 series melalui pendekatan analisa biaya mutu dan analisa investasi. Sebagai studi kasus, penelitian dilaksanakan di PT TELKOM Kandatel Jakarta Timur untuk implementasi SMM ISO 9002 pada proses pasang baru (PSB).
Tahap awal dari penelitian ini adalah dengan melakukan studi literatur SMM ISO 9000 series, bagaimana proses persiapan, implementasi dan pemeliharaan sertiiikat. Serta mencari parameter-parameter benefit dari implementasi yang dapat dinilai secara kuantitatif.
Tahap selanjutnya adalah tahap pengumpulan data dan pengolahan data, yang secara garis besar dibagi menjadi 2 yaitu :
- Investasi implementasi Sistem Manajemen Mum ISO 9002
- Biaya Mulu pta dan pasca ISO
Setelah dilakukan pengolahan data, kemudian dilakukan analisa pada kedua bagian di atas.
Pada tahap akhir, dilakukan analisa secara menyeluruh untuk analisa investasi dan analisa biaya mutu , untuk mengetahui kondisi konsistensi implementasi SMM ISO 9002 di PT TELKOM yang akan memberikan data kuantitatif untuk pengambilan keputusan bagi manajemen tentang penerapan SMM ISO 9002 pada proses PSB."
Depok: Fakultas Teknik Universitas Indonesia, 1998
S36867
UI - Skripsi Membership  Universitas Indonesia Library
cover
Tarigan, Rostiana
"Entry barrier is decrease progressively in era globalization. Because of that quality of product and sen/ice must been takencare. Total of Quality Management ( TQM) represent management quality of service which cannot be disregarded, considering society claim govemment organization have to become servant, government organization must became steward to serve entrepreuner and society because our entrepreneur and society want get service from government organization quick, accurate and trusted.
National Agency of Drug and Food Control (NADFC) since year 2001 have
intended to implement good service program which in line with TQM, but in its applying still face some constraint so that good service able to satisfied customer/ client not yet fully can be executed.
To know how far applying of TQM and constraints faced and why service not doing better its need research scientifically.
Leadership, Komitmen, Process and Product in Organization is to represent very important organizational pillar in applying of TQM (ISO 9000). which must evaluate continually that because of staff and head in band quality control of narcotic and psikotropic are beiing sample population I tne research each officer work with profesional speed, credible as according to organizational culture of NADFC so satisfaction of customer/client can be reach.
Sampel determined with technique of Non Probability Sampling Purposive That mean Sampel have been determined owning certain specification and strata with use kuesioner.That kuesioner are full with quesition and andswer with use likert scale disseminating containing kuesioner of question with answer by using
likert scale, result of kuesioner analysed correlationly doubled regresi and constructively SPSS program 11.5
Result of research to Leadership factors, Komitmen, Process and Product in Organization is to represent Organizational Pillar according to in TQM theory have strong relation with Satisfaction of customerlclient, and although in general the quality of service have good but still a lot need improvement and repair. From is fourth of the factor which most having an effect on is leadership
Constraints which still faced among others is Leadership which not yet is fully executed second, total quality execution still not yet fully become head komitmen head and staf that still found by oflioer give less dissatisfactory and non professional service to the customer/ client, third is less looked after by is
facilities and basic facilities so that not yet futilled of short examination time According to TQM theory tht is new paradigm, head have to assume subordinate is cutomer/client which must be listened by sigh and hislits suggestion so that reaching of communications which either through horizontal and is vertical.Thats fourth of factor above in the reality most having an effect
on in satisfaction of customer/client is leadership. lf leadership have been executed bette, officer will work hardly and hold responsible and have komitmen to be able to fulfill short time which specified by NADFC and service as according to quality service so that can reach by satisfaction in NADFC."
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2005
T21638
UI - Tesis Membership  Universitas Indonesia Library
cover
Henry Mujianto
"ABSTRAK
Dalam persaingan global, agar organisasi dapat berkembang. Organisasi harus mampu
menghasilkan produk dan pelayanan dengan mutu yang lebih baik. Dalam unit organisasi
pemerintah, untuk mencapai tujuan tersebut diperlukan perbaikan mutu dalam semua aspek yang
berkaitan dengan pelayanan tersebut sehingga mampu meningkatkan kepercayaan publik. Oleh
karena itu diperlukan adanya pengendalian mutu secara menyeluruh (Total Quality
Management). Paradigma baru penyelenggaraan tata pemerintahan yang efektif dan efisien perlu
dilakukan. Untuk itu organisasi pemerintah seperti Balai Latihan Kerja dalam menerapkan Total
Quality Management melalui ISO 9001:2008 memerlukan langkah ? langkah yang tepat.
Dengan pengendalian mutu secara menyeluruh dapat menjadi model kinerja pelayanan publik
yang prima dan dapat memberikan standar pelayanan publik sekaligus dapat menunjang
revitalisasi - manajemen pengelolaan BLK.

ABSTRACT
In global competition, so the organization can flourish. Organizations must be able to produce
products and services with better quality. In units of government organizations, to achieve that
goal is needed for quality improvement in all aspects related to such services so as to enhance
public confidence. Therefore we need the overall quality control (Total Quality Management).
Organizing a new paradigm of governance that needs to be done effectively and efficiently. For
that the government organizations like the Vocational Training Center in implementing Total
Quality Management through ISO 9001:2008 requires a step - the right step. With a
comprehensive quality control can be a model of public service performance excellence and can
provide the standard of public services as well as to support the revitalization-BLK management
"
2010
T 27637
UI - Tesis Open  Universitas Indonesia Library
cover
Isnomo Adi Nugroho
"Dalam usaha mendapatkan sertifikasi ISO 9001:2000 atau upgrade sertifikat ISO 9002:1994 ke ISO 9001:2000 memerlukan suatu metode implementasi yang tepat, khususnya dalam mengatasi kendala dan inefisiensi yang menyebabkan lamanya pencapaian sertifikasi. Kendala dan inefisiensi tersebut mendorong pemborosan biaya dan waktu yang tinggi, tidak terkecuali PT Krakatau Steel yang memulai usaha pencapaian sejak 2001. Merancang suatu sistem atau metode implementasi TQM yang baik memerlukan pedoman teori dasar, pengetahuan sistem manajemen mutu ISO 9001:2000 selain pengalaman-pengalaman dalam merancang implementasi tersebut. Penerapan 8 prinsip manajemen mutu ISO 9001:2000, hubungan klusal ISO 9001:1994 dan ISO 9001:2000 dan metode implementasi Five-Phase Approach adalah parameter-parameter pendekatan yang diambil penulis untuk mendapatkan analisa dan strategi implementasi. Assessment, perencanaan, implementasi dan audit evaluasi merupakan langkah-langkah penerapan TQM untuk memecahkan kendala-kendala seperti masalah komitmen manajemen, pelatihan, dokumentasi, komunikasi, biaya nonkonformans dan budaya kualitas.

To achieve ISO 9001:2000 certificate or upgrading ISO 9002:1994 to ISO 9001:2000 need a precise implementation method, especially to solve any obstacles and inefficiencies that can make a long certification achievement. To design a precise TQM implementation method will require certain basic theories and some data about quality management system of ISO 9001:2000, and also some experiences in designing the system. Implementing 8 quality management principles of ISO 9001:2000, clausal relationship of ISO 9001:1994 and ISO 9001:2000, and Five-Phase Approach implementation method are the approach perimeters used by the writer to find the implementation analysis and strategy. Assessment, planning, implementation, and evaluation audit are the phases to solve any obstacles such as management commitment, training, documentation, communication, nonconformance cost, and quality culture."
Depok: Fakultas Teknik Universitas Indonesia, 2004
T14815
UI - Tesis Membership  Universitas Indonesia Library
cover
Sidiq Wacono
"Era globalisasi telah melahirkan gala kompetisi yang sangat ketat pada berbagai sektor komoditi dunia usaha baik produk maupun jasa, karenanya hanya produk dan jasa yang memiliki daya saing tinggi yang dapat melakukan kompetisi. Begitu pula untuk sektor industri konstruksi, dalam menghadapi era globalisasi maka perusahan industri konstruksi hams mempersiapkan diri, salah satu caranya adalah dengan mendapatkan sertifikat sistem manajemen mutu ISO 9002.
Tuntutan kualitas penerapan sistem manajemen mutu ISO 9002 yang memiliki daya saing sehingga perusahaan industri konstruksi dapat melakukan kompetisi dengan baik menjadi begitu penting. Penelitian mengenai biaya mutu ( quality cost atau cost of quality ) yang dikaitkan dengan kualitas penerapan sistem manajemen mutu ISO 9002 merupakan salah satu cara untuk mendapatkan daya saing tersebut.
Biaya mutu yang terdiri dari tiga kelompok yaitu biaya pencegahan ( prevention cost ), biaya penilaian ( appraisal cost ) dan biaya kegagalan ( failure cost) dalam penilitian ini merupakan faktor-faktor yang mempengaruhi biaya mutu.
Penelitian ini mempunyai tujuan untuk melihat adanya hubungan melalui analisa regresi berganda pengaruh kualitas penerapan sistem manajemen mutu ISO 9002 terhadap kinerja biaya mutu pada pekerjaan-pekerjaan proyek di lingkungan PT. Waskita Karya.
Hasil penelitian yang dilakukan dengan menggunakan analisa statistik terhadap sampel proyek memperlihatkan hasil yang menyatakan bahwa kualitas penerapan sistem manajemen mutu ISO 9002 dengan variabel-variabel penentu yang mewakili variabel lainnya mempunyai pengaruh 74.1 % terhadap kinerja biaya mutu dengan model regresi linier dengan variabel penentunya adafah bahan yang disuplai oleh pihak pemilik dan persyaratan kerja dalam kontrak yang sesuai dengan keinginan pihak pemilik.
Hasil penelitian memperlihatkan bahwa peningkatan kualitas penerapan sistem manajemen mutu ISO 9002 akan meningkatkan kinerja biaya mutu pekerjaan-pekerjaan proyek di lingkungan PT. Waskita Karya."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T10136
UI - Tesis Membership  Universitas Indonesia Library
cover
Dary Vito Kurniawan
"Salah satu penyebab kegagalan proyek disebabkan oleh perbedaan-perbedaan dalam perencanaan, perencanaan yang kurang baik, dan manajemen yang tidak efisien. Penelitian ini dilakukan untuk mengetahui gap dari kegiatan SMM pada prinsip perencanaan dalam Permen PU No.04/PRT/M/2009 dengan ISO 9001:2015 dan untuk mengetahui bagaimana penerapan kegiatan SMM di proyek Bina Marga. Hasil dari penelitian ini ditemukan bahwa terdapat tujuh variabel ISO 9001:2015 yang belum terdapat di Permen PU No.04/PRT/M/2009, empat diantaranya mengenai klausul perencanaan dalam tindakan pada peluang dan risiko, serta tiga mengenai klausul perencanaan dalam merencanakan perubahan. Dalam penerapannya dua variabel dalam penerapannya berpengaruh terhadap proyek di kementerian PUPR mengenai merencanakan perubahan untuk meningkatkan SMM, serta satu variabel dalam penerapannya berpengaruh yang tidak dominan mengenai manual mutu.

One of the causes of project failure is due to differences in planning, poor planning, and inefficient management. This research was conducted to know the gap of SMM activities on the principles of planning in the Minister of Public Work Regulation No.04 PRT M 2009 with ISO 9001 2015 and to know how the implementation of SMM activities in Bina Marga project. The results of this study found that there are seven variables of ISO 9001 2015 that have not been included in Regulation of Minister of Public Works No.04 PRT M 2009, four of which are about planning clauses in action on opportunity and risk, and three regarding planning clause in planning change. In its application two variables in its application affect the project in the PUPR ministry on planning changes to improve the QMS, as well as one variable in its application has an effect that is not dominant about the quality manual."
Depok: Fakultas Teknik Universitas Indonesia, 2017
S67158
UI - Skripsi Membership  Universitas Indonesia Library
cover
Andri Aliza Putri
"Dalam lingkungan proyek konstruksi di kementerian PUPR sistem manajemen mutu SMM sudah diatur dalam Permen PU No.04/PRT/M/2009. Penelitian ini dilakukan untuk mengetahui gap dari kegiatan SMM pada prinsip pendukung dalam Permen PU No.04/PRT/M/2009 dengan ISO 9001:2015 dan untuk mengetahui bagaimana penerapan kegiatan SMM di proyek Bina Marga. Hasil dari penelitian ini ditemukan terdapat sembilan kegiatan SMM pada prinsip pendukung yang belum terdapat pada Permen PU No.04/PRT/M/2009 yaitu berkaitan dengan pengetahuan organisasi dan komunikasi. Selain itu, terdapat empat kegiatan SMM yang penerapannya masih kurang maksimal pada pelaksanaan proyek Bina Marga dimana kegiatan tersebut berkaitan dengan komunikasi dan penentuan sarana prasarana.

In the construction project environment in the ministry of PUPR the quality management system SMM is regulated in Ministry of Public Works No. 04 PRT M 2009. This research was conducted to know the gap of SMM activities on the principle of support in PU Regulation No.04 PRT M 2009 with ISO 9001 2015 and to know how the implementation of SMM activities in Bina Marga project. The results of this study found there are nine activities of SMM on the principle of support that has not been found in the PU Regulation No. 04 PRT M 2009 is related to organizational knowledge and communication. In addition, there are four SMM activities that are not maximized in implementation of Bina Marga projects where activities are related to communication and determination of infrastructure."
Depok: Fakultas Teknik Universitas Indonesia, 2017
S70023
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>