Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 5593 dokumen yang sesuai dengan query
cover
cover
Desrandy Andriyanda
"Perencanaan proyek yang kurang baik akan mengakibatkan keterlambatan waktu pelaksanaan. Keterlambatan suatu proyek dapat diakibatkan oleh beberapa faktor antara lain kesalahan dalam design perencanaan proyek, keterlambatan pengadaan material dan peralatan hingga perubahan scope pekerjaan yang diminta oleh user. Penelitian ini dilakukan untuk menganalisa risiko-risiko dalam proses perencanaan proyek berbasis PMBOK 2013 yang berpengaruh terhadap kinerja waktu sehingga dapat memberikan gambaran sebab dan akibat serta kuantifikasi efek potensial dari faktor risiko dominan untuk dapat dikembangkan suatu sistem perencanaan proyek sebagai strategi baru dalam meningkatkan kualitas perencanaan yang berdampak terhadap kinerja waktu.

Poor project planning will lead to delays in implementation time. Delay a project can be attributed to several factors, such as errors in project planning design, delays in the procurement of materials and equipment to change the scope of work requested by the user. This study was conducted to analyze the risks in the project planning process based on PMBOK 2013 that affect the performance of time so as to give an idea of cause and effect as well as the quantification of the potential effects of the dominant risk factors in order to develop a system of project planning as a new strategy to improve the quality of planning affect the performance time."
Depok: Fakultas Teknik Universitas Indonesia, 2016
T49720
UI - Tesis Membership  Universitas Indonesia Library
cover
Moningka, Yushak
"Penelitian ini membahas mengenai perbandingan respon antara struktur fixed base dan struktur yang menggunakan base isolation High Damping Rubber Bearing yang dianalisa menggunakan analisa riwayat waktu nonlinear. Struktur fixed base didesain dengan Sistem Rangka Pemikul Momen Khusus SRPMK dengan R=8, sedangkan struktur dengan base isolation didesain menggunakan Sistem Rangka Pemikul Momen Biasa SRPMB dengan R=2.
Dari hasil penelitian menunjukkan penggunaan base isolation dapat meningkatkan periode getar. Dengan menggunakan base isolation, dapat mereduksi gaya geser, displacement, kecepatan, dan percepatan pada struktur atas jika dibandingkan dengan struktur fixed base. Struktur yang menggunakan base isolation memiliki respon yang lebih baik dan sendi ndash; sendi plastis yang terbentuk lebih sedikit dari struktur fixed base. Dari kurva histeretik isolator yang dihasilkan menunjukkan bahwa pada isolator yang digunakan tidak mengalami degradasi kekakuan dan degradasi kekuatan.

This study discusses the response comparison between fixed base structure and base isolation structure High Damping Rubber Bearing using nonlinear time history analysis. Fixed base structure is designed with Special Moment Resisting Frame SMRF with R 8, while structure with base isolation is designed with Ordinary Moment Resisting Frame OMRF with R 2.
The results shows that the use of base isolation can increase the natural period of structure. By using base isolation, it can reduce the shear forces, displacement, velocity, and acceleration on the upper structure if compared with fixed base structure. Structure with base isolation has better response and the plastic hinges that formed are lesser than conventional structure. From the hysteretic curve of isolator shows that there is no stiffness degradation and strength degradation.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
T49658
UI - Tesis Membership  Universitas Indonesia Library
cover
Bondan Satria
"Geoteknik adalah salah satu cabang ilmu teknik sipil yang tertua di Dunia, yang terus berkembang bersamaan dengan tingkat peradaban manusia. Dalam prakteknya terdapat banyak faktor ketidakpastian, baik dari segi desain dan juga dengan material tanah itu sendiri yang mempunyai inherent variability yang besar dan data tanah yang terbatas akan membuat ahli geoteknik mengambil parameter tanah menjadi under estimated bahkan bisa menjadi over estimated. Oleh karena itu faktor keamanan FS digunakan dalam desain sebagai solusi untuk mengurangi resiko kegagalan desain, namun FS dapat menyesatkan karena biasanya dianjurkan atau digunakan tanpa refrensi khusus dan terlalu subjektif.
Salah satu pendekatan alternative adalah Reliability Based Design RBD, RBD merupakan metodologi desain yang mencoba merangkum dan memasukan faktor-faktor kunci dari ketidakpastian, sebab-akibat antara setiap variable dan kemungkinan-kemungkinan akibat resiko yang akan terjadi, sehingga hasilnya akan lebih mendekati kondisi sesungguhnya.
Pada penelitian ini penulis akan membahas mengenai analisis ketidakpastian terhadap penurunan pondasi tiang pancang berdasarkan data tanah hasil penyelidikan lapangan yang akan dikalibrasi dengan data hasil pengujian pembebanan statik aksial tekan pada beberapa proyek di Jakarta, diharapkan dengan menggunakan faktor-faktor kunci dari ketidakpastian yang merupakan tahap awal dari RBD akan menghasilkan desain yang lebih optimal dan ekonomis dengan tetap mempertahankan keamanan dari desain yang dihasilkan.Kata Kunci: Ketidakpastian, Inherent variability, Faktor keamanan, Reliability dan Penurunan tiang pancang.

Geotechnical engineering is one of the oldest majors of civil engineering in the World, which continues to grow along with the level of human civilization. In the practice there are many factors of uncertainty, both in terms of design and also with the soil material itself which has large inherent variability and limited soil data will make geotechnical experts take the parameters of the soil to be under estimated even be over estimated. Therefore the safety factor FS is used in the design as a solution to reduce the risk of design failure, but FS can be misleading as it is usually recommended or used without specific refrence and is very subjective.
One of the alternative approach is Reliability Based Design RBD , RBD is a design methodology that tries to summarize and incorporate the key factors of uncertainty, the couse and effect for ecery variable and possible consequences of the consequences that will occur, so the results will be more accurate.
In this study the authors will discuss about uncertainty analysis of pile settlement based on soil investigation data and the result will be calibrated with the data of static axial loading test based on some projects in Jakarta, it is expected by using the key factors of uncertainty which is the initial step of the RBD will make the result more optimal and economical design while maintaining the safety of design.Key Word Uncertainty, Inherent variability, Safety Factor, Reliability and Pile Settlement.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49660
UI - Tesis Membership  Universitas Indonesia Library
cover
Dwi Sari Kurniawati
"ABSTRAK
Perkembangan wilayah Pantura Jakarta mengakibatkan penurunan kualitas lingkungan, salah satunya peningkatan konsentrasi TSS. Penelitian dilakukan pada perairan Teluk Jakarta dengan melakukan simulasi sebaran TSS dengan faktor oseanografi Teluk Jakar-ta menggunakan software MIKE 21 ECOLAB. Penelitian ini bertujuan untuk menganalisis pola sebaran TSS di Teluk Jakarta pada kondisi pra dan pasca reklamasi disaat musim barat dan timur. Hasilnya adalah musim barat dan musim timur mem-berikan korelasi terhadap konsentrasi TSS. TSS saat pra reklamasi pada beberapa titik telah melebihi baku mutu dan terjadi peningkatan konsentrasi saat pasca reklamasi, dengan beban TSS dari sungai 283,553.52 ton/tahun dan kecepatan arus di perairan Teluk Jakarta sebesar 0.02 ndash; 0.08 m/det maka konsentrasi TSS 38.80 ndash; 67.12 mg/l, pada titik ke arah laut konsentrasi TSS akan semakin kecil. Pulau reklamasi menyebabkan perubahan arah arus dan kecepatan arus, kecepatan arus yang kecil akan meningkatkan sedimentasi disekitar pulau reklamasi dan muara sungai, hal ini terlihat di sekitar pulau reklamasi telah melebihi baku mutu Permen LH No. 51 Tahun 2004. Kondisi antara konsentrasi TSS dengan indeks diversitas fitoplankton tidak sejalan, karena adanya faktor kecepatan arus yang memberikan peluang kepada plankton terbawa ke tempat lain, untuk memastikan kondisi tersebut maka perlu dilihat parameter DO, hara, dan khlorofil-a. Beban TSS akan menurun jika dilakukan pembangunan IPAL pada 14 zona di seluruh wilayah DKI Jakarta hingga 59.6 114,515 ton/tahun , upaya lain yang harus dilakukan adalah melakukan pengelolaan DAS terpadu untuk mengurangi erosi juga membangun sistem sanitasi yang baik disekitar DAS, selain itu juga diperlukan peran serta masyarakat dan penegakan hukum yang baik.

ABSTRACT
The expansion of the Pantura Jakarta area has had an impact of decrease in environmen tal quality, one of which is the increasing of TSS concentration. The study was conduct ed in the waters of Jakarta Bay by simulating the distribution of TSS with oceanograph ic factor of Jakarta Bay using MIKE 21 ECOLAB software. This study aims to analyze of TSS concentration distribution in Jakarta Bay in pre and post reclamation conditions during west and east seasons. The result is the west and east seasons providing a corre lation to the TSS concentration. TSS at pre reclamation at some point has exceeded the quality standard and increased concentration after reclamation, with TSS load from river 283,553.52 ton year and current velocity in Teluk Jakarta is 0.02 0.08 m s, TSS con centration is 38.80 67.12 mg l, at the point of the sea the TSS concentration will de crease. The reclaimed island causes changes in the direction of current and current ve locity, the small current velocity will increase the sedimentation around the reclaimed islands and river estuaries, it is seen that around the reclaimed island has exceeded the quality standard of Permen LH No. 51 2004. The condition between TSS concentration and phytoplankton diversity index is not aligned, due to the current velocity factor which gives chance to plankton to be brought to another place, to ensure the condition it is necessary to see the parameters of DO, nutrient, and chlorophyll a. The TSS load will decrease if IPAL is built on 14 zones across Jakarta area up to 59.6 114,515 tons year , another effort must be done is to manage the integrated watershed to reduce ero sion as well as build a good sanitation system around the DAS, also required communi ty participation and good law enforcement."
2017
T49216
UI - Tesis Membership  Universitas Indonesia Library
cover
Srikandi Wahyu Arini
"ABSTRAK
Indonesia merupakan negara yang rawan bencana. Data statistik BNPB menunjukan bahwa kejadian bencana terbanyak berada di bagian barat pulau Jawa dengan jenis bencana yang menimbulkan jumlah korban tertinggi adalah bencana tsunami. Kota Cilegon merupakan kota yang mempunyai tingkat kepadatan dan aktivitas industri tinggi karena adanya kawasan industri. Kota Cilegon terletak di sepanjang pantai barat Pulau Jawa dengan kondisi topografi yang landai sehingga Kota Cilegon sangat rawan terhadap bencana tsunami. Berdasarkan simulasi gempa yang dilakukan oleh BNPB, terjadinya gempa di selat sunda dapat menyebabkan tsunami yang berdampak pada terendamnya Kawasan Industri Cilegon hanya dalam waktu sekitar satu jam. Berdasarkan hal tersebut, tersedianya jalur evakuasi yang dapat mengakomodir evakuasi warga dengan jumlah besar dalam waktu singkat menjadi sangat penting. Tingkat ketahanan infrastruktur jalan adalah hal dasar yang sangat penting dalam mendukung kinerja jalur evakuasi pada keadaan darurat. Tingkat ketahanan jaringan yang buruk berdampak pada terhambatnya mobilitas dan aksesibilitas manusia ketika evakuasi bencana. Studi terdahulu mengenai jalur evakuasi di kota lain memperlihatkan bahwa jalur evakuasi yang ada sekarang ini dibuat hanya berdasarkan pengetahuan lokal dan topografi wilayah dengan tidak mempertimbangkan aspek ketahanan jaringan transportasi. Penelitian ini mencoba untuk mensimulasikan dampak akibat bencana terhadap sistem jaringan transportasi, mengukur tingkat ketahanan jaringan jalur evakuasi yang telah ada dan menganalisa kinerja jalur evakuasi yang ada pada Kota Cilegon dengan mempertimbangkan aspek ketahanan jaringan transportasi seperti kapasitas jalan dan konektivitas. Tujuan penelitian ini adalah untuk menganalisis dampak bencana tsunami terhadap sistem transportasi, untuk menganalisis tingkat ketahanan jalur evakuasi yang ada, dan untuk menganalisis apakah jalur evakuasi yang ada dapat mengakomodir evakuasi masyarakat ketika terjadi bencana tsunami. Untuk mencapai tujuan penelitian, dilakukan beberapa skenario simulasi evakuasi menggunakan perangkat lunak Vissim. Hasil simulasi menunjukan bahwa jalur evakuasi yang ada saat ini belum dapat mengakomodir masyarakat ketika terjadi bencana tsunami sehingga perlu dilakukan perbaikan yang dapat berupa penambahan alternative jalan, pelebaran jalan atau dengan pengaturan lalulintas.

ABSTRACT
Indonesia is vulnerable to natural disasters. Based on National Disaster Management Authority statistical data, the highest number of natural disaster occurs in the west side of Java island with Tsunami as the most deadly disaster. Cilegon is a city with high density and high industrial activity due to existence of industrial area. Cilegon is located along the west coast of Java island with a gently sloping topography, so that it is vulnerable to tsunami disaster. Earthquake simulation conducted by National Disaster Management Authority indicates that the occurrence of earthquake at Sunda strait will cause tsunami which can sweep away the whole industrial area in one hour. The availability of evacuation routes which are able to accommodate the evacuation of large amount of people within a short time become very important. Previous studies show that most of the existing evacuation routes are made just based on local knowledge and topography without considering the road network resilience factors such as road capacity and road connectivity. Referring only to the topography and local knowledge cannot guarantee the performance of the evacuation routes in evacuating large amount of people within a short time. Road infrastructure resilience is an important basic things in supporting the performance of the evacuation routes in emergency situation. Poor network resilience will reduce people rsquo s mobility and accessibility during the evacuation. This research try to analyze the impact of tsunami to the transportation system in Cilegon, to analyze the resilience level of evacuation route, and to analyze whether the existing evacuation routes are able to accommodate the evacuation process in Cilegon. In order to achieve these goals, a simulation of people rsquo s travel behavior during the evacuation process is conducted using VISSIM software. Simulation result shows that Cilegon rsquo s evacuation routes are not resilience enough to accommodate the evacuation process and still need an improvement such as by adding more alternative roads, by adding the road width, or by doing traffic management."
2017
T49194
UI - Tesis Membership  Universitas Indonesia Library
cover
Aulia Qisthi
"Biodiesel sebagai bahan bakar nabatimemiliki potensi besar terhadap kelangsungan bahan bakar alternatif di masa mendatang. Biodiesel yang dapat dihasilkan melalui sumber daya terbarukan seperti minyak nabati, ataupun lemak hewan tersebut digunakan dalam studi ini. Tujuan utama dari penelitian yang dilakukan adalah untuk menghasilkan biodiesel dari beberapa jenis sumber minyak nabati dan lemak hewan untuk memiliki profil metil ester yang beragam dalam melihat adanya potensi korelasi antara profil metil ester dengan kualitas produksi biodiesel yang dihasilkan. Produksi biodiesel dilakukan dengan tujuh jenis minyak/lemak yang berbeda. Minyak nabati yang digunakan yakni minyak bunga matahari, minyak kacang tanah, minyak kenari, minyak rapeseed, minyak kelapa terhidrogenasi dan minyak kopra terhidrogenasi serta lemak daging sapi. Setelah produksi biodiesel dilakukan, kualitas biodiesel tersebut pun kemudian diuji sesuai peraturan dan spesifikasi standar EN 14214. Berdasarkan hasil penelitian yang telah dilakukan, diketahui bahwa terdapat hubungan yang kuat antara komposisi metil ester dengan beberapa parameter penting biodiesel seperti viskositas, densitas, titik nyala api, titik penyumbatan cold filter plugging point , nilai kalor lebih tinggi, bilangan iodium dan bilangan saponifikasi. Hasil penelitian menunjukkan bahwa tingkat ketidakjenuhan yang tinggi pada biodiesel akan meningkatkan nilai densitas dan nilai kalor lebih tinggi. Di sisi lain, ikatan rangkap yang terdapat pada biodiesel akan menurunkan stabilitas oksidasi dan mengurangi nilai viskositas biodiesel. Selain itu, tingginya jumlah bilangan saponifikasi akan meningkatkan nilai densitas biodiesel, tetapi untuk parameter titik nyala api, hasil penelitian menunjukkan adanya korelasi yang lemah antara titik nyala api dengan bilangan iodium dan bilangan saponifikasi.

Biodiesel as an alternative diesel fuel holds promise for the future of alternative fuels. Biodiesel that derived from renewable resources such as vegetable oil was used in this experimental study. The main objective of this study to produce biodiesel from different initial feedstock and to study the composition and the quality of biodiesel profile synthesized. Biodiesels were produced from seven different types of vegetable oil sunflower, peanut, walnut, beef tallow, rapeseed, hydrogenated coconut and hydrogenated copra oil . Then, biodiesel quality was tested according to the EU 14214. The results have related methyl ester profile to several specifications such as viscosity, density, flash point, cold filter plugging point, higher heating value, iodine value and oxidative stability. The results show that high degree of unsaturation will increase the higher heating value and density. On the other hand, large number of double bonds will lower the oxidation stability and reduce viscosity. Moreover, high amount of saponification value will increase the number of density. However, the result shows a weak correlation between flash point in function of iodine value and saponification value."
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49729
UI - Tesis Membership  Universitas Indonesia Library
cover
Pratika Riris Putrianti
"ABSTRAK
Studi Perbandingan Analisa Riwayat Waktu Dan Respons Spektrum Untuk Bangunan Tinggi Dengan Denah Berbentuk U Berdasarkan SNI 1726-2012 Pada saat ini gedung bertingkat tinggi semakin banyak diminati karena jumlah lahan yang tersedia semakin terbatas. Salah satu bentuk denah gedung yang sering digunakan adalah denah gedung berbentuk huruf U. Denah berbentuk U ini sering digunakan pada gedung apartemen dan hotel karena dianggap efektif dalam menampung luas area bangunan yang diinginkan pada tanah yang tidak terlalu luas namun semua sisi ruang pada gedung tetap mendapatkan akses pemandangan ke arah luar. Gedung yang dianalisa pada tesis ini adalah gedung yang memiliki denah berbentuk U yang memiliki ketidakberaturan horizontal yang divariasikan terhadap perbandingan panjang dan lebar denah gedung serta juga terhadap ketinggiannya, yaitu H:D = 5:5, 4:5 dan 2,25:5 dengan ketinggian 20 dan 30 lantai. Variasi sudut dalam panjang dan lebar denah dibuat lebih dari 15 dari ukuran terbesar denah struktur gedung dalam arah sisi yang ditinjau. Evaluasi studi perbandingan bangunan tinggi dengan denah berbentuk U dengan metode analisa riwayat waktu dan analisa respons spektrum, dimana analisa riwayat waktu memberikan hasil yang lebih kecil dalam segi rasio penulangan dan presentase berat tulangan, story drift, story shears, base reaction, jika dibandingkan dengan analisa respons spektrum.Efek ketidakberaturan sudut yang terjadi akibat bentuk denah yang digunakan memberikan pengaruh terhadap elemen kord dan kolektor yang digunakan dalam analisa riwayat waktu yang lebih kecil daripada analisa respons spektrum. Bangunan yang dianalisa dengan analisa dinamik Time History menghasilkan berat tulangan yang lebih sedikit rata-rata hampir 10 dibandingkan dengan analisa dinamik Respons Spektrum pada semua model. Untuk berat tulangan shear wall pada analisa Time History kurang lebih hampir sama dengan berat tulangan pada analisa Respons Spektrum, hanya lebih kecil 3 dari analisa Respons Spektrum.

ABSTRACT
Study Comparison of Time History Analysis and Spectrum Responses Analysis to High Rise Building with a U Shaped Plan Based On SNI 1726 2012 Multistories building is now become popular since the available space of land is being limited. One type of shape are often used is U shapped plan.U shapped plan usually applied for apartement and hotel building that considered effective to accommodate required building are on limited land space without reducing access to obtain landscape for all room on building. Building that will be analyzed on this thesis has horizontal irregularities of U shapped plan which is varying in term of length and with of plan and building hight, that is H D 5 5, 4 5 and 2,25 5 and height of 20 and 30 floor.Variation of reentrant corner in term of length and width of plan is 15 of greather plan dimension of building on considered side. Evaluation of high rise comparative studies with U shaped plan with time history analysis and spectrum response analysis, where time history analysis gives smaller result in terms of repeatability ratio and weight percentage of reinforcement, story drift, story shears, base reaction, when compared with analysis response spectrum.The corner irregularity effect due to the shape of the floor plan used to influence the chord and collector elements used in the time history analysis is smaller than the spectrum response analysis. Buildings analyzed by Time History dynamic analysis resulted in fewer reinforcement weight averaging nearly 10 compared to dynamic analysis of Spectrum Response on all models. For shear wall weights in Time History analysis approximately equal to the reinforcement in Spectrum Response analysis, only less than 3 of Spectrum Response analysis."
2017
T49761
UI - Tesis Membership  Universitas Indonesia Library
cover
Ponco Atmoko
"ABSTRAK
Bangunan Menara Syahbandar adalah salah satu bangunan tua yang dibangun pada tahun 1839. Bangunan ini merupakan salah satu Bangunan Cagar Budaya yang keberadaannya dilindungi oleh Undang-Undang dan wajib dilestarikan. Sistem struktur bangunan ini ialah struktur pasangan batu bata yang berfungsi sebagai penahan beban gravitasi dan penahan beban gempa. Penelitian ini bertujuan untuk menganalisa respon bangunan Menara Syahbandar dengan pembebanan gempa riwayat waktu dengan tiga catatan gempa yaitu Pandeglang, Sukabumi, Tasikmalaya yang telah dimodifikasi sesuai ketentuan SNI 1726-2012 dan pembebanan response spektrum desain untuk wilayah gempa DKI Jakarta, dengan jenis tanah lunak SE . Penelitian dilakukan dengan menggunakan bantuan pemrograman komputer dengan pemodelan dinding sebagai elemen shell dan solid. Pengujian lapangan berupa pengujian mikrotremor dilakukan sebagai pembanding periode getar bangunan terhadap hasil pemodelan komputer. Penelitian bertujuan untuk mengetahui respon seismik bangunan terhadap pembebanan gempa. Dari hasil penelitian, terjadi konsentrasi tegangan di sekitar bukaan jendela maupun pintu yang kemungkinan dapat terjadi kegagalan ketika terjadi gempa besar, terutama kegagalan geser.

ABSTRACT
Menara Syahbandar is one of the historical buildings built in 1839. This building is one of the Heritage Buildings whose existence is protected by law and must be preserved. This building structure system is a masonry structure that serves as a burden of gravity load and earthquake load resistance. This study aims to analyze the response of Menara Syahbandar tower with the loading of earthquake history with three earthquake records Pandeglang, Sukabumi, Tasikmalaya that have been modified in accordance with the provisions of SNI 1726 2012 and loading the design spectrum response for the earthquake area of DKI Jakarta with soft soil type SE . The study was conducted using the help of computer programming with wall modeling as a shell and solid element. Field testing in the form of microtremor testing is done as a comparison of the building vibration period to computer modeling results. The purpose of this research is to find out the seismic response of the building to earthquake loading. From the results of the research, there is a concentration of stress around the void, window or door openings when a large earthquake occurs."
2017
T49789
UI - Tesis Membership  Universitas Indonesia Library
cover
Utami Widiyaningsih
"Keterlaksanaan konstruksi constructability merupakan sebuah pendekatan yang menghubungkan proses desain dan konstruksi sehingga dapat menghemat waktu untuk menyelesaikan suatu proyek konstruksi Trigunarsyah, 2004. Salah satu konsep dari constructability adalah penggunaan modularisasi pracetak precast . Industrialised Building System IBS merupakan teknik konstruksi dimana komponen ndash; komponennya diproduksi di lingkungan yang terkendali di luar atau di dalam site.
Penelitian ini bertujuan untuk mengetahui faktor pendukung dan faktor penghambat yang paling dominan dalam penerapan IBS serta strategi penerapan konsep constructability yang difokuskan kepada konsep penggunaan IBS untuk meningkatkan kinerja waktu pada proyek Pembangunan Rusun di Indonesia.
Metode penelitian berupa studi kasus pada Proyek Rancang Bangun Pembangunan Rumah Susun Bertingkat Tinggi, Kemayoran yang dibangun oleh Kementerian PUPR Tahun Anggaran Tahun Jamak 2016-2017. Dengan menggunakan metodologi tinjauan pustaka, wawancara semi terstruktur kepada pakar atau praktisi, dan kuesioner kepada kontraktor dan pemilik proyek, diperoleh 3 faktor pendukung yang paling dominan, 4 faktor penghambat yang paling dominan dan 11 strategi penggunaan IBS untuk meningkatkan kinerja waktu.

Constructability is an approach that links the design and construction process so that it can save time to complete a construction project Trigunarsyah, 2004. One concept of constructability is the use of precast modularization precast. Industrialised Building System IBS is a construction technique in which components are produced in a controlled environment outside or inside the site.
This study aims to identify the most dominant enablers and barriers in the application of IBS and the strategy of applying the concept of constructability which is focused on using of IBS to improve the time performance in the apartment construction project in Indonesia.
The research method is a case study on the High rise Apartment Construction Design Build Project, Kemayoran that built by the Ministry of PUPR by Multi Years 2016 2017. Using the literature review methodology, semi structured interviews to experts or practitioners, and questionnaires to contractors and project owners, obtained 3 of the most dominant enablers, the 4 most dominant barriers and 11 IBS use strategies to improve time performance.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49180
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>